2013 Jeep Wrangler Sahara 4 Door 4wd Repairable Salvage Title, on 2040-cars
Mooresboro, North Carolina, United States
Vehicle Title:Salvage
Engine:3.6L 3604CC 220Cu. In. V6 GAS DOHC Naturally Aspirated
For Sale By:Dealer
Body Type:Sport Utility
Fuel Type:GAS
Make: Jeep
Warranty: Unspecified
Model: Wrangler
Trim: Unlimited Sahara Sport Utility 4-Door
Options: CD Player
Power Options: Power Locks
Drive Type: 4WD
Mileage: 8,185
Sub Model: 4WD 4dr Saha
Number of Cylinders: 6
Exterior Color: White
Interior Color: Black
Jeep Wrangler for Sale
2004 jeep wrangler 2dr 4 wheel drive 5 speed manual 4 liter hard top(US $11,988.00)
New 2013 jeep wrangler rubicon 4wd - delivery included!(US $31,995.00)
2008 wrangler sahara 3.8l v6 automatic 4wd suv premium navigation cd tow package(US $19,500.00)
2013 wrangler unlimited 4 door moab edition 6 speed navigation 2 tops black moab(US $36,001.00)
2005 jeep wrangler sport right-hand drive 61,427 miles(US $21,900.00)
We finance!!! 2009 jeep wrangler unlimited x 4x4 soft top auto cd texas auto(US $26,998.00)
Auto Services in North Carolina
Xpertech Car Care ★★★★★
Wilmington Motor Works ★★★★★
Wedgewood Muffler Shop ★★★★★
Vander Tire And Auto ★★★★★
Valvoline Instant Oil Change ★★★★★
Transmedics Transmission Specialists ★★★★★
Auto blog
FCA and UAW deal could mean huge production shakeups
Thu, Sep 17 2015The big labor contract between Fiat Chrysler Automobiles and the United Auto Workers is likely to lead to some very serious production shakeups across the company's North American manufacturing operations. That's according to a new report from Automotive News, which details the sweeping changes at no fewer than five production facilities in Michigan, Illinois, Ohio, Mexico, and Poland. So without further ado, here's what's going where, presented in easy to digest bullet form. Ram 1500 production would move from Warren, MI to Sterling Heights, MI Warren, MI would be retooled for unibody production and would handle the Jeep Grand Wagoneer and could potentially build Grand Cherokees to ease the strain on Detroit's Jefferson North factory Chrysler 200 production would move from Sterling Heights, MI to Toluca, Mexico Dodge Dart production would move from Belvidere, IL to Toluca, Mexic Fiat 500 production, which is currently handled by Toluca, would be concentrated in Poland, where the Euro-spec Cinquecento is built Jeep Cherokee production would move from Toledo, OH to Belvidere, IL to make room for Wrangler and Wrangler Pickup production Like we said, those are some big changes. But, as FCA CEO Sergio Marchionne said in an earlier interview with Automotive News, this kind of shakeup would make a lot of sense. In that August interview the exec said that automakers moved truck production to Mexico because they were "threatened" by the UAW. "The only thing [the UAW] want is to move the truck back. Which is right. If you move the truck back here, which is [the UAW's] domain, [and move] all the cars that we get killed on somewhere else, we could actually make sense of this bloody industry and actually increase the number of people employed in this country and really share wealth because we are making money," Marchionne told AN. News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing UAW/Unions Chrysler Dodge Fiat Jeep RAM Sergio Marchionne FCA toluca warren sterling heights
Stellantis to offer electric versions of most of its European lineup by 2025
Thu, Apr 15 2021Newly merged automaker conglomerate Stellantis will offer electric versions of almost all of its European lineup by 2025, it said on Thursday, as the auto industry faces regulatory pushes in Europe and China to accelerate the shift to zero-emission cars. Formed in January by the merger of France's PSA and Italian-American group Fiat Chrysler, Stellantis is the world’s fourth largest carmaker with 14 brands including Opel, Jeep, Ram and Maserati, and like its peers faces an investor community keen for a road map to an electric lineup to rival Tesla . Speaking during Stellantis' first annual shareholders meeting, Chief Executive Carlos Tavares said that in 2021 the carmaker expects sales of electrified vehicles — that is, both plug-in hybrids and fully electric models — to more than triple to over 400,000 units in 2021. By 2025, electrified vehicles should make up 38% of European sales, a huge jump from the 14% of sales it expects in 2021. Tavares said by 2030 electric models should make up 70% of European sales and 35% of U.S. sales. He said Stellantis will use four electric platforms for passenger vehicles across its 14-brand empire — small, medium and large sizes for cars, and "frame" for high-margin SUVs and pickup trucks. Sweden's Volvo said this month its lineup would be fully electric by 2030, and Ford Motor Co said in February its lineup in Europe would be too. BMW has said at least 50% of its car sales should be fully-electric models by 2030. Sales of electric and plug-in hybrid cars in the European Union almost trebled to over 1 million vehicles last year, accounting for more than 10% of overall sales. Green Alfa Romeo Fiat Jeep Maserati Citroen Lancia Opel Peugeot Vauxhall Electric Hybrid Stellantis
Chrysler investing $20M in Toledo plant to support 9-speed auto production
Sun, 28 Apr 2013In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.