2009 Nissan 370z Nismo Coupe 2-door 3.7l on 2040-cars
Irving, Texas, United States
This Nismo Z has been babied its entire life and really drives like a dream. If you are looking for a clean example of a very rare 370Z this is the car you want.
Super Low Buy it now price! Tires look brand new, clutch is in excellent shape, and car runs solid mechanically. No issues at all with this car. Please bid with confidence. Car is located in Dallas, Tx and is being offered for sale locally. Seller reserves the right to cancel this auction if it is sold. This will be a NO RESERVE auction! No games here, this car is ready to move! Please feel free to ask me any questions at all about the car, If you need any other pictures let me know, I can confirm anything you want about the condition of this car. |
Nissan 370Z for Sale
- 2010 nissan 370z convertible touring loaded navigation htd/cld(US $29,887.00)
- 2012 nissan 370z nismo coupe 2-door 3.7l(US $35,900.00)
- 2010 nissan 370z 37k local trade awesome shape we finance(US $27,981.00)
- 2012 nissan 370z nismo!!
- 2009 nissan 370z touring coupe 2-door 3.7l(US $21,900.00)
- 2009 nissan 370z base coupe 2-door 3.7l
Auto Services in Texas
Zepco ★★★★★
Z Max Auto ★★★★★
Young`s Trailer Sales ★★★★★
Woodys Auto Repair ★★★★★
Window Magic ★★★★★
Wichita Alignment & Brake ★★★★★
Auto blog
Nissan recalling 2012-14 Frontier pickups over fire risk
Mon, 24 Feb 2014Nissan is recalling its Frontier pickup over fire concerns, according to a National Highway Traffic Safety Administration bulletin. A total of 13,535 vehicles are being recalled, all from the 2012 to 2014 model years, built between November 28, 2012 and December 27, 2013.
The NHTSA report states that "in the affected vehicles, a circuit breaker may have been installed incorrectly causing the main wire harness connected to the circuit breaker to face outward, potentially contacting a metal bolt located on the A-pillar." If this happens, it's possible that "the bolt may wear though the wire harness covering, resulting in an electrical short," NHTSA states. In the event of an electric short, a fire may occur.
The official recall will begin in March, where Nissan dealers will inspect the circuit breaker for the correct orientation, and if necessary, repair the vehicles, free of charge. Scroll down for the full NHTSA bulletin.
Nissan will restore Craigslist Maxima, display at headquarters [w/video]
Sat, 08 Feb 2014Nissan showed that it had a great sense of humor when it bought Luke Aker's beat-up 1996 Nissan Maxima GLE for $1,400 back in December based solely on the quality of his tongue-in-cheek sales video.
Aker's Maxima had been thoroughly driven. It needed a strap to keep its hood closed, had front end damage, a missing turn signal and shredded leather seats. Of course, like Aker said in his ad, the car was still "fully loaded with an engine, wheels, tires and an automatic transmission." How could Nissan resist?
After buying the car, Nissan teamed up with MotorAuthority to decide what to do with it. The winning idea was to restore the car to its proper condition and display it at Nissan North America headquarters in Franklin, TN, with Aker's video playing nearby. According to MotorAuthority, the car has finally made it there, and its rebirth will begin soon. Nissan is not sure when the car will go on display.
Nissan looking to expand UK plant to build Infiniti Q30
Thu, 22 Aug 2013With the Infiniti Q30 concept heading to the Frankfurt Motor Show next month and a future premium compact model heading into production at Nissan's Sunderland UK assembly plant, just connecting the dots tells us this new small Infiniti is headed for UK production. Backing this up, Reuters is reporting that Nissan is looking to expand the Sunderland plant by 25,000 square feet, while Automotive News Europe takes it a step further by almost confirming that the Q30 will be built alongside the Nissan Qashqai and Note.
The reports say that Sunderland is already the UK's biggest automotive plant, but the expansion will make it even larger with production capacity expected to rise from the current 500,000 units built each year to more than 550,000. There is no indication if the expansion will bring more jobs to the plant, which already employs around 6,000 people.