Find or Sell Used Cars, Trucks, and SUVs in USA

2000 Jeep Grand Cherokee Limited Sport Utility 4-door 4.7l on 2040-cars

US $3,850.00
Year:2000 Mileage:166500
Location:

Mount Holly, North Carolina, United States

Mount Holly, North Carolina, United States

2000 JEEP GRAND CHEROKEE LIMITED 4WD,4.7 V-8,AUTOMATIC TRANS,TOW PACKAGE,RUNS AND DRIVES GOOD,"NO ISSUES WITH CHECK ENGINE LIGHT",NEW SHOCKS,COLD AC,HEATED FRONT SEATS,LEATHER INTERIOR,PWR WINDOWS,DOOR LOCKS AND SEATS,LUGGAGE RACK.PAINT STILL HAS NICE SHINE WITH A FEW NICKS BUT NOTHING MAJOR,INTERIOR IS IN GOOD SHAPE INCLUDING SEATS,4WD WORKS GOOD.HAS ALWAYS BEEN  WELL MAINTAINED,PASSED STATE INSPECTION WITH NO PROBLEM,ANY QUESTIONS FEEL FREE TO ASK.THANKS..

Jeep Grand Cherokee for Sale

Auto Services in North Carolina

Z-Mech Auto ★★★★★

Auto Repair & Service, Auto Transmission, Auto Oil & Lube
Address: 5413-112 Oak Forest Dr, Wake-Forest
Phone: (919) 790-9999

Xtreme Detail ★★★★★

Auto Repair & Service, Automobile Detailing
Address: Fair-Bluff
Phone: (910) 791-4900

Wheels N Bumpers Car Wash ★★★★★

Auto Repair & Service, Car Wash, Automobile Detailing
Address: 3420 S Church St, Swepsonville
Phone: (336) 585-0299

Weavers Body Shop & Front End ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Wheels-Aligning & Balancing
Address: 514 W 9th St, East-Spencer
Phone: (704) 425-4329

United Muffler Shop ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Mufflers & Exhaust Systems
Address: 267 Highway 105 Ext, Valle-Crucis
Phone: (828) 262-1025

Trotter Auto Glass Plus ★★★★★

Auto Repair & Service, Glass-Auto, Plate, Window, Etc, Plate & Window Glass Repair & Replacement
Address: PO Box 473682, Mount-Holly
Phone: (704) 341-8887

Auto blog

Car Club USA: Moab Jeep Jamboree

Thu, Jan 22 2015

Today Autoblog is excited to premiere its latest original video series, Car Club USA. Car Club USA's debut episode features the Just Jeeps club of Omaha, including a father-son duo traveling to Moab, UT to brave the treacherous trails. Brian is behind the wheel, as his father guides him through the most dangerous geographical features Moab's red desert has to offer. Joining them are Gene and Jean, an older married couple from Minnesota whose modified Jeep Wrangler – like its owners – knows no bounds. "We're in our seventies now," explained Jean. "We could be sitting at home in a rocking chair watching TV, but we'd rather do this." Also hitting the trails is Matt, a Californian who looks to pay homage to his father by exploring southern Utah in a World War II-era Jeep Willys. "This was our stomping ground," said Matt. "That's why I chose to come to Utah for my big vacation this year, in his memory, to see some of the places we used to go together, and have fun and do some Jeeping." Each Car Club USA episode features a different car club or event from across the US, where passionate owner communities gather to share automotive experiences and embark on incredible adventures. From Main Street cruises to off-road trails, catch all the latest car club activity on Autoblog. Jeep SUV Off-Road Vehicles Car Club USA Videos

Stellantis will build four electric vehicles in Italy, say union reps

Wed, Jun 16 2021

MILAN — Stellantis will produce four medium-segment electric vehicles, of different brands, at its Melfi plant in southern Italy from 2024, the UILM union said on Tuesday. Since Stellantis was formed at the beginning of this year through the merger of Fiat Chrysler and France's PSA, production in Italy has been under scrutiny for costing more than elsewhere in Europe. "Stellantis announced that Melfi would be the first plant in Italy to get new models, based on post-2022 business plan," UILM said in a statement after workers' representatives met with the carmaker at Italy's industry ministry in Rome. Future production at Melfi will be based on a single enhanced production line that will merge the two existing ones, the union said, adding the restructuring will leave production capacity at the site unchanged at around 400,000 units. UILM's head, Rocco Palombella, said unions had not received all the answers they wanted as Stellantis was still working on its new business plan. "But the positive element is that the company has not absolutely called for structural redundancies," he said after the meeting. Stellantis Chief Executive Carlos Tavares has said the group would present its business plan late this year or in early 2022. Stellantis, the world's fourth-largest carmaker, gave no details about what was discussed at the meeting. In an earlier statement the company said it was working "with determination and speed" to support the energy transition of all its Italian sites. Italy's Industry minister, Giancarlo Giorgetti, however, said in a separate statement after the meeting that Stellantis had yet to decide where it would build its third electric battery plant in Europe. Stellantis, which already has two battery factory projects in France and Germany, has said adding gigafactories in Europe and the United States would be decided this year. The company is holding talks on this with Rome, as Italy is one of its main production hubs in Europe. Related video: Green Plants/Manufacturing Alfa Romeo Fiat Jeep Citroen Opel Peugeot Stellantis

Chrysler investing $20M in Toledo plant to support 9-speed auto production

Sun, 28 Apr 2013

In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.