2015 Chevrolet Tahoe Lt on 2040-cars
1001 N Broad St, Fairborn, Ohio, United States
Engine:5.3L V8 16V GDI OHV
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1GNSKBKC4FR117405
Stock Num: C5012
Make: Chevrolet
Model: Tahoe LT
Year: 2015
Exterior Color: Black
Interior Color: Jet Black
Options: Drive Type: 4WD
Number of Doors: 4 Doors
Price includes: $750 - USAA Private Offer. . Must provide documentation verifying current policy holder or membership with USAA. See dealer for details.
Chevrolet Tahoe for Sale
- 2015 chevrolet tahoe ltz(US $61,102.00)
- 2015 chevrolet tahoe lt(US $52,279.00)
- 2007 chevrolet tahoe(US $13,900.00)
- 2007 chevrolet tahoe ls(US $16,900.00)
- 2011 chevrolet tahoe lt(US $36,995.00)
- 2007 chevrolet tahoe
Auto Services in Ohio
Zerolift ★★★★★
Worthington Towing & Auto Care Inc ★★★★★
Why Pay More Motors ★★★★★
Wayne`s Auto Repair ★★★★★
Walt`s Auto Inc ★★★★★
Voss Collision Centre ★★★★★
Auto blog
GM cutting Chevy Sonic, Buick Verano production by more than 20%
Sat, Jun 13 2015General Motors' Orion Assembly plant in Michigan is seeing even more production cuts this year to further reduce inventories of the Chevrolet Sonic and Buick Verano. These latest adjustments mean layoffs for about 100 workers in phases starting in July. "GM Orion Assembly will adjust plant production capacity to better align with market demand," the company said in a statement announcing the change. Through May, sales of the Sonic are down 28.5 percent to 29,082 vehicles, and the Verano is off 15.6 percent, with 15,279 sold this year. According to unnamed plant insiders speaking to Automotive News, the assembly rate is slowing at Orion Assembly from the current 33 cars an hour down to 26 an hour, a 21-percent reduction. GM is also reportedly going to keep the plant idle for three weeks during the normal summer shutdown, rather than the usual two. Earlier in the year, the factory was idled for two weeks due to excess supply of the Sonic and Verano. In March, it was closed again for several days for the same reason. The Orion Assembly plant is the future home to the line for the Chevy Bolt EV. GM Statement: GM Orion Assembly will adjust plant production capacity to better align with market demand. A phased layoff of approximately 100 employees will begin in July 2015 and conclude by year-end. Related Video: News Source: Automotive News - sub. req.Image Credit: Bill Pugliano / Getty Images Plants/Manufacturing Buick Chevrolet GM Hatchback Sedan buick verano orion assembly
Autoblog Podcast #380
Tue, May 13 2014Episode #380 of the Autoblog podcast is here, and this week, Dan Roth, Chris Paukert and Seyth Miersma talk about the Fiat-Chrysler five-year plan, the seeming demise of the Nissan Cube, and proposed legislation to require speed limiters with a 68-mph maximum on America's tractor trailers. We start with what's in the garage and finish up with some of your questions, and for those of you who hung with us live on our UStream channel, thanks for taking the time. Check out the new rundown below with times for topics, and you can follow along down below with our Q&A. Thanks for listening! Autoblog Podcast #380: Topics: Fiat-Chrysler five-year plan Nissan Cube on the way out? Big rig speed limiters coming? In the Autoblog Garage: 2015 Mercedes-Benz S63 AMG 2014 Chevrolet Sonic RS Sedan 2014 Honda Odyssey Touring Elite Hosts: Dan Roth, Chris Paukert, Seyth Miersma Runtime: 01:44:17 Rundown: Intro and Garage - 00:00 Fiat Chrysler Plan - 29:40 Nissan Cube - 01:07:33 Semi Speed Limiters - 01:17:33 Q&A - 01:27:35 Get the podcast: [UStream] Listen live on Mondays at 10 PM Eastern at UStream [iTunes] Subscribe to the Autoblog Podcast in iTunes [RSS] Add the Autoblog Podcast feed to your RSS aggregator [MP3] Download the MP3 directly Feedback: Email: Podcast at Autoblog dot com Review the show in iTunes Auto News Earnings/Financials Plants/Manufacturing Podcasts Rumormill Chevrolet Chrysler Dodge Fiat Jeep Nissan nissan cube speed limiters
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.