Find or Sell Used Cars, Trucks, and SUVs in USA

One-owner~non-smoker~loaded~leather~moonroof~navigation~sky Slider Open Roof~tow on 2040-cars

US $18,340.00
Year:2010 Mileage:45753
Location:

Sterling, Virginia, United States

Sterling, Virginia, United States
Advertising:

Auto Services in Virginia

Wrenches on Wheels ★★★★★

Auto Repair & Service
Address: Beaverdam
Phone: (804) 277-9093

Virginia Tire & Auto ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automotive Tune Up Service
Address: 43230 Defender Dr, Chantilly
Phone: (703) 327-1766

Transmissions of Stafford ★★★★★

Auto Repair & Service, Auto Transmission
Address: 435 Ferry Rd, Thornburg
Phone: (540) 621-0632

Shorty`s Automotive Inc ★★★★★

Auto Repair & Service, Automobile Diagnostic Service, Automobile Inspection Stations & Services
Address: 12708 Nettles Dr, Fort-Eustis
Phone: (757) 930-0045

Shell Rapid Lube ★★★★★

Auto Repair & Service, Auto Oil & Lube
Address: 3630 S Main St, Blacksburg
Phone: (540) 552-0605

Salem Car Shop Inc ★★★★★

Used Car Dealers
Address: 203 E 4th St, Villamont
Phone: (866) 595-6470

Auto blog

What will Detroit do with the abandoned AMC headquarters?

Mon, Dec 28 2015

As with so many other industrial and residential properties in Detroit, the former headquarters for the American Motors Corporation is having a hard time finding a reputable buyer. In October the Wayne County Treasurer held a tax foreclosure auction of 25,000 properties that included the AMC building, the starting bid being $500. Nicholas Casab won the building for $500, but the county voided the sale when Casab didn't pay the $232,000 in back property taxes. Detroit authorities haven't commented on the failed sale, but the city has until January 4 to decide if it wants to keep the building. If it doesn't want to hold onto it, the 1.5-million-square-foot property on 57 acres might be ceded to the Wayne County Land Bank Corporation. No matter who holds the deed come January 5, all anyone really wants is for someone to take possession of the building who will actually turn it into something useful and viable. The property opened in 1927 as a factory for the Kelvinator Corporation. Over the following decades, Kelvinator merged with the Nash Motor Company, and that merged entity merged with Hudson Motor Car Co, becoming American Motors. Chrysler took over the building in 1987 when it bought AMC, then shuttered it in 2009. The complex has produced refrigerators, Sikorsky helicopters, Jeeps, AMCs, and was used as an engineering center for Jeeps and other Chrysler products. Having been through several hands in the past six years, it is cited as part of the cycle of abandonment plaguing Detroit. Related Video: News Source: Detroit Free Press Government/Legal Chrysler Jeep Auctions Detroit amc

Fiat Chrysler Automobiles recalls nearly 750k vehicles in two campaigns

Thu, 16 Oct 2014

Fiat Chrysler Automobiles is recalling a total of 747,817 vehicles in the US in two separate campaigns recently added to the National Highway Traffic Safety Administration database.
The first one covers about 434,581 units of the Chrysler 300, Dodge Charger, Challenger, Durango, and Jeep Grand Cherokee from the 2011-2014 model years with electric hydraulic power steering, the 3.6-liter V6 engine and a 160 amp alternator, according to FCA. In the affected vehicles, it's possible for the alternator to fail without warning and possibly cause the car to stall. According to the documentation submitted to NHTSA, the automaker began investigating the problem in August 2014 and has found possible evidence of one crash caused by the failures but no known injuries.
Customers will begin receiving notification about the recall next month, and obviously the repairs will be done at no cost to them.

Stellantis invests more than $100 million in California lithium project

Thu, Aug 17 2023

Stellantis said it would invest more than $100 million in California's Controlled Thermal Resources, its latest bet on the direct lithium extraction (DLE) sector amid the global hunt for new sources of the electric vehicle battery metal. The investment by the Chrysler and Jeep parent announced on Thursday comes as the green energy transition and U.S. Inflation Reduction Act have fueled concerns that supplies of lithium and other materials may fall short of strong demand forecasts. DLE technologies vary, but each aims to mechanically filter lithium from salty brine deposits and thus avoid the need for open pit mines or large evaporation ponds, the two most common but environmentally challenging ways to extract the battery metal. Stellantis, which has said half of its fleet will be electric by 2030, also agreed to nearly triple the amount of lithium it will buy from Controlled Thermal, boosting a previous order to 65,000 metric tons annually for at least 10 years, starting in 2027. "This is a significant investment and goes a long way toward developing this key project," Controlled Thermal CEO Rod Colwell said in an interview. The company plans to spend more than $1 billion to separate lithium from superhot geothermal brines extracted from beneath California's Salton Sea after flashing steam off those brines to spin turbines that will produce electricity starting next year. That renewable power is expected to cut the amount of carbon emitted during lithium production. Rival Berkshire Hathaway has struggled to produce lithium from the same area given large concentrations of silica in the brine that can form glass when cooled, clogging pipes. Colwell said a $65 million facility recently installed by Controlled Thermal can remove that silica and other unwanted metals. DLE equipment licensed from Koch Industries would then remove the lithium. "We're very happy with the equipment," he said. "We're going to deliver. There's just no doubt about it." Stellantis CEO Carlos Tavares called the Controlled Thermal partnership "an important step in our care for our customers and our planet as we work to provide clean, safe and affordable mobility." Both companies declined to provide the specific investment amount. Controlled Thermal aims to obtain final permits by October and start construction of a commercial lithium plant soon thereafter, Colwell said. Goldman Sachs is leading the search for additional debt and equity financing, he added.