Find or Sell Used Cars, Trucks, and SUVs in USA

Land Rover Discovery 2 Se 4x4 No Reserve, Nice One! on 2040-cars

Year:1997 Mileage:138900
Location:

Cle Elum, Washington, United States

Cle Elum, Washington, United States
Advertising:

1997 land rover discovery se,4.0v8i 4x4 pw/pl cruise tan leather good tires cd ac works good 138,900 miles on it Has a very small exhaust leak but other than that runs and drives great!! NO RESERVE!!

Auto Services in Washington

Xtreme Car Audio & Tint ★★★★★

Automobile Parts & Supplies, Automobile Radios & Stereo Systems, Consumer Electronics
Address: 25951 104th Ave SE, Des-Moines
Phone: (253) 867-6090

West Seattle Brake Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: 4464 37th Ave SW, Keyport
Phone: (206) 935-4350

United Battery Systems Inc ★★★★★

Automobile Parts & Supplies, Battery Storage, Automobile Accessories
Address: 438 Oregon Way, Longview
Phone: (360) 577-3833

Skys Auto Repair & Detailing ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Car Wash
Address: 12620 Highway 99, Mukilteo
Phone: (425) 263-9442

Setina Manufacturing Co. ★★★★★

Automobile Parts & Supplies, Automobile Parts, Supplies & Accessories-Wholesale & Manufacturers, Used & Rebuilt Auto Parts
Address: 2926 Yelm Hwy SE, Lacey
Phone: (360) 491-6197

Salvage Yard Guru ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts, Automobile Salvage
Address: Marshall
Phone: (509) 850-5072

Auto blog

Here's today's round of auto plant closures in response to coronavirus

Fri, Mar 20 2020

More automakers have shuttered factories, as businesses everywhere work to slow the spread of the Covid-19 coronavirus — and as the pandemic slows sales and disrupts parts supply chains. On Friday, the following closures were announced: • Volvo will close its factories in Sweden and the United States from March 26 to April 14. Volvo's U.S. facility, in Charleston, South Carolina, makes the S60 sedan. Its assembly plant in Torslanda, Sweden, turns out the XC90, SC60, and V90. Other Swedish facilities make engines and component parts. A Volvo factory in Ghent, Belgium, that builds the XC40 and V60 closed earlier this week and is expected to remain offline until April 6. Volvo's four factories in China have been reopened after a shutdown earlier this year. • Jaguar Land Rover announced that it will suspend production at its assembly plants in the UK over the coming week. The shutdown is expected to last until April 20. Elsewhere, production continues at the company's factories in India and Brazil, and JLR's joint-venture plant in China reopened at the end of February. • Bentley is closing its factory in Crewe, England, for four weeks, effective today. • Bugatti has put its atelier in Molsheim, France, on hiatus. No date was given for when assembly of its supercars might resume. • Mercedes-Benz on Monday will shut down its SUV factory in Alabama and its van assembly plant in South Carolina. Both will remain closed for a minimum of two weeks. Tesla yesterday revealed that it will suspend operations at its Fremont, California, vehicle assembly plant next week, on order from local officials there. Yesterday's factory closure announcements also included the U.S. assembly plants for Toyota (until April 6), Volkswagen (through March 29), Subaru (through March 29), and Hyundai (no time period specified). They join GM, Ford, Chrysler, Honda, Nissan, and Harley-Davidson, which earlier this week announced the suspension of production at their facilities. Plants/Manufacturing Bentley Bugatti Jaguar Land Rover Mercedes-Benz Volvo coronavirus

Volvo's EX30 woes, Rivian's big deal and the return of 'Crazy Taxi' | Autoblog Podcast #839

Wed, Jul 3 2024

In this episode of the Autoblog Podcast, Editor-in-Chief Greg Migliore is joined by Associate Editor Byron Hurd for a tight episode sure to make your holiday travel that much more vehicularly simulating. They start off with some updates on their recent drives. Greg has been in the 2024 Range Rover Velar and the 2024 Mercedes-Benz EQE SUV. Meanwhile, Byron just got the long-term 2023 Subaru WRX back from the shop with a pile of STI accessories installed — including a boomy new exhaust system! After that, it's on to news. The big items this week are the latest from Rivian, Volvo's EX30 launch drama and the return of an old-school automotive video game franchise: Crazy Taxi! After that, it's time to spend your money — with a twist! Autoblog Podcast #839   Get The Podcast Apple Podcasts – Subscribe to the Autoblog Podcast in iTunes Spotify – Subscribe to the Autoblog Podcast on Spotify RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Rundown News Volvo's European EX30 launch plagued by software issues, refunds Rivian's big deal Crazy Taxi returns! What we're driving Mercedes-Benz EQE SUV Range Rover Velar Long-term 2023 Subaru WRX Spend my money! Feedback Email – Podcast@Autoblog.com Review the show on Apple Podcasts Autoblog is now live on your smart speakers and voice assistants with the audio Autoblog Daily Digest. Say “Hey Google, play the news from Autoblog” or "Alexa, open Autoblog" to get your favorite car website in audio form every day. A narrator will take you through the biggest stories or break down one of our comprehensive test drives. Related video: This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings. Podcasts Toys/Games Land Rover Mercedes-Benz Subaru Volvo SUV Hybrid Luxury Rivian

Jaguar opens new engine plant in the UK

Thu, 30 Oct 2014

The heads of Jaguar Land Rover are having a busy couple of weeks opening factories. Just days after inaugurating the company's first overseas plant in China, the automaker's new Engine Manufacturing Center in the UK is being inaugurated, as well. The plant near Wolverhampton, England, marks the first time in decades that JLR is building its own powerplants in-house. Further signaling the importance of this launch for the business, Queen Elizabeth II and Prince Philip were on hand and even tweeted about it.
The factory's first major project is to build JLR's latest Ingenium four-cylinders, starting with the 2.0-liter diesel version. "Our new Engine Manufacturing Centre is an important step in advancing the competitiveness and capability of the UK automotive sector. The production of in-house engines will support the expansion of the UK supply chain providing critical mass for inward investment," said Trevor Leeks, plant operations director in the automaker's announcement.
Opening the doors to the Engine Manufacturing Center has been years in the making for JLR. The plant was first announced in September 2011 and broke ground in June 2012. Building it cost the company 500 million pounds ($800 million) and created 1,400 new jobs. Of course, being a state-of-the-art factory, considerations were made to make the place as energy efficient as possible. That meant installing the UK's largest solar array with 21,000 panels to produce about 30 percent of the site's electricity needs.