Find or Sell Used Cars, Trucks, and SUVs in USA

2003 Jaguar Xj8 on 2040-cars

US $13,900.00
Year:2003 Mileage:64000 Color: Gold /
 Tan
Location:

Advertising:
Vehicle Title:Clean
Engine:4.0 V8
Fuel Type:Gasoline
Body Type:Sedan
Transmission:Automatic
For Sale By:Dealer
Year: 2003
VIN (Vehicle Identification Number): SAJDA14C33LF59509
Mileage: 64000
Make: Jaguar
Features: --
Power Options: --
Exterior Color: Gold
Interior Color: Tan
Warranty: Unspecified
Model: XJ8
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. See all condition definitions

Auto blog

Jaguar Land Rover calling in 100k vehicles in three separate campaigns

Sun, Feb 8 2015

Jaguar Land Rover is recalling an estimated 104,114 vehicles in three separate campaigns in cooperation with the National Highway Traffic Safety Administration. The largest of them affects Range Rovers made between April 15, 2005, and September 4, 2012, covering 74,648 units in America from the 2006 to 2012 model years. In those affected vehicles, the front brake hose could rupture, leaking brake fluid and decreasing the capability of the brakes to, you know... stop the vehicle. In a similar but separate recall, subsequent Range Rovers from the 2013 and 2014 model years (manufactured between August 16, 2012, and January 8, 2014) are also being recalled for a brake issue – this time due to the incorrect routing of the brake vacuum hose. The issue could wear down the hose and disable the power assist, again impeding the brakes from properly functioning. This second recall also affects the 2014 Range Rover Sport (specifically those manufactured between May 7, 2013, and January 8, 2014), affecting 24,679 units between both models across the United States. A third smaller recall concerns the 2012-2015 Jaguar XK – namely those built between March 4, 2011, and March 20, 2014. This campaign involves the front side parking lamps, which might switch off after about five minutes, in contravention of federal standards. As such, an estimated 4,787 units are being called in. In all three cases, owners of the affected vehicles can expect to hear from their local dealer to arrange to bring in their wayward British luxury vehicles to have the relevant issue fixed. RECALL Subject : Front Brake Hose(s) may Rupture Report Receipt Date: JAN 27, 2015 NHTSA Campaign Number: 15V039000 Component(s): SERVICE BRAKES, HYDRAULIC Potential Number of Units Affected: 74,648 Manufacturer: Jaguar Land Rover North America, LLC SUMMARY: Jaguar Land Rover North America, LLC (Land Rover) is recalling certain model year 2006-2012 Land Rover Range Rover vehicles manufactured April 15, 2005, to September 4, 2012. One or both of the flexible front brake hoses may rupture causing loss of brake fluid. CONSEQUENCE: If one or both of the flexible brake hoses fails, the vehicle may require a longer distance to stop, increasing the risk of a crash. REMEDY: Land Rover will notify owners, and dealers will replace the left and right front brake hoses, free of charge. The recall is expected to begin March 13, 2015. Owners may contact Land Rover customer service at 1-800-637-6837.

Jaguar Land Rover to upgrade Castle Bromwich plant to build EVs

Fri, Jul 5 2019

LONDON — Jaguar Land Rover is making a multi-million pound investment to build electric vehicles in Britain, in a major boost for the UK government and a sector hit by the slump in diesel sales and Brexit uncertainty. Britain's biggest car company, which built 30 percent of the UK's 1.5 million cars last year, will make a range of electrified vehicles at its Castle Bromwich plant in central England, beginning with its luxury saloon, the XJ. "The future of mobility is electric and, as a visionary British company, we are committed to making our next generation of zero-emission vehicles in the UK," Chief Executive Ralf Speth said on Friday. The announcement gives a boost to Britain's automotive sector hit this year by Honda and Ford's plans to close factories. Jaguar Land Rover (JLR) has highlighted the dangers of a no-deal Brexit and the need to maintain frictionless trade with the European Union, echoing warnings from the industry that just-in-time production could be hit by customs delays and additional bureaucracy. But it has signed a deal with workers at the Castle Bromwich factory to go from a five-day to a four-day working week with the same amount of hours which should allow the plant to operate more efficiently. Three of JLR's four European car plants are in Britain, giving it limited capacity elsewhere on the continent. The other, in Slovakia, only opened last year and is still being ramped up with other models allocated there. "We are making this investment because the ongoing Brexit uncertainty has left us with no choice, we had to act, for our employees and our business," JLR said. "We are committed to the UK as our home and will fight to stay here but we need the right deal." Both candidates to replace Prime Minister Theresa May, Boris Johnson and Jeremy Hunt, have both said they are prepared to take Britain out of the EU on Oct. 31 without a deal, although it is not their preferred option. Brexiteers have argued that the EUÂ’s biggest economy Germany, which exports hundreds of thousands of cars to Britain ever year, would do its utmost to protect that trade Friday's announcement comes after a turbulent few months for Jaguar which announced around 4,500 job cuts earlier in January and posted a 3.66 billion pound ($4.5 billion) loss in 2018/19.

Jaguar Land Rover says key models in short supply, some have six-month wait lists

Fri, 08 Aug 2014

Care for a bit more proof that the Jaguar Land Rover portfolio of vehicles is the best it's ever been? Well, the Indian-owned pair of brands saw a record year in 2013, while 2014 has seen a 14-percent increase in sales. The crazy thing is, though, is that figure could be even higher, provided the company had the production capacity.
JLR is running a six-month waiting list on two of its most popular models, the Range Rover Sport (above) and Range Rover. According to Mark White, the company's chief technologist for body engineering, the blame can be placed on the paint shop at the company's Solihull factory, in the UK.
"We will probably max out the paint shop before we max out the body shop. Putting the second body shop in has given us the flexibility to ebb and flow the different models that go through there and meet the capacity demands we've got," White told Automotive News. "However, you always hit a bottleneck somewhere. And the paint shop is probably going to be the next biggest obstacle."