2018 Gmc Sierra 1500 Denali Crew Cab 4x4 W/roof on 2040-cars
Engine:EcoTec3 5.3L V8
Fuel Type:Gasoline
Body Type:Crew Pickup
Transmission:Automatic
For Sale By:Dealer
VIN (Vehicle Identification Number): 3GTU2PECXJG288064
Mileage: 97266
Make: GMC
Trim: Denali Crew Cab 4x4 w/Roof
Drive Type: --
Features: --
Power Options: --
Exterior Color: White
Interior Color: Cocoa/Dark Sand
Warranty: Unspecified
Model: Sierra 1500
GMC Sierra 1500 for Sale
- 2019 gmc sierra 1500 k1500 slt(US $26,000.00)
- 2005 gmc sierra 1500(US $10,100.00)
- 2024 gmc sierra 1500 at4x(US $71,132.00)
- 2023 gmc sierra 1500 4wd crew cab short box at4(US $56,873.00)
- 2023 gmc sierra 1500 4wd crew cab short box at4(US $58,763.00)
- 2018 gmc sierra 1500 slt(US $33,288.00)
Auto blog
GM phasing out light-duty 1500-series vans
Mon, 16 Jun 2014In the market for a fullsize van but don't need a heavy-duty model? You're in the minority, and you're also out of luck. That's because there are barely any more fullsize vans on the market with gross vehicle weight rating of less than 8,500 pounds, the threshold that separates light- and heavy-duty vans.
According to PickupTrucks.com, neither the Ford E-Series, Ram ProMaster, nor Mercedes-Benz Sprinter are available in light-duty versions. Few of the Ford Transit configurations are, either, and now General Motors is discontinuing production of the 1500-series Chevy Express and GMC Savana.
Apparently light-duty versions accounted for just 23 percent of Express sales and only 7 percent of Savanas. Add to that the fact that these 1500 versions were the only ones using the old generation of engines and suspension, and that the Wentzville plant near St. Louis, Missouri, is trying to make room for the next Chevy Colorado and GMC Canyon pickups, and the fate of the light-duty GM van was sealed.
GM dealers have ordered 30k Colorado and Canyon pickups, 3rd shift added
Wed, 17 Sep 2014General Motors has an early success on its hands in the form of the initial rollout of the Chevy Colorado and GMC Canyon midsize pickup trucks. According to the automaker, dealers have ordered nearly 30,000 of the trucks thus far, a number that far exceeded GM's early expectations.
This high demand for the Colorado and Canyon twins has prompted GM to add a third shift to its Wentzville Assembly plant where the trucks are built, starting early next year. An extra shift will add an additional 750 jobs at the location to the 1,315 that were already employed there, according to the press release that you're welcome to read down below.
Such positive sales projections for the Canyon and Colorado may portend good things for the midsize pickup segment, which was once hugely popular but has more recently contracted, with the Nissan Frontier and Toyota Tacoma standing firm as the market leaders. Now that GM's entries are the most up-to-date, and with the segment's first diesel engine on the way, it will be interesting to see how the trucks continue to sell and if their hopeful success leads more automakers back onto the playing field.
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.