2000 Volkswagen Eurovan Mv 2.8l No Reserve Nr on 2040-cars
Redondo Beach, California, United States
Body Type:Standard Passenger Van
Vehicle Title:Clear
Engine:2.8L V6 Cylinder Gasoline Fuel
Fuel Type:GAS
For Sale By:Dealer
Make: Volkswagen
Model: EuroVan
Trim: 3door
Options: Sunroof
Safety Features: Driver Airbag, Passenger Airbag
Drive Type: v6
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows, Power Seats
Mileage: 121,500
Sub Model: Eurovan MV Clean & Runs Strong No Reserve NR
Exterior Color: Gray
Number of Doors: 4
Interior Color: Gray
Warranty: Vehicle does NOT have an existing warranty
Number of Cylinders: 6
Volkswagen EuroVan for Sale
- 1999 westfalia* only 89k* dvd* nav* ipod* bluetooth* 98 00 01 02 03 04* must see(US $24,888.00)
- 2002 vw eurovan camper vista 53k showroom bathroom generator 1 of a kind(US $31,500.00)
- 2001 vw eurovan camper pop top super clean sleeps 4 stove and sink(US $27,599.00)
- 1993 volkswagen eurovan mv standard passenger van 3-door 2.5l 60600 miles(US $9,000.00)
- 2003 volkswagen eurovan, only 43,291 miles, just serviced
- 2000 volkswagen eurovan mv standard passenger van 3-door 2.8l(US $5,900.00)
Auto Services in California
ZD Autobody ★★★★★
Z Benz Company Inc ★★★★★
Www.Bumperking.Net ★★★★★
Working Class Auto ★★★★★
Whittier Collision Center #2 ★★★★★
West Tow & Roadside Servce ★★★★★
Auto blog
BMW, VW partner with ChargePoint for high-speed charging network
Thu, Jan 22 2015To promote their plug-in electric vehicles, a number of electric vehicle makers are working overtime to get a charging infrastructure set up. Tesla is famously setting up a network of Superchargers around the world, and today BMW and VW have announced they are partnering with ChargePoint to install almost 100 DC Fast Chargers up and down the US coasts. Installing additional Level 2 chargers is also part of the plan. The new DC Fast Chargers will offer the SAE Combo connectors, which is available on both the e-Golf and the i3. The fast chargers will have "up to two 50 kW DC Fast chargers, or 24 kW DC Combo Fast chargers," BMW says. They will be installed roughly 50 miles apart between Boston and Washington, DC in the east as well as Portland, San Francisco, Los Angeles and San Diego in the west. The 24-kW DC Fast Chargers will fill up an empty i3 or e-Golf to 80 percent in a half-hour or 3.5-4 hours from the Level 2 cords. Speaking at an announcement ceremony at the Washington Auto Show today, ChargePoint CEO Pasquale Romano said that infrastructure investments like this will get more people to realize that they can use an electric vehicle as their only car, and Jorg Sommer, VP of product marketing and strategy for VW North America, said that it's clear that, "The EV is perfect for the daily driver." BMW, Volkswagen and ChargePoint Join Forces to Create Electric Vehicle Express Charging Corridors on the East and West Coasts. · A goal of nearly 100 DC Fast charging ports will be installed to support long distance and metropolitan electric vehicle travel with the BMW i3, Volkswagen e-Golf and other electric cars, along heavily trafficked corridors on both coasts, supported by Level 2 chargers. · These publicly available charging stations will be added to the existing ChargePoint network and can be easily accessed using a ChargePoint® or ChargeNow card. Washington, D.C., January 22, 2015 – At the 2015 Washington Auto Show, two of the top automakers, BMW of North America and Volkswagen of America, together with ChargePoint, the largest electric vehicle charging network, announced an initiative to create express charging corridors along heavily-traveled routes on the East and West Coasts.
VW may move production because of Russia's cutoff of natural gas
Sun, Sep 25 2022Volkswagen AG is exploring ways to counter a shortage in natural gas, including shifting production around its network of global facilities, signaling how the energy crisis unleashed by Russia’s invasion of Ukraine threatens to upend EuropeÂ’s industrial landscape. Volkswagen, EuropeÂ’s biggest carmaker, said Thursday that reallocating some of its production was one of the options available in the medium term if gas shortages last much beyond this winter. The company has major factories in Germany, the Czech Republic and Slovakia, which are among European countries most reliant on Russian gas, as well as facilities in southern Europe that source energy from elsewhere. “As mid-term alternatives, we are focusing on greater localization, relocation of manufacturing capacity, or technical alternatives, similar to what is already common practice in the context of challenges related to semiconductor shortages and other recent supply chain disruptions,” Geng Wu, VolkswagenÂ’s head of purchasing, said in a statement. RussiaÂ’s decision to throttle gas supplies to Europe has raised concerns that Germany might be forced to ration its fuel. Recent news that gas storage levels hit 90% ahead of schedule has soothed fears of acute shortages this winter, but Germany faces a challenge in replenishing depleted reserves next summer without contributions from Russia. Southwestern Europe or coastal zones of northern Europe, both of which have better access to seaborne liquefied natural gas cargoes, could be the beneficiaries of any production shift, a Volkswagen spokesman said by phone. The Volkswagen group already operates car factories in Portugal, Spain and Belgium, countries that host LNG terminals. Labor hurdles To be sure, any major production shift away from EuropeÂ’s biggest economy would face significant hurdles. VW has some 295,000 employees in Germany and worker representatives account for around half the companyÂ’s 20-member supervisory board. Any shift in production would likely involve a limited number of vehicles rather than wholesale factory shutdowns. While gas supplies for VWÂ’s plants are currently secured, the company has identified potential savings at its European sites to cut gas consumption by a “mid-double-digit percentage,” said Michael Heinemann, managing director of VWÂ’s power-plant unit. Still, the carmaker said it was concerned about the effect high gas prices could have on its suppliers.
VW builds 250,000th Passat in Chattanooga in just two years
Sun, 26 May 2013It hasn't been without incident or union organizing drive, but the Volkswagen plant in Chattanooga, TN has built its 250,000 Passat in just a little over two years. The Night Blue Passat TDI with black leather has come just two years and five weeks after the first customer car came off the line on April 18, 2011.
In the last year the plant operated at the 150,000-unit capacity that it was intended for, but the downturn in Passat sales and subsequent worker layoffs mean it will be a challenge to repeat the feat. The plant does have the world's largest solar park, though, and you can't take that away from them.
You'll find the official hand-clapping in the press release below.