Find or Sell Used Cars, Trucks, and SUVs in USA

Rare Loaded Z71 4x4 V8! Last Year Made All Original Must See! 100pix+video Yukon on 2040-cars

Year:2000 Mileage:160825 Color: Green /
 Tan
Location:

Marysville, Washington, United States

Marysville, Washington, United States
Advertising:
Transmission:Automatic
Vehicle Title:Clear
Engine:5.7L 350Cu. In. V8 GAS OHV Naturally Aspirated
For Sale By:Dealer
Body Type:Sport Utility
Fuel Type:GAS
VIN: 1GNEK13R5YR120245 Year: 2000
Make: Chevrolet
Warranty: Vehicle does NOT have an existing warranty
Model: Tahoe
Trim: Z71 Sport Utility 4-Door
Options: Cassette Player
Power Options: Power Locks
Drive Type: 4WD
Mileage: 160,825
Number of Doors: Generic Unit (Plural)
Sub Model: NO RESERVE!!
Exterior Color: Green
Number of Cylinders: 8
Interior Color: Tan
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Washington

Wild West Cars & Trucks ★★★★★

New Car Dealers, Used Car Dealers
Address: 8830 Lake City Way NE, Duvall
Phone: (206) 523-1400

Walker`s Renton Mazda ★★★★★

New Car Dealers, Used Car Dealers
Address: 200 S Grady Way, Covington
Phone: (425) 277-1370

Volkswagen Repair ★★★★★

Auto Repair & Service
Address: 19611 International Blvd, Seatac
Phone: (206) 789-5516

Valley Automotive Specialties ★★★★★

Auto Repair & Service, Auto Oil & Lube
Address: 810 E Highway 902, Fairchild-Afb
Phone: (509) 299-5446

Tveten`s Auto Clinic ★★★★★

Auto Repair & Service
Address: 5425 Lakewood Towne Center Blvd SW, Steilacoom
Phone: (253) 588-5201

Stillbuilt Automotive ★★★★★

Auto Repair & Service
Address: 3115 T Ave, Blakely-Island
Phone: (360) 299-8252

Auto blog

GM laying off 500 workers to slow Chevy Sonic production

Sat, Oct 24 2015

Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.

Mysterious white powder discovered at GM Orion Assembly

Fri, Sep 2 2016

Workers at General Motors Orion Assembly Plant in Orion Township, MI uncovered a mysterious white powder in two different parts of the factory earlier this week, raising concerns about worker safety. "We can confirm that an unknown substance (white powder) was found on the floor outside of Gate 6 at Orion Assembly on Monday, August 29. On Tuesday, August 30, we had a second report of a bottle containing a similar substance found inside the plant," GM spokesperson Dayna Hart told The Oakland Press via email. GM stressed that incident didn't disrupt operations at the plant, and that the company was taking steps to ensure the safety of the sprawling factory's workers. That did include, an anonymous worker told The Oakland Press, closing off parts of the factory for two full days, as drug-sniffing dogs and crews in haz-mat suits descended on the area. "A sample of the substance has been sent to a laboratory for identification and results are expected later this week," Hart said. "All findings and actions have been shared with our employees." Orion Assembly currently builds the Chevrolet Sonic and Buick Verano, and will eventually be responsible for production of the new, all-electric Chevy Bolt early next year. Related Video: