1981 Jeep Scrambler Cj8 ** Automatic ** Immaculate Condition!!! on 2040-cars
Orlando, Florida, United States
Body Type:Convertible
Engine:V8
Vehicle Title:Rebuilt, Rebuildable & Reconstructed
Fuel Type:Gasoline
For Sale By:Dealer
Number of Cylinders: 8
Make: Jeep
Model: CJ
Trim: 4WD
Warranty: Vehicle does NOT have an existing warranty
Drive Type: 4WD
Options: 4-Wheel Drive, Convertible
Mileage: 25,522
Sub Model: CJ8
Exterior Color: Red
Disability Equipped: No
Interior Color: Black
Number of Doors: 2
Jeep CJ for Sale
- 1981 jeep cj5 renegade all original 49k original miles 3 day auction no reserve!
- 74 cj5 jeep(US $3,800.00)
- 1967 jeep kaiser cj5 frame off restoration, jeep, willys, amc, cj7, collectable(US $15,500.00)
- 1982 jeep cj7(US $8,888.00)
- 1980 jeep cj5 built for rockcrawling arb's front and rear!
- 1977 jeep cj7(US $17,900.00)
Auto Services in Florida
Zip Automotive ★★★★★
X-Lent Auto Body, Inc. ★★★★★
Wilde Jaguar of Sarasota ★★★★★
Wheeler Power Products ★★★★★
Westland Motors R C P Inc ★★★★★
West Coast Collision Center ★★★★★
Auto blog
Watch this 650-hp Hennessey Jeep Grand Cherokee go from 0-60 in 3.9 seconds
Tue, 14 May 2013Hennessey Performance Engineering has created an HPE650 package for the Jeep Grand Cherokee SRT fitted with the 6.4-liter Hemi engine. When it leaves the showroom floor it has 470 horsepower and gets from 0-60 miles per hour in 4.8 seconds. When it leaves Hennessey's garage floor after the upgrade it has 650 horsepower - 530 hp at the wheels, according to Hennessey - and gets to 60 mph in 3.9 seconds on its way to running the quarter-mile in 12.6 seconds.
There's more than just a Roots-type supercharger bolt-on, with ported cylinder heads and high-flow headers among the many changes made to the engine. You can watch this pre-2014 facelift silver model prove its spec sheet on the drag strip in the video below.
Stellantis will build four electric vehicles in Italy, say union reps
Wed, Jun 16 2021MILAN — Stellantis will produce four medium-segment electric vehicles, of different brands, at its Melfi plant in southern Italy from 2024, the UILM union said on Tuesday. Since Stellantis was formed at the beginning of this year through the merger of Fiat Chrysler and France's PSA, production in Italy has been under scrutiny for costing more than elsewhere in Europe. "Stellantis announced that Melfi would be the first plant in Italy to get new models, based on post-2022 business plan," UILM said in a statement after workers' representatives met with the carmaker at Italy's industry ministry in Rome. Future production at Melfi will be based on a single enhanced production line that will merge the two existing ones, the union said, adding the restructuring will leave production capacity at the site unchanged at around 400,000 units. UILM's head, Rocco Palombella, said unions had not received all the answers they wanted as Stellantis was still working on its new business plan. "But the positive element is that the company has not absolutely called for structural redundancies," he said after the meeting. Stellantis Chief Executive Carlos Tavares has said the group would present its business plan late this year or in early 2022. Stellantis, the world's fourth-largest carmaker, gave no details about what was discussed at the meeting. In an earlier statement the company said it was working "with determination and speed" to support the energy transition of all its Italian sites. Italy's Industry minister, Giancarlo Giorgetti, however, said in a separate statement after the meeting that Stellantis had yet to decide where it would build its third electric battery plant in Europe. Stellantis, which already has two battery factory projects in France and Germany, has said adding gigafactories in Europe and the United States would be decided this year. The company is holding talks on this with Rome, as Italy is one of its main production hubs in Europe. Related video: Green Plants/Manufacturing Alfa Romeo Fiat Jeep Citroen Opel Peugeot Stellantis
Chrysler adding 200 jobs at Ohio Jeep Wrangler plant
Fri, 15 Mar 2013Chrysler is betting that the Jeep Wrangler will continue its strong sales surge as it continues to push the legendary brand out across the globe. The Auburn Hills automaker is reportedly adding 200 workers at the Toledo, Ohio plant that builds the Wrangler. What's more, those new hires will be at their posts quickly - they'll be on the job by April 1. Of those 200 workers, 130 employees will be there to relieve those who need breaks.
Why do they need so many relief workers? The Toledo Jeep Complex is currently working at a torrid pace with two ten-hour shifts. A third shift has been ruled out for the moment because of a production botttleneck - the plant's paint shop is already maxed out. According to Reuters, Wrangler production in 2012 cleared 200,000 units, and US sales were up by 16 percent.
Another part of the Toledo plant is presently down as Chrysler retools the line to build Jeep's divisively styled Liberty replacement, the Cherokee (seen in our gallery below). Production for the new model is scheduled to begin toward the end of May.