Find or Sell Used Cars, Trucks, and SUVs in USA

Clean 1984 Cj7 Jeep Lifted 35s Amc 360 V8 4x4 4 Speed Dana 300 Will Ship on 2040-cars

Year:1984 Mileage:20000 Color: Silver
Location:

Lakeside, California, United States

Lakeside, California, United States
Transmission:Borg Warner
Vehicle Title:Clear
Engine:V8 amc 360
Fuel Type:Gas
For Sale By:Private Seller
VIN: 1jccm87a1et128413 Year: 1984
Number of Cylinders: 8
Make: Jeep
Model: CJ
Warranty: Vehicle does NOT have an existing warranty
Trim: Cj7
Options: 4-Wheel Drive
Drive Type: Manual 4 speed
Mileage: 20,000
Exterior Color: Silver
Number of Doors: 2
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in California

Z Best Body & Paint ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Restoration-Antique & Classic
Address: 18560 Pasadena St, Murrieta
Phone: (951) 471-5530

Woodman & Oxnard 76 ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: 6003 Woodman Ave, Canoga-Park
Phone: (818) 908-0877

Windshield Repair Pro ★★★★★

Auto Repair & Service, Windshield Repair
Address: Lathrop
Phone: (209) 505-5999

Wholesale Tube Bending ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Mufflers & Exhaust Systems
Address: 13510 Pomerado Rd, Cardiff
Phone: (858) 748-4300

Whitney Auto Service ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Oil & Lube
Address: 14550 Delano St, Chatsworth
Phone: (818) 785-8678

Wheel Enhancement ★★★★★

Automobile Parts & Supplies, Wheels, Automobile Accessories
Address: 5901 Blackwelder St, South-Gate
Phone: (310) 836-8908

Auto blog

Final Toledo Jeep decision may have nothing to do with city's efforts

Mon, Apr 13 2015

Toledo, OH is doing all that it can to keep production of the Jeep Wrangler in its boundaries, but the biggest issue facing the plant may be insurmountable, no matter how desperately the city wants to keep the Wrangler local. The Wrangler is built in a rather interesting manner at the Toledo Supplier Park: Fiat Chrysler only handles the very final assembly of each vehicle, while two other companies, Kuka, a German firm, and Hyundai-Mobis, a member of the sprawling Hyundai empire, produce the body and chassis, respectively. The vehicles are then transferred over to the FCA part of the park, where they're painted and completed. This was, as The Detroit News explains, a convenient arrangement back in 2006 when the supplier park opened. Chrysler, which was still owned by Daimler at the time, arranged for Kuka and Mobis to handle production, saving it a huge sum of money. Both suppliers own their own machinery and buildings and employ their own workers. Now that FCA is a relatively healthy entity, though, there's not a lot of need to be sharing profits with two other companies. "What [FCA boss Sergio Marchionne] would like is to have the advantages of high-capacity utilization, owning that capacity and taking advantage of that for himself versus having a supplier doing some of the things his competitors do internally," David Cole, chairman emeritus at the Ann Arbor, MI-based Center for Automotive Research, told The News. "It really adds another level of complexity to the situation." While Sergio Marchionne is a man that generally gets what he wants, it seems unlikely that either Mobis or Kuka would give up their role quietly. According to Jon Zapf, Mobis North America's chairperson for UAW Local 12, the company "definitely wants to maintain their part of this production process." According to The News, Jeep is likely to announce the location of next-generation Wrangler production in June. Expect to hear much more on this one in the coming months.

Jeep Cherokee finally dealer-bound

Tue, 22 Oct 2013

We had our First Drive of the 2014 Jeep Cherokee last month, but it appears that prospective buyers won't have too much longer to finally get time behind the wheel of the new small Jeep.
Automotive News is reporting that after a two-month delay, Jeep dealers will finally start receiving their first shipments of the new Cherokee, in the next 10 days. A Chrysler spokesperson confirmed to Autoblog that the Cherokee is indeed on its way to Jeep dealers.
According to AN, about 23,000 Cherokees have been built since production commenced back in June, but potential powertrain issues forced Jeep to make adjustments to the Cherokee along the way. Automotive News says that in order to make sure there are no issues with the Cherokee before it reaches customers, it is testing each vehicle after it rolls off the assembly line at a rented test track near the vehicle's Toledo North Assembly Plant.

Stellantis will build four electric vehicles in Italy, say union reps

Wed, Jun 16 2021

MILAN — Stellantis will produce four medium-segment electric vehicles, of different brands, at its Melfi plant in southern Italy from 2024, the UILM union said on Tuesday. Since Stellantis was formed at the beginning of this year through the merger of Fiat Chrysler and France's PSA, production in Italy has been under scrutiny for costing more than elsewhere in Europe. "Stellantis announced that Melfi would be the first plant in Italy to get new models, based on post-2022 business plan," UILM said in a statement after workers' representatives met with the carmaker at Italy's industry ministry in Rome. Future production at Melfi will be based on a single enhanced production line that will merge the two existing ones, the union said, adding the restructuring will leave production capacity at the site unchanged at around 400,000 units. UILM's head, Rocco Palombella, said unions had not received all the answers they wanted as Stellantis was still working on its new business plan. "But the positive element is that the company has not absolutely called for structural redundancies," he said after the meeting. Stellantis Chief Executive Carlos Tavares has said the group would present its business plan late this year or in early 2022. Stellantis, the world's fourth-largest carmaker, gave no details about what was discussed at the meeting. In an earlier statement the company said it was working "with determination and speed" to support the energy transition of all its Italian sites. Italy's Industry minister, Giancarlo Giorgetti, however, said in a separate statement after the meeting that Stellantis had yet to decide where it would build its third electric battery plant in Europe. Stellantis, which already has two battery factory projects in France and Germany, has said adding gigafactories in Europe and the United States would be decided this year. The company is holding talks on this with Rome, as Italy is one of its main production hubs in Europe. Related video: Green Plants/Manufacturing Alfa Romeo Fiat Jeep Citroen Opel Peugeot Stellantis