No Reserve 1989 Ford F-250 Xlt Long Bed, 1 Owner, Low Miles on 2040-cars
Wilmington, North Carolina, United States
Ford F-250 for Sale
- 2011 navigation sunroof leather heated cooled v8 diesel we finance 71k miles
- 2010 ford f-250 lariat crew 4x4 fx4 sunroof htd leather texas direct auto(US $24,480.00)
- 2009 ford f-250 xlt supercab 6-pass bedliner 18's 22k texas direct auto(US $21,780.00)
- 2011 ford f-250 custom-lifted truck
- 2014 king ranch crew 4x4 fx4 navigation sunroof leather heated v8 diesel(US $56,011.00)
- 2014 king ranch crew 4x4 fx4 navigation sunroof leather heated v8 diesel(US $56,011.00)
Auto Services in North Carolina
Westside Motors ★★★★★
VIP Car Service ★★★★★
Vann York Toyota Scion ★★★★★
Skip`s Volkswagen Service ★★★★★
Sharky`s Auto Glass ★★★★★
Randy`s Automotive Repair ★★★★★
Auto blog
Autoblog Podcast #326
Tue, 26 Mar 2013Easter Jeep Safari concepts, Shelby 1000, 2014 Cadillac CTS and Mercedes CLA45 AMG leaks
Episode #326 of the Autoblog Podcast is here, and this week, Dan Roth and Zach Bowman talk about this year's Easter Jeep Safari concepts, the 1,200-horsepower Shelby 1000 and leaked images of the 2014 Cadillac CTS and Mercedes-Benz CLA45 AMG. We wrap with your questions and emails, and for those of you who hung with us live on our UStream channel, thanks for taking the time. Keep reading for our Q&A module for you to scroll through and follow along, too. Thanks for listening!
Autoblog Podcast #326:
2015 F-150 launch to curb Ford profits?
Thu, 30 Jan 2014Ford is making a big bet on aluminum with its new 2015 F-150, and it's possible that the decision will hurt the company financially, at least in the short term. After earning a record $8.6 billion in 2013, the Blue Oval does not expect to set another record in 2014. According to Automotive News, that's "largely attributable to F Series," says Bob Shanks, Ford's Chief Financial Officer.
To retool for the new F-150, Ford will idle its Dearborn Truck Plant in Michigan for 11 weeks and the Ford Kansas City Assembly Plant in Missouri for 2 weeks. "3 of the 13 overall weeks occur during what normally is our summer shutdown timeframe," said Mike Levine, Ford Trucks Communication Manager, in an email to Autoblog. The extra 10 weeks will be preparing for the more aluminum-intensive construction for the trucks and will mean over 2 months of no F-150s being made. For comparison's sake, Chrysler boss Sergio Marchionne just confirmed that the 200 plant in Sterling Heights, MI will be down for 30 days to retool for the new model, but obviously there are many more F-150 production variables than for the midsize sedan.
Levine notes that Ford is already running three shifts at both plants, and says the automaker has plans to ensure that there is adequate supply of the full-size pickups during the retooling process. The company does not want to suffer a shortage of the vehicle that accounted for 31-percent of its 2013 US sales and an even bigger percentage of its profits.
Toyota hangs on to title of world's largest automaker for first half of 2013
Fri, 26 Jul 2013General Motors and Ford can have all the success they please, but it doesn't seem like America's two largest manufacturers are going to topple Toyota in the first half of 2013. According to Reuters, Toyota moved 4.91 million vehicles in the first six months of 2013, representing a 1.1-percent drop from the same period in 2012.
GM is on the rise, though, with a four-percent increase in global sales, to 4.85 million. Volkswagen, still sitting in third, saw a 5.5-percent jump to 4.7 million vehicles in the first half of 2013.
If this pace continues for Toyota, it'll finish 2013 in the top sales spot for the second year in a row. The manufacturer fell to third, behind GM and VW, in 2011 after earthquakes and tsunamis ravaged its production capacity.