2022 Jeep Grand Cherokee Overland 4xe on 2040-cars
Engine:2.0L I4 DOHC
For Sale By:Dealer
Transmission:Automatic
Vehicle Title:Clean
VIN (Vehicle Identification Number): 1C4RJYD68N8764608
Mileage: 5
Drive Type: 4WD
Exterior Color: White
Interior Color: Black
Make: Jeep
Manufacturer Exterior Color: Bright White Clear Coat
Manufacturer Interior Color: Global Black
Model: Grand Cherokee
Number of Cylinders: 4
Number of Doors: 4 Doors
Sub Model: 4x4 Overland 4xe 4dr SUV
Trim: Overland 4xe
Jeep Grand Cherokee for Sale
- 2022 jeep grand cherokee trailhawk 4xe(US $56,798.00)
- 2022 jeep grand cherokee base 4xe(US $48,655.00)
- 2019 jeep grand cherokee limited 4x2(US $24,980.00)
- 2022 jeep grand cherokee trailhawk 4xe(US $56,230.00)
- 2004 jeep grand cherokee laredo sport utility 4d(US $4,995.00)
- 2022 jeep grand cherokee base 4xe(US $53,358.00)
Auto blog
FCA plants skipping summer shutdown to keep up with demand
Thu, May 14 2015Hopefully, some FCA US factory employees don't have big plans for the usual summer shutdown, because the automaker is keeping several plants running this year. Demand is so high that the company wants to keep models rolling off the assembly lines. Four FCA US assembly plants, all the engine factories, and some locations that build transmissions are staying open throughout the summer, according to the Detroit Free Press. Usually, these sites would see a two-week shutdown for the company to retool and perform repairs. This year, factories are staying open for FCA to support its strong sales. The lines that remaining humming through the summer show an inclination toward the automaker's popular SUV's and crossovers. They include the Jefferson North Assembly Plant in Michigan that builds the Jeep Grand Cherokee and Dodge Durango; Saltillo Van Assembly in Mexico that constructs the Ram ProMaster; Toledo Assembly Complex in Ohio that produces the Cherokee and Wrangler; and Toluca Assembly in Mexico that makes the Dodge Journey and Fiat 500. Related Video: News Source: The Detroit Free PressImage Credit: Bill Pugliano / Getty Images Plants/Manufacturing Dodge Fiat Jeep RAM FCA dodge journey fca us ram promaster Jefferson North Assembly Plant
Stellantis and LG launch joint venture for North American battery plant
Mon, Oct 18 2021Stellantis has struck a preliminary deal with battery maker LG Energy Solution (LGES) to produce battery cells and modules for North America, as the world's No. 4 automaker rolls out its 30 billion euro ($35 billion) electrification plan. Global automakers are investing billions of euros to accelerate a transition to low-emission mobility and prepare for a progressive phase-out of internal combustion engines. Stellantis and LGES's joint venture will produce battery cells and modules at a new facility with an annual capacity of 40 gigawatt hours (GWh), the two firms said on Monday. No financial details of the deal were provided. The plant is scheduled to start production by the first quarter of 2024, with groundbreaking expected in the second quarter of 2022, the companies said in their statement. Its location is under review and will be announced later. Stellantis, formed in January from the merger of Italian-American automaker Fiat Chrysler and France's PSA, has said it wants to secure more than 130 GWh of global battery capacity by 2025 and more than 260 GWh by 2030. The batteries produced under the deal will supply Stellantis' U.S., Canadian and Mexican assembly plants for installation in hybrid and fully electric vehicles, supporting its goal of e-vehicles making up more than 40% of its U.S. sales by 2030. The company, whose brands include Peugeot, Fiat, Opel and U.S. best-sellers Jeep and Ram, earlier this year announced it would invest more than 30 billion euros through 2025 on electrifying its vehicle lineup. Stellantis has said it would build three battery plants in Europe and two in North America, including at least one in the United States. Intesa Sanpaolo analyst Monica Bosio said the deal was positive, and a further step ahead in Stellantis' electrification process. It comes weeks after Stellantis and its partner TotalEnergies agreed to open up their battery cell joint venture ACC to Daimler, to expand their European sourcing of battery cells. Stellantis is also targeting more than 70% of sales in Europe to be of low-emission vehicles by 2030, and aims to make the total cost of owning an EV equal to that of a gasoline-powered model by 2026. Related video: Green Plants/Manufacturing Alfa Romeo Chrysler Dodge Ferrari Fiat Jeep Maserati RAM Citroen Lancia Opel Peugeot Vauxhall Electric Hybrid EV batteries LG
Millionth Jeep Wrangler JK to roll off line this morning
Fri, 17 May 2013According to a report on the Chrysler Communications Facebook page and one fairly grainy image of the production line, at around 11:00AM Eastern this morning, the one-millionth Jeep Wrangler JK will roll out of the company's Toledo assembly plant.
The third-generation or "JK" Jeep Wrangler has been around since the 2007 model year, and has obviously been more popular than ever. With a greater than ever number of trim levels, two-door and four-door Unlimited models and hardy off-roading Rubicon packages, the JK offers more to choose from than ever for those looking for something in a traditional Jeep. In fact, with the modern 3.6-liter Pentastar V6 powering it, the 2012 model year saw more than 140k Wrangers sold here in the US; the best-ever figure for the model.
With a model refresh due out for the Wrangler in 2015 (along with the likely addition of a diesel engine option), we expect that sales will continue to roll right along, too.