1980 Toyota Land Cruiser Fj40 on 2040-cars
Prineville, Oregon, United States
1980 toyota fj40, this fj40 starts and runs excellent with i believe to be 86k original miles, very nice condition with alot of add ons, the stock 4 speed has been replaced with a 5 speed out of a fj60, for better milage down the hwys, it has a H.D man-a-fre front bumper with a warn winch. 4" safari suspension lift with inversion greasable shackles, front shackel reversal also done. steering stabilizer. brakes rebuilt a year ago, newer radiator, newer optima battery, new alternator, newer starter, a weber 38mm carb, exhaust header, newer exhaust and muffler a year ago, rear H.D bumper with reciever and trailer plug. the frame and axles have been cleaned and coated with p.o.r.15, it still has the original rear jump seats that are in really great shape, rear heater and just put on brand new tires and wheels. the overall body is in excellent condition, this fj is owned by a friend, any ?s or more info on anything please email me. buyer is responseable for shipping, i have a shipping connection if interested, this company has been really great to work with, they ship all over the u.s. if interested contact me and i can get you the number and name. |
Toyota Land Cruiser for Sale
1968 toyota fj40(US $7,250.00)
1985 toyota land cruiser base sport utility 4-door 4.2l
2008 toyota land cruiser 4dr 4wd(US $32,988.00)
2014 land cruiser - heated leather, nav, 4wd, 3rd row seats, backup camera(US $69,940.00)
1996 toyota land cruiser base sport utility 4-door 4.5l
1977 toyota fj40 landcruiser
Auto Services in Oregon
Vista Body Shop Inc ★★★★★
Tualatin Auto Body & So - Cal Northwest ★★★★★
Truck Designs Auto Body ★★★★★
Transmission Unlimited ★★★★★
Tom Denchel`s Country ★★★★★
The Ugly Chip ★★★★★
Auto blog
Post-earthquake, Toyota prepares to reopen some plants in Japan
Wed, Apr 20 2016Toyota will restart vehicle production at most of its closed factories in Japan next week, but the factories that build the Mirai and many Lexus models will remain closed through at least April 28 and possibly longer. The earthquakes around the city of Kumamoto on the island of Kyushu forced the automaker to stop most of its assembly throughout the country due to a lack of parts supply. Toyota will reopen the plants in phases from April 25 to 28. However, the Motomachi factory with its LFA works, which makes the Mirai, and the Miyata factory will remain closed. These sites also build the Lexus NX, RX, ES, GS, and CT, according to Toyota. The automaker didn't say when production would begin again or how this would affect vehicle supply. "In the update, we received this morning from TMC, they said that at this stage it is too soon to tell what the impact on production will be, so we can't say yet whether there might be vehicle shortages in the US," spokesperson Aaron Fowles told Autoblog. While the quakes were focused on Kyushu, they damaged Aisin Seiki factories, which supplied parts to Toyota plants across the country. The automaker worked with its partner to import the necessary components from China and Mexico, and Aisin started moving molds from the damaged plants to operational ones in Japan, which gets production under way sooner. Automotive News Europe estimates the week of lost production cuts total assembly by 90,000 vehicles. It could cost Toyota the equivalent of $458.2 million to $641.5 million. The company could make up some of the losses through overtime. Toyota says these plans are subject to change because on ongoing tremors in the region, which could cause more damage. Reuters reported there was a magnitude 5.5 aftershock in the Kumamoto area on April 19. So far, the quakes have killed at least 47 people and around 100,000 people have moved to evacuation centers. Toyota to Restart Production on Vehicle Assembly Lines in Japan from April 25 Apr. 20, 2016 Toyota City, Japan, April 20, 2016-Between April 25 and 28, Toyota will restart production on most of its vehicle assembly lines in Japan. On April 17, Toyota announced that, due to parts shortages resulting from the severe earthquakes that struck Japan's island of Kyushu last week, production would be suspended on almost all of its vehicle assembly lines in stages between April 18 and 23.
BMW M850i Coupe, Jeep Wrangler Rubicon and a 1996 Toyota Land Cruiser | Autoblog Podcast #585
Thu, Jun 20 2019In this week's Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Senior Editor Alex Kierstein and Senior Editor, Green, John Snyder. This week, they talk about driving the BMW 8 Series Coupe, Jeep Wrangler Rubicon and Toyota Corolla Hatchback. Then they talk about the news, including electric Hummer rumors and Tesla pickup timing. Finally, they consider whether or not Greg should buy his neighbor's 1996 Toyota Land Cruiser. Autoblog Podcast #585 Get The Podcast iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown Cars we're driving: BMW M850i xDrive Coupe Jeep Wrangler Rubicon Toyota Corolla Hatchback In the news: Is an all-electric Hummer in the works? Tesla pickup truck is on its way Spend My Money: 1996 Toyota Land Cruiser Feedback Email – Podcast@Autoblog.com Review the show on iTunes Related Video:
Ford F-150 could be affected by tornado-damaged supplier in S.C.
Wed, Apr 22 2020The disruption caused by a tornado that severely damaged a South Carolina auto-parts plant and killed a contract security guard last week could be felt by more automakers than just Ford and affect more than just its best-selling F-Series pickup, which is due for an update. And there’s still no estimate for when operations might resume at the plant. The Detroit Free Press reports that the BorgWarner plant in Seneca, near Greenville, makes transfer cases for F-150 and Super Duty pickups, the Ford Explorer and Expedition, Transit cargo vans, and Lincoln Navigator and Aviator SUVs. ItÂ’s also a supplier for the Ram 1500 and Toyota Tundra trucks. Transfer cases shift power from the transmission to the front and rear axles in four-wheel-drive vehicles. BorgWarner says it still has no update for when it might partially or fully resume operations. The tornado that ripped through the area in the western part of the state on April 13 tore the roof, walls and signage off the factory and killed a 77-year-old contract worker when the security building he was sheltering in collapsed. Only four or five others were inside the plant, which has been idled because of the coronavirus outbreak, when the tornado struck. In an SEC filing on Friday, Ford said it has sent employees to the site to help BorgWarner and assess the damage to FordÂ’s tooling. “Initial assessments indicate that the Ford tooling was not materially damaged in this incident,” Ford said in the filing. “We do not have sufficient information to estimate when the facility will be back on-line or whether or the extent to which this incident will impact our plans to resume production of four-wheel drive and all-wheel drive vehicles.” A Fiat Chrysler spokeswoman also told the Freep the company was working with BorgWarner on recovery plans. A Toyota spokesman told Autoblog that "we are collaborating with BorgWarner to help restore production for transfer cases for Tundra assembly. We are confident that theyÂ’ll fully recover over time." Like other automakers, Ford shut down production at its U.S. plants last month as a precaution against the coronavirus pandemic. But Ford hasnÂ’t yet said when it plans to reopen its factories. FCA is targeting May 4 to resume production. Models like the F-150 and Lincoln Navigator are major sources of profit for Ford, which estimated it lost $2 billion in the first quarter.