2022 Dodge Charger Srt Hellcat on 2040-cars
Boca Raton, Florida, United States
Transmission:Automatic
Fuel Type:Gasoline
For Sale By:Private Seller
Vehicle Title:Clean
Engine:6.2L Gas V8
Year: 2022
VIN (Vehicle Identification Number): 2C3CDXL98NH206517
Mileage: 3250
Trim: SRT HELLCAT
Number of Cylinders: 8
Make: Dodge
Drive Type: RWD
Fuel: gasoline
Model: Charger
Exterior Color: Black
Number of Doors: 4
Dodge Charger for Sale
- 2023 dodge charger scat pack(US $53,990.00)
- 2016 dodge charger(US $8,999.00)
- 2023 dodge charger sxt(US $20,493.90)
- 2023 dodge charger sxt(US $20,493.90)
- 2015 dodge charger srt 392 sedan 4d(US $29,995.00)
- 2008 dodge charger(US $2,535.00)
Auto Services in Florida
Zych Certified Auto Repair ★★★★★
Xtreme Automotive Repairs Inc ★★★★★
World Auto Spot Inc ★★★★★
Winter Haven Honda ★★★★★
Wing Motors Inc ★★★★★
Walton`s Auto Repair Inc ★★★★★
Auto blog
Dodge to reveal Hellcat-powered Challenger in Detroit?
Fri, 10 Jan 2014On top of all the other performance car debuts slated for next week's Detroit Auto Show, we might be able to add one more to the list - the new, supercharged Hellcat V8 from Chrysler. According to new reports, the rumored 640-horsepower mill is likely to cross the Motor City stage in the engine bay of a Dodge Challenger.
As AllPar points out, though, there may be more news than just the fire-breathing engine. While we've seen spy photos of the Hellcat testing under the hood of the current Challenger, there's a very fair chance that it won't arrive until the muscle car is refreshed later this year. The question now is whether that refresh will be shown off alongside the new engine in Detroit, or if it'll be saved, perhaps for the New York Auto Show.
Other details dug up by AllPar include potential transmissions for the supercharged engine - the Mopar-minded site is expecting an eight-speed automatic or a Tremec six-speed manual. Prices, meanwhile, could be in the same elevated range as the Chevrolet Camaro Z/28, at $70,000 to $80,000.
Autoblog Podcast #414
Wed, Jan 21 2015Episode #414 of the Autoblog Podcast is here, and this week, Dan Roth, Steven Ewing, and Seyth Miersma discuss the new 2015 Shelby GT and go over the finer points of Elon Musk's recent speech during the Detroit Auto Show. Of course, the podcast starts with what's in the garage and finishes up with some of your questions, and for those of you who hung with us live on our UStream channel, thanks for taking the time. Check out the rundown with times for topics, and you can follow along down below with our Q&A. Thanks for listening! Autoblog Podcast #414 Topics 2015 Shelby GT Elon Musk speech in Detroit In The Autoblog Garage 2015 Lexus LX 570 2015 Dodge Charger Pursuit 2015 Toyota Prius C 2015 Lincoln Navigator Hosts: Dan Roth, Steven Ewing, Seyth Miersma Runtime: 01:17:58 Rundown Intro and Garage - 00:00 2015 Shelby GT – 32:41 Elon Musk – 41:33 Q&A - 54:48 Get The Podcast UStream – Listen live on Mondays at 10 PM Eastern at UStream iTunes – Subscribe to the Autoblog Podcast in iTunes RSS – Add the Autoblog Podcast feed to your RSS aggregator MP3 – Download the MP3 directly Feedback Email – Podcast at Autoblog dot com Review the show in iTunes Podcasts Dodge Lexus Lincoln Toyota toyota prius c shelby lincoln navigator lexus lx
Chrysler investing $20M in Toledo plant to support 9-speed auto production
Sun, 28 Apr 2013In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.