Find or Sell Used Cars, Trucks, and SUVs in USA

2011 Dodge Challenger R/t on 2040-cars

US $30,690.00
Year:2011 Mileage:0
Location:

Webster, Texas, United States

Webster, Texas, United States
Advertising:
Vehicle Title:Clear
For Sale By:Dealer
Engine:5.7L 345Cu. In. V8 GAS OHV Naturally Aspirated
Body Type:Coupe
Transmission:Manual
Fuel Type:GAS
VIN: 2B3CJ5DTXBH601363 Year: 2011
Make: Dodge
Model: Challenger
Disability Equipped: No
Trim: R/T Coupe 2-Door
Doors: 2
Drive Train: Rear Wheel Drive
Drive Type: RWD
Number of Doors: 2
Mileage: 0
Sub Model: R/T
Number of Cylinders: 8
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Texas

Yescas Brothers Auto Sales ★★★★★

New Car Dealers, Used Car Dealers
Address: 11510 US Highway 183 S, Buda
Phone: (512) 243-1717

Whitney Motor Cars ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 5303 Burnet Rd, Round-Rock
Phone: (512) 454-2515

Two-Day Auto Painting & Body Shop ★★★★★

Automobile Body Repairing & Painting, Wheel Alignment-Frame & Axle Servicing-Automotive
Address: 1143 Airport Blvd, Geneva
Phone: (512) 926-9980

Transmission Masters ★★★★★

Automobile Parts & Supplies, Auto Transmission, Auto Transmission Parts
Address: 301 Sampson St, Deer-Park
Phone: (713) 236-1307

Top Cash for Cars & Trucks : Running or Not ★★★★★

Automobile Parts & Supplies, Automobile Salvage
Address: Whitewright
Phone: (817) 966-2886

Tommy`s Auto Service ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Tire Dealers
Address: 219 Fort Worth Dr, Lewisville
Phone: (940) 382-0070

Auto blog

Which electric cars can charge at a Tesla Supercharger?

Sun, Jul 9 2023

The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric.  Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands.  If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla.  Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor.  Here's how to charge up, depending on which EV you have:  Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.

Dodge Challenger SRT Hellcat #0001 raises $825,000 for charity

Sun, 28 Sep 2014

$60,000 doesn't strike us as a lot to pay for a muscle car with 707 horsepower on tap. $825,000... now that's a different story. But, according to the official SRT blog, that's how much one generous and eager buyer paid for the privilege of getting his (or her) hands on the very first new Dodge Challenger SRT Hellcat.
Decked out in Stryker Red paint that's usually reserved for the Viper, the supercharged Challenger bearing the VIN 0001 went up for auction at the Mandalay Bay hotel and casino in Las Vegas on Saturday under the auspices of Barrett-Jackson. By the time bidding ended, the gavel dropped at $825,000 - nearly 14 times the sticker price - 100 percent of which will benefit Opportunity Vehicle, a charity that aids the intellectually handicapped in the Las Vegas Area.

Chrysler investing $20M in Toledo plant to support 9-speed auto production

Sun, 28 Apr 2013

In 2011, Chrysler announced a $72-million investment in its Toledo Machining Plant to modernize production of the eight- and nine-speed torque-converters for automatic transmissions made there. That upgrade work won't be finished until Q3 of this year, but Chrysler has already announced a further $19.6-million investment to increase production capacity for the nine-speeders.
The extra units will be necessary because the nine-speed transmission they'll be mated to is going into three popular models: it will debut on the 2014 Jeep Cherokee, then go into the Chrysler 200 and Dodge Dart. The company predicted that this year alone it would sell 200,000 units equipped with the nine-speed tranny, and it is spending some $374 million in addition to the investment in Toledo to upgrade production capacity for it.
The work attached to this new investment won't begin until Q3 of 2014, and it will be finished by the end of that year. There's a press release below with all the details.