Find or Sell Used Cars, Trucks, and SUVs in USA

1987 Jaguar Xjs He on 2040-cars

US $4,000.00
Year:1987 Mileage:55382 Color: Red
Location:

Harrisville, Rhode Island, United States

Harrisville, Rhode Island, United States
Body Type:Coupe
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Private Seller
Vehicle Title:Clean
Engine:5.3L Gas V12
Year: 1987
VIN (Vehicle Identification Number): SAJNV3847HC138209
Mileage: 55382
Trim: HE
Number of Seats: 2
Number of Cylinders: 12
Make: Jaguar
Drive Type: RWD
Model: XJS
Exterior Color: Red
Number of Doors: 2
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto Services in Rhode Island

Louie Mobile Repair ★★★★★

Auto Repair & Service, Auto Transmission, Welding Equipment Repair
Address: 1978 Kingstown Rd, Peace-Dale
Phone: (401) 782-0350

Euro Motor Car ★★★★★

New Car Dealers, Automobile Body Repairing & Painting, Automobile Body Shop Equipment & Supply-Wholesale & Manufacturers
Address: 938 Main St, West-Warwick
Phone: (401) 823-1790

Cottage Street Motors ★★★★★

Used Car Dealers, Wholesale Used Car Dealers
Address: 589 Cottage St, Little-Compton
Phone: (866) 595-6470

AAMCO Transmissions ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Brake Repair
Address: 85 Cypress St, Warwick
Phone: (401) 781-1700

1a Auto Sales ★★★★★

New Car Dealers, Used Car Dealers
Address: 1391 Main St, Cumberland
Phone: (508) 921-3200

Shantok Motors Ii ★★★★

Used Car Dealers
Address: 345 Gold Star Hwy, Bradford
Phone: (866) 595-6470

Auto blog

Jaguar recalls 1,500 XJ sedans over brake issues

Thu, Dec 18 2014

A problem with the hydraulic brakes on the flagship XJ sedan has prompted Jaguar to issue a recall. The issue, as publicized by the National Highway Traffic Safety Administration in the notice you can read below, revolves around the brake line junctions underneath the affected vehicles, which may leak fluid, thereby reducing the effectiveness of the braking system. The problem only affects an estimated 1,571 units from the 2014 and 2015 model years, manufactured between February 6 and July 23, 2014. Owners of those affected units are being notified to bring their vehicles in to their local Jaguar dealers to have the brake line junctions inspected and tightened. This issue appears to be unrelated to Jaguar's recent recall of several model lines, the XJ included, over a problem with the power steering system. RECALL Subject : Incorrect Torque of Brake Pipe Unions Report Receipt Date: NOV 19, 2014 NHTSA Campaign Number: 14V741000 Component(s): SERVICE BRAKES, HYDRAULIC Potential Number of Units Affected: 1,571 Manufacturer: Jaguar Land Rover North America, LLC SUMMARY: Jaguar Land Rover North America (Jaguar) is recalling certain model year 2014-2015 Jaguar XJ vehicles manufactured February 6, 2014, to July 23, 2014. In the affected vehicles, the brake line junctions under the vehicle may leak brake fluid. CONSEQUENCE: A brake fluid leak may reduce the vehicle's braking ability, requiring additional distance to stop the vehicle, thereby increasing the risk of a crash. REMEDY: Jaguar will notify owners, and dealers will inspect the brake line junctions, tightening them as necessary, free of charge. The recall is expected to begin on January 16, 2015. Owners may contact Jaguar customer service at 1-800-452-4827. Jaguar's number for this recall is J048. NOTES: Owners may also contact the National Highway Traffic Safety Administration Vehicle Safety Hotline at 1-888-327-4236 (TTY 1-800-424-9153), or go to www.safercar.gov.

Jaguar Land Rover to cut $6.8 billion in costs

Tue, Nov 10 2015

Jaguar Land Rover reduce costs by $6.8 billion and will push annual production volume to 1 million vehicles under a secret project called Leap 4.5, according to Reuters. The British automaker wants to achieve these ambitious goals by the end of the decade to compensate for the changing market in China and to counteract the price of meeting stricter emissions standards around the world. Leap 4.5 won't mean firing workers or cutting the automaker's $4.5 billion annual research budget. JLR will instead find savings by underpinning more models with modular platforms and by adjusting its supply chain. Future factories like the one in Brazil and the proposed plant in Slovakia also won't be affected by the new strategy. Globally, JLR continues to grow, and deliveries are up two percent through October 2015 to 390,965 vehicles. Business just last month was up 24 percent year-over-year to 41,553 units. However, the auto market's downturn in China has taken a bite out the automaker's success because volume dropped there 32 percent in the third quarter, Reuters reported. A global volume of 1 million vehicles will mean more than doubling 2014's 462,678 deliveries, but JLR has made significant investments to boost production recently. In addition to the future factories, it opened its first plant in China last year and an engine assembly site in the UK. The company also signed a deal with Magna Steyr in 2015 to build an upcoming model in Austria. Related Video:

Jaguar Land Rover cutting production in face of falling demand

Sat, Feb 8 2020

LONDON — Jaguar Land Rover will reduce or stop production on certain days at two of its British factories over the next few weeks as Britain's biggest carmaker pursues cost-cutting measures in response to falling demand. JLR posted a 2.3% drop in retail sales in the three months to the end of December and has targeted billions of pounds worth of savings to tackle falling diesel demand in Europe and a tough sales environment in China. The firm will halt production on selected days over a four-week period from late February at its Castle Bromwich factory in central England and stop production on some half or full days at its nearby Solihull facility until the end of March. "The external environment remains challenging for our industry and the company is taking decisive actions to achieve the necessary operational efficiencies to safeguard long-term success," the company said in a statement. "We have confirmed that Solihull and Castle Bromwich will make some minor changes to their production schedules to reflect fluctuating demand globally, whilst still meeting customer needs." The move is not connected to coronavirus, a spokeswoman said, which prompted Fiat Chrysler to warn on Thursday that a European plant could shut down within two to four weeks if Chinese parts suppliers cannot get back to work. Related Video: