Find or Sell Used Cars, Trucks, and SUVs in USA

1997 Ford Mustang on 2040-cars

US $7,500.00
Year:1997 Mileage:31850 Color: Blue /
 Gray
Location:

Gnadenhutten, Ohio, United States

Gnadenhutten, Ohio, United States

Feel free to email: douglassdcchatfield@uksingers.com .

This is a heavy modified Mustang with an Automatic Transmission. Very low miles...
Vin Leaks report available upon request.
Vortech Supercharger with Aftercooler (12 PSI)
PHP 42lb injectors
Pro-M77 Mass Air
Upgraded Throttle Body
MSD DIS-4 Ignition
Upgraded SparkPlug Wires
Nitto Tires (Street on the front & Drag Radials on the rear)
70/30 Struts
Custom Off-Road H-Pipe
Borla Exhaust
Trunk Mount Battery
A-Pillar Gauge Kit
Custom Programming and Dyno work by Paul's High Performance
Upgraded Transmission by PHP
3:73 Rear Gears

Auto Services in Ohio

Yonkers Auto Body ★★★★★

Automobile Body Repairing & Painting
Address: 6 W Channel St, Millersport
Phone: (740) 366-1610

Western Reserve Battery Corp ★★★★★

Automobile Parts & Supplies, Battery Storage, Automobile Accessories
Address: 7580 Northfield Rd, Russell
Phone: (440) 439-7911

Walt`s Auto Inc ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts, Automobile Salvage
Address: 3551 Springfield Xenia Rd, Cedarville
Phone: (800) 325-7564

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 4607 Belden Village St NW, Robertsville
Phone: (330) 493-8462

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 675 N Houk Rd, Richwood
Phone: (740) 363-4080

Tritex Corporation ★★★★★

Automobile Parts & Supplies, Automobile Seat Covers, Tops & Upholstery, Boat Covers, Tops & Upholstery
Address: 1390 Holly Ave, Kirkersville
Phone: (614) 294-8511

Auto blog

8 automakers, 15 utilities collaborate on open smart-charging for EVs

Thu, Jul 31 2014

We're going to lead with General Motors here. GM is one of eight automakers working with 15 utilities and the Electric Power Research Institute (EPRI) at developing a "smart" plug-in vehicle charging system. Why did we start with GM? Because it's the first automaker whose press release we read that mentioned the other seven automakers. Points for sharing. For the record, the collaboration also includes BMW, Toyota, Mercedes-Benz, Honda, Chrysler, Mitsubishi and Ford. The utilities include DTE Energy, Duke Energy, Southern California Edison and Pacific Gas & Electric. The idea is to develop a so-called "demand charging" system in which an integrated system lets the plug-ins and utilities communicate with each other so that vehicle charging is cut back at peak hours, when energy is most expensive, and ramped up when the rates drop. Such entities say there's a sense of urgency to develop such a system because the number of plug-in vehicles on US roads totals more than 225,000 today and is climbing steadily. There's a lot of technology involved, obviously, but the goal is to have an open platform that's compatible with virtually any automaker's plug-in vehicle. No timeframe was disclosed for when such a system could go live but you can find a press release from EPRI below. EPRI, Utilities, Auto Manufacturers to Create an Open Grid Integration Platform for Plug-in Electric Vehicles PALO ALTO, Calif. (July 29, 2014) – The Electric Power Research Institute, 8 automakers and 15 utilities are working to develop and demonstrate an open platform that would integrate plug-in electric vehicles (PEV) with smart grid technologies enabling utilities to support PEV charging regardless of location. The platform will allow manufacturers to offer a customer-friendly interface through which PEV drivers can more easily participate in utility PEV programs, such as rates for off-peak or nighttime charging. The portal for the system would be a utility's communications system and an electric vehicle's telematics system. As the electric grid evolves with smarter functionality, electric vehicles can serve as a distributed energy resource to support grid reliability, stability and efficiency. With more than 225,000 plug-in vehicles on U.S. roads -- and their numbers growing -- they are likely to play a significant role in electricity demand side management.

Ford idling Michigan Assembly Plant to trim Focus, C-Max supply

Tue, 22 Oct 2013

Ford will be putting the brakes on production at its Michigan Assembly Plant in Wayne, MI, idling production during the weeks of October 28 and December 16. Ford is citing the first drop in US sales in 27 months, a 4.2-percent dip in September, as the impetus for trimming their supplies, according to Automotive News.
Ford's deft management of its supplies has been part of its success over the years, and seeing supplies of Focus and C-Max, the two vehicles built at MAP, rise from 58 and 108 days, respectively, to 71 and 122 days over the span of a month was apparently all that was need to justify the trimming. As AN points out, the rule of thumb for many automakers is to maintain a 60-day supply of vehicles.
"Ford has been focused on keeping their pricing in check. Their operating margin is in double digits. Nobody else is there and they're obviously very proud of that," Alan Baum, an auto analyst with Baum & Associates told AN. Keeping the supply chain operating smoothly and not increasing supplies too much is crucial to that healthy profit margin. After all, a large supply lowers prices ,which, in turn, cuts profit. So while this news might not be great for employees at MAP, who now have an extra two weeks of vacation time, it's far from a sign of problems in Dearborn. Quite the opposite, actually.

Britain orders 10,000 ventilators from F1/McLaren/Mercedes/Ford/Rolls-Royce/Airbus

Mon, Mar 30 2020

Paramedics and ambulance personnel get instructions from a command unit outside London's ExCel Centre arena, which is being turned into a 4,000 bed temporary hospital called NHS Nightingale to deal with coronavirus patients. The hospital is due to open Monday, March 30. / AP     LONDON — Britain has ordered 10,000 ventilators from a consortium of leading aerospace, engineering and Formula One racing companies which will start production this week in response to an urgent government call for industry to help save lives. The 27-strong team, including Airbus, BAE Systems, Ford and Rolls-Royce, have joined forces to ramp up production of a ventilator made by Smiths Group, which supports those with complications from COVID-19. The consortium, which also includes seven Formula One teams including McLaren and Mercedes, home to World Champion Lewis Hamilton, said they had pulled staff off existing projects to meet the national need. Some 1,228 people have died from coronavirus in the United Kingdom and a senior health official said on Saturday the country would be doing well if it manages to keep the death toll below 20,000. "This consortium brings together some of the most innovative companies in the world," Dick Elsy, the head of the consortium, said in a statement. "I am confident this consortium has the skills and tools to make a difference and save lives." The United Kingdom, which initially only had 5,000 ventilators available in its National Health Service, has been trying to secure additional supplies after realising it needed 30,000 to cope with the peak of the outbreak. Prime Minister Boris Johnson, who is now in isolation in Downing Street after testing positive for coronavirus, made an emergency appeal earlier this month for manufacturers to retool their production lines and start making specialist health equipment including ventilators. Britain now has about 8,000 ventilators, with another 8,000 on order from international manufacturers that are due in coming weeks. Last week it placed an order for a newly-designed model from the vacuum cleaner company Dyson that will need to be approved by the health regulator. Mercedes part of a separate effort, too Separately on Monday a second consortium including Mercedes Formula One and other F1 teams said it had developed in less than a week a new version of a breathing aid that can help coronavirus patients.