2021 Jeep Grand Cherokee High Altitude 4x4 on 2040-cars
Tomball, Texas, United States
Engine:6 Cylinder Engine
Fuel Type:Gasoline
Body Type:--
Transmission:Automatic
For Sale By:Dealer
VIN (Vehicle Identification Number): 1C4RJFCGXMC728865
Mileage: 25107
Make: Jeep
Trim: High Altitude 4X4
Drive Type: 4WD
Features: --
Power Options: --
Exterior Color: Black
Interior Color: Black
Warranty: Unspecified
Model: Grand Cherokee
Jeep Grand Cherokee for Sale
- 2012 jeep grand cherokee overland 4wd 4x4 hemi v8(US $11,995.00)
- 1996 jeep grand cherokee limited(US $8,900.00)
- 2024 jeep grand cherokee summit(US $63,999.00)
- 2014 jeep grand cherokee summit(US $15,999.00)
- 2004 jeep grand cherokee(US $2,500.00)
- 2014 jeep grand cherokee laredo(US $9,500.00)
Auto Services in Texas
Woodway Car Center ★★★★★
Woods Paint & Body ★★★★★
Wilson Paint & Body Shop ★★★★★
WHITAKERS Auto Body & Paint ★★★★★
Westerly Tire & Automotive Inc ★★★★★
VIP Engine Installation ★★★★★
Auto blog
Ram, Jeep redesigns on hold, Alfa Romeo models may come sooner
Wed, Jun 3 2015Last summer, FCA outlined an ambitious five-year plan that sketched out the company's product intentions for each of its brands through the end of 2018. However, even the best strategies sometimes need tweaking. According to Reuters after speaking with unnamed people at auto suppliers, FCA is now possibly delaying at least a dozen projects in North America for a variety of reasons. From vehicle to vehicle, these postponements allegedly last anywhere from just a few months to over a year. The sources from the suppliers claim that in some cases these tweaks are for engineering and design changes. The next-gen Ram 1500 reportedly has among the shorter delays and is being pushed from mid-2017 to November 2017, according to Reuters. Also, the much-discussed future Jeep Wrangler is allegedly moving a little later to July 2017. Among the vehicles purportedly seeing longer delays, the next-gen Grand Cherokee could get pushed back about a year to 2018. That then forces the launch of the three-row, luxury Grand Wagoneer to be even further away. Jeep's upcoming C-segment CUV and the all-new Chrysler 300, Dodge Charger, and Challenger might also see postponements. The one brand allegedly seeing an accelerated plan is Alfa Romeo. Without going into detail, the sources from these suppliers claim that the Italian automaker is getting even more vehicles for its lineup and could get them even faster than planned. "Those plans need to be flexible and fluid, with the potential to add some vehicles, pull some forward and extend the life cycle of others," FCA said to Reuters about all of these allegations. "We look at these programs on a vehicle-by-vehicle basis." Investment in the auto industry has been a major topic for FCA CEO Sergio Marchionne as of late. He believes consolidation is necessary so that companies aren't burning money on the same projects. Related Video: News Source: ReutersImage Credit: Bill Pugliano / Getty Images Plants/Manufacturing Alfa Romeo Chrysler Dodge Fiat Jeep RAM Sergio Marchionne FCA fca us
FCA goes all-in on Jeep and Ram brands on cheap gas bet
Wed, Jan 27 2016It's no surprise that as SUV and truck sales remain strong in the wake of unusually cheap gas, Jeep and Ram sales are taking off. What is a surprise is that FCA CEO Sergio Marchionne thinks that cheap gas will be a "permanent condition," and feels strongly enough about it to change up North American manufacturing plans. Jeep appears to be the biggest beneficiary of the product realignment. In addition to increasing the sales estimates for the brand worldwide upwards to 2 million units a year by 2018, the brand will get a flood of investment for new product and powertrains. Consider the Wrangler Pickup to be part of the salvo, as well as the Grand Wagoneer three-row announced in 2014 as part of the original five-year plan. The Wrangler four-door will get at least two new powertrains, a diesel and mild hybrid version, in its next generation. That mild hybrid powertrain may utilize a 48-volt electrical system like the one that's being developed by Delphi and Bosch – which the suppliers think will be worth a 10 to 15 percent fuel economy gain at a minimum. Down the road, in the 2020s, the Wrangler could adopt a full hybrid system. The diesel powertrain is planned for 2019 or 2020. The Ram 1500 is also pegged to receive a mild hybrid system, again potentially based on 48-volt architecture, sometime after 2020. Lastly, Jeep and Ram will take over some of the production capacity of existing plants. The Sterling Heights, MI, plant that builds the Chrysler 200 will now build the Ram 1500; the Belvidere, IL, facility that produces the Dodge Dart will take over Cherokee output; the big Jeep facility in Toledo, OH, will be used for increased Wrangler demand. In 2015, according to FCA's numbers, car and van demand went down by 10 percent, but SUV demand went up 8 percent and truck demand 2 percent. Considering that these are high-margin vehicles, FCA can't ignore the math. FCA also won't build any new factories to supplement production to meet demand, but instead are reshuffling production priorities. Think of it this way: FCA is gambling on cheap gas being a permanent part of our lives, at least into the 2020s. By doubling down on SUVs and trucks, the company stands to win big, unless a spike in gas prices changes the landscape. FCA isn't talking about a Plan B, so they're all in. It'll be interesting to see how this plays out.
Jeep idles second shift it hired a month ago for 2014 Cherokee
Tue, 24 Sep 2013In an unusual move, Chrysler is idling its recently hired second shift of 2014 Jeep Cherokee builders because, Chrysler spokeswoman Jodi Tinson said in a statement, it already has built the "critical number of vehicles we need to stock dealerships once containment is released," Automotive News reports.
After the "critical" 9,430 Cherokees were built, the layoff was enacted so as not to strain the automaker's logistics partners before the Cherokee is actually released. Chrysler says the temporary layoff will last about two weeks, with 500 workers out of work and another 600 reassigned at the Toledo Assembly Complex where the sports utility vehicle was being built. The second-shift workers were hired on August 19.
Chrysler previously insisted that it would release the Cherokee to dealerships by the end of the third quarter, and it initially planned to start selling the SUVs in mid-August. Apparently the Cherokee needed a software fix before hitting showrooms, which is how Chrysler explains why the release schedule is out of whack. We're thinking that this software fix addresses the "powertrain calibration" issue that delayed the first media test drives of the model. According to the Toledo Blade, Chrysler has admitted it is doing "extended quality validation testing" but refused to provide more information.