1983 All Original Jeep Cj 7 Laredo on 2040-cars
Ventura, California, United States
Vehicle Title:Clear
Engine:4.2L 258 6 Cylinder
Fuel Type:Gasoline
For Sale By:Dealer
Interior Color: Black
Make: Jeep
Number of Cylinders: 6
Model: CJ
Trim: LAREDO
Drive Type: 4 x 4
Mileage: 46,500
Number of Doors: 2
Sub Model: Laredo
Warranty: Vehicle does NOT have an existing warranty
Exterior Color: Black
Jeep CJ for Sale
- Restored cj-7, auto, a/s, p/s, disc brakes, v-8, beautiful paint(US $13,950.00)
- 1984 jeep cj7 base sport utility 2-door 4.2l
- 1985 cj-7 jeep renegade(US $10,900.00)
- 1986 jeep cj7 renegade sport utility 2-door 4.2l(US $15,000.00)
- Jeep cj7 fiber glass tub
- 1984 jeep cj7 !! no reserve !! very clean !! hard top and doors
Auto Services in California
Yes Auto Glass ★★★★★
Yarbrough Brothers Towing ★★★★★
Xtreme Liners Spray-on Bedliners ★★★★★
Wolf`s Foreign Car Service Inc ★★★★★
White Oaks Auto Repair ★★★★★
Warner Transmissions ★★★★★
Auto blog
Chrysler adding 200 jobs at Ohio Jeep Wrangler plant
Fri, 15 Mar 2013Chrysler is betting that the Jeep Wrangler will continue its strong sales surge as it continues to push the legendary brand out across the globe. The Auburn Hills automaker is reportedly adding 200 workers at the Toledo, Ohio plant that builds the Wrangler. What's more, those new hires will be at their posts quickly - they'll be on the job by April 1. Of those 200 workers, 130 employees will be there to relieve those who need breaks.
Why do they need so many relief workers? The Toledo Jeep Complex is currently working at a torrid pace with two ten-hour shifts. A third shift has been ruled out for the moment because of a production botttleneck - the plant's paint shop is already maxed out. According to Reuters, Wrangler production in 2012 cleared 200,000 units, and US sales were up by 16 percent.
Another part of the Toledo plant is presently down as Chrysler retools the line to build Jeep's divisively styled Liberty replacement, the Cherokee (seen in our gallery below). Production for the new model is scheduled to begin toward the end of May.
Jeep Cherokee faces on-sale delay
Sat, 23 Mar 2013A report in The Wall Street Journal looks at some of the obstacles to the 2014 Jeep Cherokee that go beyond its mootable yet "very contemporary" looks, almost all of them based on Fiat's financial position. Starting with that sheetmetal, in defense of it SRT president Ralph Gilles and Jeep design head Mark Allen said they wanted to "make sure the design still looks modern five years from now."
The WSJ piece doesn't cite longevity as a factor, instead saying that its features originated in a design for an Alfa Romeo, the transformation into a Jeep design meant allowing Chrysler get it to market more quickly and save "hundreds of millions of dollars" in engineering.
The need for Fiat to save money while it weathers the European situation has cut budgets for development, engineering and the pace of retooling the Toledo, Ohio plant to build the Cherokee. In a familiar case of snowballing at work, among the effects will be pushing back the Cherokee's volume sales date and delaying updates to some of Chrysler's other products.
Stellantis will enter joint venture with Samsung SDI for EV batteries
Tue, Oct 19 2021SEOUL — South Korean battery maker Samsung SDI Co Ltd and global automaker Stellantis NV have agreed to jointly produce electric vehicle (EV) batteries for the North American market, a person familiar with the matter said on Tuesday. Samsung SDI, an affiliate of South Korean tech giant Samsung Electronics, already has EV battery plants in South Korea, China and Hungary, which supply customers such as BMW and Ford. "The two companies (Samsung SDI and Stellantis) have struck a MOU (memorandum of understanding) to produce EV batteries for North America," the person with knowledge of the matter told Reuters. The source spoke of condition of anonymity because of the sensitivity of the matter. The person said the location of the battery joint venture is under review and will be announced later. In July, Reuters reported that Samsung SDI may build a battery plant in the United States, citing a company source. South Korea's Yonhap news agency earlier reported the two companies plan to build a factory in the United States, citing industry sources. Samsung SDI and Stellantis did not have immediate comment when reached by Reuters. Stellantis on Monday struck a preliminary deal with battery maker South Korea's LG Energy Solution (LGES) to produce battery cells and modules for North America. Shares of Samsung SDI were up 2.6% as of 0300 GMT, versus a 0.6% rise in the KOSPI benchmark index. Related video: Green Alfa Romeo Chrysler Dodge Ferrari Fiat Jeep Maserati RAM Citroen Lancia Opel Peugeot Vauxhall