2012 Land Rover Range Rover Hse on 2040-cars
Willowbrook, Illinois, United States
Vehicle Title:Clear
For Sale By:Dealer
Engine:5.0L 5000CC V8 GAS DOHC Naturally Aspirated
Body Type:Sport Utility
Fuel Type:GAS
Make: Land Rover
Model: Range Rover
Trim: HSE Sport Utility 4-Door
Disability Equipped: No
Doors: 4
Drive Type: 4WD
Cab Type: Other
Mileage: 14,627
Drivetrain: Four Wheel Drive
Sub Model: HSE
Exterior Color: Black
Number of Cylinders: 8
Interior Color: Tan
Land Rover Range Rover for Sale
- Range rover classic
- Hse pkg-vision assist-blk piano wood comfort pkg soft door close 1owner-export!(US $103,000.00)
- 2010 range rover sc supercharged 1 owner! hi demand color combo!!
- 2008 land rover range rover sport supercharged sport utility 4-door 4.2l(US $36,550.00)
- Make offer - hse model - allwheel drive - navigation - rear entertainment-xenons(US $26,990.00)
- 2010 land rover range rover supercharged autobiography one owner car(US $62,000.00)
Auto Services in Illinois
Wickstrom Chrysler Jeep Dodge ★★★★★
White Eagle Auto Body Shop ★★★★★
Walter`s Foreign Car Serv ★★★★★
Tyson Motor Corp ★★★★★
Triple X Transport Refrigeration & Trailer Repair ★★★★★
Total Car Total Care Inc ★★★★★
Auto blog
Jaguar Land Rover opens winter testing facility in Minnesota
Wed, 12 Dec 2012As it begins the rollout of the all-wheel-drive Jaguar XJ and XF models, Jaguar Land Rover has just announced that it has opened a new facility in northern Minnesota for winter testing. Located in International Falls, MN (on the US and Canadian border), the British automaker says it is one of the coldest locations in the Continental US. Jaguar's new Instinctive All Wheel Drive system was developed primarily to help sell more cars in the northern US, so it only makes sense to open a testing area in the US as well.
With temperatures that can drop to minus 55 degrees Fahrenheit, International Falls was chosen to mimic some of the worst weather a Jaguar or Land Rover will ever see. The grounds house testing chambers, various road surfaces and even a frozen lake. This new facility complements the hot-weather testing grounds in Phoenix, AZ.
The official press release is posted below.
Jaguar opens new engine plant in the UK
Thu, 30 Oct 2014The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.
Jaguar Land Rover says key models in short supply, some have six-month wait lists
Fri, 08 Aug 2014Care for a bit more proof that the Jaguar Land Rover portfolio of vehicles is the best it's ever been? Well, the Indian-owned pair of brands saw a record year in 2013, while 2014 has seen a 14-percent increase in sales. The crazy thing is, though, is that figure could be even higher, provided the company had the production capacity.
JLR is running a six-month waiting list on two of its most popular models, the Range Rover Sport (above) and Range Rover. According to Mark White, the company's chief technologist for body engineering, the blame can be placed on the paint shop at the company's Solihull factory, in the UK.
"We will probably max out the paint shop before we max out the body shop. Putting the second body shop in has given us the flexibility to ebb and flow the different models that go through there and meet the capacity demands we've got," White told Automotive News. "However, you always hit a bottleneck somewhere. And the paint shop is probably going to be the next biggest obstacle."