Find or Sell Used Cars, Trucks, and SUVs in USA

1995 Chevrolet Tahoe Ls Sport Utility 2-door 5.7l on 2040-cars

US $8,500.00
Year:1995 Mileage:183589
Location:

Orange Park, Florida, United States

Orange Park, Florida, United States

95 chevy tahoe 2 door, 11 inch of lift, custom new paint, molded bumpers and windshield cowl, flow master exhaust, cold a/c, new glass, 37x13.50 toyo MT tires on 20x12 xd wheels. truck is a real head turner. no rust. body work is better than factory ever came out with, to many new parts. Over 15 k in truck. I have a new toy I am spending time on. 

Auto Services in Florida

Yesterday`s Speed & Custom ★★★★★

Automobile Parts & Supplies, Automobile Performance, Racing & Sports Car Equipment
Address: 13654 N 12th St, Wesley-Chapel
Phone: (813) 903-0000

Wills Starter Svc ★★★★★

Automobile Parts & Supplies, Automobile Electric Service, Automotive Alternators & Generators
Address: 4695 49th St N, Ruskin
Phone: (727) 522-7420

WestPalmTires.com ★★★★★

Auto Repair & Service, Tire Dealers, Brake Repair
Address: 1705 N Dixie Hwy, Glen-Ridge
Phone: (561) 833-8884

West Coast Wheel Alignment ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Wheel Alignment-Frame & Axle Servicing-Automotive
Address: 2467 Lafayette St, Lehigh-Acres
Phone: (239) 332-0588

Wagen Werks ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Automobile Customizing
Address: 10142 103rd St # 207, Julington-Creek
Phone: (904) 317-6799

Villafane Auto Body ★★★★★

Automobile Body Repairing & Painting, Radiators Automotive Sales & Service
Address: 170B Industrial Loop S, Saint-Johns
Phone: (904) 375-0600

Auto blog

GM to squeeze out more production capacity for midsize trucks

Tue, May 26 2015

General Motors was predicting a strong showing for the Chevrolet Colorado and GMC Canyon before they debuted, and demand among dealers for the midsize trucks even exceeded company's expectations. The positive situation has left GM with a problem, though: finding ways to increase capacity for the pickups at the Wentzville Assembly plant in Missiouri. With a third shift already running, GM has continued to look for ways to build just a few more of the trucks at the plant. The company has plans to hire as many as 1,000 more workers for the Saturday and Sunday shifts to construct an additional 2,000 pickups a month, according to unnamed insiders at the factory speaking to Automotive News. The little adjustments even extend to getting rid of an unpaid break to add 18 minute of assembly time over the course of a day, which equals about 3,500 more vehicles a year. All of this effort comes because the trucks are in such high demand. According to GM's figures, the company has delivered a combined 35,720 units of the Colorado and Canyon from January through April 2015, and the Chevy was the fastest-selling truck in the US for the previous three months. In May, it spent an average of just 12 days in showrooms before being snapped up. And even better for the company, 43 percent of these buyers came from other brands. According to Automotive News, the most popular trade-ins have included the Ford F-150, Toyota Tacoma, and Dodge Dakota. Related Video:

GM recalling 250,000 SUVs over door electronics

Mon, 20 Aug 2012

After a door-fire investigation that dates back to February, the National Highway Traffic Safety Administration has officially announced a recall today that affects around 250,000 General Motors SUVs for a faulty driver's door module. The recall applies to the Buick Rainier, Chevrolet Trailblazer, GMC Envoy, Isuzu Ascender and Saab 9-7X from the 2006 and 2007 model years, as well as the 2006 Chevrolet Trailblazer EXT and GMC Envoy XL for vehicles sold and/or registered in the Snow Belt.
Road salt use in these midwestern and northern states can lead to corrosion of the driver's door module on these GMT360 and GMT370 vehicles, which allows water to come in contact with the circuit board. If shorted out, the vehicle's power door locks and power windows will not work, and could possibly lead to overheating and, in some circumstances, a fire. No official word on how many total vehicles caught on fire, but back in June, 28 fires had been reported to the government agency. A fix for the problem is still being worked out, but all affected vehicle owners will be notified by GM.
Scroll down for the official NHTSA statement.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.