2012 Chevrolet Tahoe Ls on 2040-cars
2712 E. Main St., Plainfield, Indiana, United States
Engine:5.3L V8 16V MPFI OHV Flexible Fuel
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1GNSCAE02CR306199
Stock Num: PC4701A1
Make: Chevrolet
Model: Tahoe LS
Year: 2012
Exterior Color: Gold Mist Metallic
Options: Drive Type: RWD
Number of Doors: 4 Doors
Mileage: 20313
**Certified**, **Clean Carfax**, and **Fresh Trade**. Stillness in motion. Worry-free controls.
Who could say no to a simply outstanding SUV like this wonderful-looking 2012 Chevrolet Tahoe? GM Certified Pre-Owned means you not only get the reassurance of a 12mo/12,000-Mile Bumper-to-Bumper limited warranty, but also a 2yr/24,000-Mile Standard CPO Maintenance Plan, up to a 5-Year/100,000-Mile, $0 Deductible, Fully Transferable, Powertrain Limited Warranty, a 172-point inspection/reconditioning, 24/7 roadside assistance, Courtesy Transportation, 3-Day/150-Mile Customer Satisfaction Guarantee, 3 month trial OnStar Directions & Connections Service if available, SiriusXM Radio 3mo trial if available, and a vehicle history report. Climb into this terrific Tahoe and be impressed by the low mileage number staring back at you. This baby's life is just getting started. Come see the all new beautiful Andy Mohr Chevrolet showroom in Plainfield, Indiana where you get MOHR FOR YOUR MONEY! ***Call us today 888-720-8904***Andy Mohr Chevrolet is a FOUR TIME G.M. Mark of Excellence Award Winner. Print this ad and ask for the INTERNET SALES DEPARTMENT, to get your Andy Mohr Chevrolet ***SPECIAL INTERNET PRICE*** We will also include a full tank of gas with your purchase if you bring in this ad. MUST ask for the INTERNET SALES DEPARTMENT.
Chevrolet Tahoe for Sale
- 2001 chevrolet tahoe ls(US $6,999.00)
- 2015 chevrolet tahoe lt(US $51,229.00)
- 2015 chevrolet tahoe lt(US $53,995.00)
- 2015 chevrolet tahoe lt(US $53,995.00)
- 2015 chevrolet tahoe lt(US $51,110.00)
- 2015 chevrolet tahoe lt(US $51,378.00)
Auto Services in Indiana
Wilson`s Transmission ★★★★★
Westside Motors ★★★★★
Tom Roush Mazda ★★★★★
Tom & Ed`s Autobody Inc ★★★★★
Seniour`s Auto Salvage ★★★★★
Ryan`s Radiator & Auto Air Service ★★★★★
Auto blog
Next-gen Chevy Volt will get 1.5-liter, four-cylinder engine
Tue, Oct 28 2014As General Motors gets ready to unveil the new Chevy Volt at the Detroit Auto Show in January, it's starting to reveal a few more details about the updated plug-in hybrid. Today should be fruitful on that front, thanks to an event GM is hosting today that focuses on the new Volt, and we've just had the first bit of new: a bigger engine is coming. Since the beginning, the Volt has used a 1.4-liter, four-cylinder engine as a range extender when the battery runs dry. The second-generation model will instead get a slightly larger 1.5-liter, four-cylinder engine that will be built in Flint, MI. That's a step up from the various engines that have been a part of the 2016 Volt's rumored mills, everything from a 1.0-liter or 1.2-liter three-cylinder to a 2.0-liter turbo. The confirmation about the new 1.5-liter powerplant was found in Automotive News, where we also heard again that GM is going to start building the new Volt's electric drive unit in Detroit, moving production up from Mexico. We will have more information on the 2016 Chevy Volt later today.
GM laying off 500 workers to slow Chevy Sonic production
Sat, Oct 24 2015Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.