Find or Sell Used Cars, Trucks, and SUVs in USA

1999 Gmc Safari Slt Extended Passenger Van 3-door 4.3l on 2040-cars

US $2,000.00
Year:1999 Mileage:207000
Location:

Oxford, New York, United States

Oxford, New York, United States

Auto Services in New York

Wayne`s Auto Repair ★★★★★

Auto Repair & Service
Address: 101 Central Ave, Van-Buren-Point
Phone: (716) 363-6499

Vk Auto Repair ★★★★★

Auto Repair & Service
Address: 1000 Jericho Tpke, Glenwood-Landing
Phone: (929) 224-0634

Village Auto Body Works Inc ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Wheel Alignment-Frame & Axle Servicing-Automotive
Address: 248 Winthrop Ave, Garden-City
Phone: (516) 997-5583

TOWING BROOKLYN TODAY.COM ★★★★★

Auto Repair & Service, Towing, Locks & Locksmiths
Address: 2025 Flatbush Ave, Rochdale-Village
Phone: (646) 470-4869

Total Performance Incorporated ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 18 Ramapo Valley Rd, Nanuet
Phone: (201) 529-4353

Tom & Arties Automotive Repair ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting
Address: 211 Veterans Rd W, Staten-Island
Phone: (718) 967-7817

Auto blog

General Motors could turn Hamtramck into its electric pickup, SUV hub

Fri, Nov 15 2019

Electric off-roaders could revitalize the Detroit-Hamtramck factory that General Motors previously announced it will close. While official details remain shrouded in secrecy, analysts believe the plant will be re-tooled to manufacture at least three electric models due out during the early 2020s. The plant's scheduled closure was one of the grievances the United Auto Workers (UAW) union cited when it embarked on a 40-day strike in September 2019. General Motors agreed to keep it open without shedding much light on what it planned to build there. Analyst at LMC Automotive told the The Detroit News they believe an often-rumored electric SUV that will resurrect Hummer's name, image, or both will be one of the models assigned to the Hamtramck plant. Battery-powered variants of the GMC Sierra and the Cadillac Escalade will be made there, too, as will an enigmatic van. LMC Automotive's Jeff Schuster believes the van will come first; it could enter production as early as 2021. The Hummer — which might also be offered as a pickup — will follow before the end of 2022, while the Sierra and the Escalade will both arrive in 2023. We're taking this report with a grain of salt, though, because only one of the aforementioned models has been announced by General Motors. Rumors of a Hummer resurrection emerged in the summer of 2019, just a few weeks before we heard unverified reports of a battery-powered variant of the next-generation Escalade. General Motors confirmed plans to enter the burgeoning electric pickup truck segment, which Ford, Rivian, and Tesla also have their sights on, but it hasn't detailed how or when. The van is a mystery. General Motors refused to comment on the report. It previously announced it will keep Hamtramck open, and invest $3 billion to build electric vehicles there. The investment will create 2,225 jobs. Inaugurated in February 1985, the Hamtramck factory has churned out a diverse selection of models over the past 34 years, including Cadillac's Eldorado, Seville, and Allante, the Oldsmobile Toronado, the Buick Riviera, and more recently, gasoline-electric Chevrolet Volt. General Motors announced plans to close Hamtramck in 2018, but it quickly backpedaled and extended its lease on life until 2020 by keeping the Chevrolet Impala and the Cadillac CT6 around for a few additional months.

PickupTrucks.com's latest test results in a familiar winner [w/video]

Wed, 19 Jun 2013

PickupTrucks.com has gone and thrown the latest batch of half-ton pickups into a cage match to see who would come out on top. The site put the 2014 Chevrolet Silverado 1500, GMC Sierra 1500, 2013 Ford F-150, Ram 1500, Toyota Tundra and Nissan Titan through a battery of tests. Those included 0-60 miles per hour acceleration, 60-0 mph deceleration, fuel economy, a hill climb, and payload and towing. They even threw the rigs on an autocross course to evaluate overall handling. Each truck was given points based on how it scored in each evaluation.
Who came out on top? Somewhat surprisingly, the 2013 Ford F-150 walked away with the gold, though fewer than 50 points separated first and fourth place. Head over to PickupTrucks.com to read the full evaluation and the final results. You may be shocked to see exactly where some of the segment's newest additions placed. You can also watch a video on the test below.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.