2014 Dodge Dart Limited - Fully Loaded - Leather - Autostart/navi - Heated Seats on 2040-cars
Pearland, Texas, United States
Dodge Dart for Sale
- 1971 dodge demon mopar 340 v8 runs great no reserve! very good condition
- 1969 dodge dart fl car one owner ac car 29000 actual miles runs great(US $2,200.00)
- Navigation(US $15,498.00)
- 1972 dodge dart swinger hardtop 2-door 5.2l(US $8,250.00)
- 1966 dodge dart gt convertible 2-door 3.7l
- 1964 dodge dart 270 3.7l
Auto Services in Texas
Zepco ★★★★★
Xtreme Motor Cars ★★★★★
Worthingtons Divine Auto ★★★★★
Worthington Divine Auto ★★★★★
Wills Point Automotive ★★★★★
Weaver Bros. Motor Co ★★★★★
Auto blog
Stellantis and LG launch joint venture for North American battery plant
Mon, Oct 18 2021Stellantis has struck a preliminary deal with battery maker LG Energy Solution (LGES) to produce battery cells and modules for North America, as the world's No. 4 automaker rolls out its 30 billion euro ($35 billion) electrification plan. Global automakers are investing billions of euros to accelerate a transition to low-emission mobility and prepare for a progressive phase-out of internal combustion engines. Stellantis and LGES's joint venture will produce battery cells and modules at a new facility with an annual capacity of 40 gigawatt hours (GWh), the two firms said on Monday. No financial details of the deal were provided. The plant is scheduled to start production by the first quarter of 2024, with groundbreaking expected in the second quarter of 2022, the companies said in their statement. Its location is under review and will be announced later. Stellantis, formed in January from the merger of Italian-American automaker Fiat Chrysler and France's PSA, has said it wants to secure more than 130 GWh of global battery capacity by 2025 and more than 260 GWh by 2030. The batteries produced under the deal will supply Stellantis' U.S., Canadian and Mexican assembly plants for installation in hybrid and fully electric vehicles, supporting its goal of e-vehicles making up more than 40% of its U.S. sales by 2030. The company, whose brands include Peugeot, Fiat, Opel and U.S. best-sellers Jeep and Ram, earlier this year announced it would invest more than 30 billion euros through 2025 on electrifying its vehicle lineup. Stellantis has said it would build three battery plants in Europe and two in North America, including at least one in the United States. Intesa Sanpaolo analyst Monica Bosio said the deal was positive, and a further step ahead in Stellantis' electrification process. It comes weeks after Stellantis and its partner TotalEnergies agreed to open up their battery cell joint venture ACC to Daimler, to expand their European sourcing of battery cells. Stellantis is also targeting more than 70% of sales in Europe to be of low-emission vehicles by 2030, and aims to make the total cost of owning an EV equal to that of a gasoline-powered model by 2026. Related video: Green Plants/Manufacturing Alfa Romeo Chrysler Dodge Ferrari Fiat Jeep Maserati RAM Citroen Lancia Opel Peugeot Vauxhall Electric Hybrid EV batteries LG
Dodge idles Viper production again at Conner Avenue
Mon, 07 Jul 2014You've got to hand it to Dodge for having the gumption to put the original Viper into production in the first place. It was, after all, much more of an emotional decision than a practical one, and a move which saw the first production V10 engine placed in a road car - long before the advent of the Lamborghini Gallardo, Audi R8, Porsche Carrera GT or Lexus LFA, not to mention the other Ford, BMW and Volkswagen Group models that used such engines.
It's now been 22 years since the first Viper entered production and the Viper still rolls on several generations later, but we're sad to say that courageous decision has not always been met with overwhelming sales success. In fact parent Chrysler was forced to idle the Conner Avenue plant where the Viper is made back in April due to slow sales. And while production resumed again as planned on June 23, it apparently didn't do the trick.
As a result, Chrysler corporate communications chief Shawn Morgan revealed to Autoblog that the assembly line has been shut down again for another two weeks. The line was up and running for nearly two full work weeks from June 23 until the holiday weekend that started on Thursday, July 3. But instead of coming back online today as planned, it's been idled again for the weeks of July 7 and 14. That means it will be July 21, at the earliest, before the serpentine supercars start slithering down the assembly line at Conner Avenue again. Once it does, however, production is set to resume at the same pace it was before the shutdown.
Dodge and Jeep recalling 895k SUVs for possibility of headliner fires
Fri, 11 Jul 2014Dodge and Jeep are announcing recalls of a total of 895,000 Durango and Grand Cherokee models worldwide from the 2011 through 2014 model years. There's a possibility that the wiring in the sun visor can short circuit and cause a fire. It specifically affects vehicles built between January 5, 2010, and December 11, 2013, and there are approximately 651,000 of them in the US, 45,700 in Canada, 23,000 in Mexico and 175,000 outside of North America.
Screws that fasten the sunvisor to the headliner may pierce wires in the visor, if the part has been removed or serviced, potentially causing a fire risk. If the wires short circuit, they could overheat and potentially combust. The automakers report three injuries caused by this defect, and according to the investigation by the National Highway Traffic Safety Administration, "there may be a total of 52 unique fire incidents."
To fix the problem, Dodge and Jeep will inspect the vehicles for suspect wiring, and all of the models, whether damaged or not, will get a new sun visor spacer with a wire guide to stop the possibility of short circuits. According to the automakers' announcement, "this condition is not present in vehicles which have not had the headliner or vanity mirror serviced." They will notify affected owners, and repairs will begin in August.