2008 Ford F250 4x4 Crew Cab Diesel on 2040-cars
Paxton, Illinois, United States
2008 ford f250 4x4 6.4 diesel crew cab. put on new tires 4000 miles ago. runs and drves good i drive it every day
60 miles it has 112000 miles on it. have put on egr and exhaust filter detete and has a programmer. it is a rebuilt truck. i bought it 3 years ago and have had no problems. it does have a clear title. call if you have questions thanks mike 217 417 5059 |
Ford F-250 for Sale
- 2013 king ranch crew 4x4 fx4 navigation sunroof leather heated 20s aluminum(US $55,704.00)
- 2005 ford f250 super duty crew cab 6.0l v8 powerstroke auto 4x4 lariat pkg(US $15,500.00)
- 2013 king ranch crew 4x4 fx4 navigation sunroof leather heated 20s aluminum v8(US $55,290.00)
- 2008 ford super duty f-250 srw 4wd crew cab xlt 4x4 ** warranty **
- 2014 navigation sunroof leather heated 20s aluminum v8 diesel lifetime warranty(US $53,068.00)
- 2013 ford f250
Auto Services in Illinois
Zeigler Fiat ★★★★★
Wagner`s Auto Svc ★★★★★
US AUTO PARTS ★★★★★
Triple D Automotive INC ★★★★★
Terry`s Ford of Peotone ★★★★★
Rx Auto Care ★★★★★
Auto blog
3dCarbon now offering body kit for Ford Fusion
Tue, 01 Oct 2013A factory-backed body kit by 3dCarbon is now available to Ford Fusion owners who want their car to stand out from the crowd while not being too flashy. The body kit adds a more aggressive front spoiler, side skirts, rear body trim and spoiler that are, in fact, integrated quite nicely into the Fusion's already-comely styling, just as 3dCarbon claims. All Fusions with the kit also receive dual exhaust ports with the stainless-steel exhaust surrounds usually reserved for the Titanium package Fusion EcoBoost models.
A nice detail of 3dCarbon's injection-molded urethane body kit is that it has undergone crash testing to certify that it can withstand crashes up to five miles per hour. Because of this, the kit is warrantied by 3dCarbon for five years or 50,000 miles, much like Ford's warranty on its own parts. In fact, the kit is available through participating Ford dealers and can be financed through Ford Motor Credit. Buyers can purchase the kit - pre-painted or unpainted - and install it themselves, or it can be purchased with a new Ford Fusion and installed at the dealer, pre-painted to factory specifications. Of course, it can also be ordered directly from the source. Take a look at the press release below for more detailed information on the body kit, and let us know what you think of it in Comments.
Ford adds 850 jobs to build 2015 F-150
Tue, 14 Oct 2014Pickup trucks tend not to advance at quite the same pace as the rest of the industry. That's what makes the new Ford F-150 so remarkable, jettisoning its old steel construction in favor of aluminum. It's a game changer that Ford is betting big on, and in anticipation of surging demand, the Blue Oval automaker is adding 850 new jobs to put the thing together.
Those 850 new employees will be centered at Ford's Rouge complex in Michigan - with 300 at Dearborn Stamping, 50 more at Dearborn Diversified and 500 at the Dearborn Truck facility, the latter of which has already kicked off what Ford describes as "the largest manufacturing transformation in decades." Old manufacturing equipment is being replaced with the latest technologies, and even the Ford Rouge Factory Tour is undergoing a complete overhaul.
The new jobs come as part of the commitments Ford made to the UAW in 2011 to create 12,000 hourly jobs in the United States by 2015 - a number which Ford has already exceeded at 14,000. Over 4,000 of those are centered in southeastern Michigan.
Here's what the UAW will be angling for in next year's contract negotiations
Mon, Dec 15 2014The United Auto Workers union is about to enter a new round of negotiations with the Detroit Three automakers, and this time, the focus is on the end of the two-tier wage system. Introduced in 2007, the two-tier wage system was enacted to allow General Motors, Ford and Chrysler to categorize its hourly employees under two categories: Tier 1 for veteran employees with full rights and benefits, and Tier 2 for short-term or entry-level employees compensated under a different schedule. The idea was that the system would permit the automakers to invest more in their plants and hire new employees as part of their respective recovery plans without being saddled with all the costs associated with hiring full-time employees. Now that the automakers are (more or less) back on their proverbial feet, however, the UAW wants to see an end to the two-tier system, and will likely make that a center-point of its negotiations next year to replace the current arrangement that is scheduled to end in September 2015. Not all members of the UAW will necessarily be interested in ending the two-tier system, however. According to The Detroit News, some Tier 1 workers may be more interested in negotiating a raise in their hourly rate – something which they haven't received in almost a decade. Tier 2 workers, meanwhile, may be more motivated to keep the tiered system in place, as their arrangement includes provisions for profit-sharing payments that have seen the automakers pay out billions to so-called short-term employees in lump-sum payments. Reconciling the two competing demands from two categories of union members and presenting a united front in negotiations may prove the biggest challenge for the UAW's new president, Dennis Williams. And with the right to strike – something which was suspended during the last round of negotiations in 2011 – the union has a bigger bargaining chip in its pocket.