Jeep Grand Cherokee Limited 2wd Navigation Leather Chrome Wheels 1 Fl Owner Mint on 2040-cars
Tarpon Springs, Florida, United States
Body Type:Sport Utility
Engine:4.7L 285Cu. In. V8 GAS SOHC Naturally Aspirated
Vehicle Title:Clear
Fuel Type:GAS
For Sale By:Dealer
Number of Cylinders: 8
Make: Jeep
Model: Grand Cherokee
Trim: Limited Sport Utility 4-Door
Warranty: Vehicle does NOT have an existing warranty
Drive Type: RWD
Options: Leather Seats
Mileage: 87,230
Safety Features: Anti-Lock Brakes
Sub Model: 4dr Limited
Power Options: Power Windows
Exterior Color: Green
Interior Color: Gray
Jeep Grand Cherokee for Sale
- Jeep : 2004 grand cherokee overland 4.7l h.o. v8 4x4 navi 31k orig miles 1-owner
- 2wd white gray cloth interior automatic transmission alloy wheels suv finance v6(US $14,200.00)
- Inspected until 5/13 it does need a list of work done sold as is it does run
- 1996 jeep grand cherokee laredo(US $2,500.00)
- Luggage rack cd player alloy wheels cruise control all power off lease only(US $15,999.00)
- 2014 new white 4wd 8spd auto trailer tow grp heated seats rearcam sunroof!!!(US $39,942.00)
Auto Services in Florida
Your Personal Mechanic ★★★★★
Xotic Dream Cars ★★★★★
Wilke`s General Automotive ★★★★★
Whitehead`s Automotive And Radiator Repairs ★★★★★
US Auto Body Shop ★★★★★
United Imports ★★★★★
Auto blog
Chrysler's Jefferson North plant builds 5-millionth SUV [w/video]
Thu, 15 Aug 2013Chrysler's Jefferson North Assembly Plant opened in 1992 for production of the first Jeep Grand Cherokee, but in the subsequent years, the Detroit plant has gone on to produce some of the company's biggest SUVs including the Jeep Commander and Dodge Durango. Earlier this week, the plant produced its five-millionth SUV, which, fittingly, was a Grand Cherokee.
Celebrating the plant's five-millionth unit, the silver 2014 Grand Cherokee was promptly donated to the USO. In addition to this milestone SUV, Chrysler also had a near-perfect 1993-95 ZJ Grand Cherokee on hand for the photo op. Scroll down for the Chrysler press release as well as a video showing some of the speeches from the celebration.
Jeep lays out 5-year plan, including rebirth of Grand Wagoneer and new C-segment offering
Tue, 06 May 2014Fiat Chrysler CEO Sergio Machionne presented a five-year plan for the company brands this morning, with Jeep first up on a long day of presentation. Jeep's head honcho Michael Manley wasted no time in laying out what the foreseeable future will look like for what he calls the "lead global brand" of the company.
Big goals for the next half-decade will include expanding the lineup from five nameplates built in one country, to six nameplates build in six countries. That expansion of models will include both a three-row competitor, and, of course, a small vehicle to slot below Cherokee. The company is also seeking to add a whopping 1,300 dealers over the next few years, to sell all this new metal, and has an aggressive goal of doubling Jeep sales by the time 2018 rolls around.
As expected, that first salvo from the off-road brand will be the debut of the much ballyhooed Renegade small crossover in the third quarter of this year. Jeep has already designated that Renegade will get refreshed for the 2017 model year, as well.
Chrysler investing $20M in Toledo plant to support 9-speed auto production
Sun, 28 Apr 2013In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.