2014 Ltz Crew 4x4 Z71 Navigation Leather Heated Duramax Diesel Rear Camera on 2040-cars
Vernon, Texas, United States
Vehicle Title:Clear
Fuel Type:Diesel
Engine:8
For Sale By:Dealer
Transmission:Automatic
Make: Chevrolet
Model: Silverado 2500
Mileage: 0
Disability Equipped: No
Sub Model: LTZ Crew Cab 4x4 Z71
Doors: 4
Exterior Color: Gray
Cab Type: Crew Cab
Interior Color: Black
Drivetrain: Four Wheel Drive
Chevrolet Silverado 2500 for Sale
2014 ltz crew 4x4 z71 navigation leather heated duramax diesel rear camera(US $54,075.00)
2014 ltz crew 4x4 z71 navigation leather heated duramax diesel lifetime warranty(US $53,948.00)
2001 chevy silverado 2500hd 4x4 newer tires runds great
2014 ltz crew 4x4 z71 navigation leather heated duramax diesel lifetime warranty(US $53,948.00)
2014 ltz crew 4x4 z71 navigation leather heated duramax diesel lifetime warranty(US $53,948.00)
2014 ltz crew 4x4 z71 navigation sunroof leather heated turbo diesel mylink(US $55,499.00)
Auto Services in Texas
Woodway Car Center ★★★★★
Woods Paint & Body ★★★★★
Wilson Paint & Body Shop ★★★★★
WHITAKERS Auto Body & Paint ★★★★★
Westerly Tire & Automotive Inc ★★★★★
VIP Engine Installation ★★★★★
Auto blog
GM veteran Bryan Nesbitt tapped to head Buick design
Sat, Jun 6 2015General Motors styling veteran Bryan Nesbitt (pictured above) took over a new role on Monday as executive director of global Buick design and global architectures. Andrew Smith, who previously did that job and also coordinated the look for Cadillac, has remained in charge of the pen at Caddy with this shift. Nesbitt rose to prominence when he designed the Chrysler PT Cruiser, according to Automotive News. He joined GM in 2001 and has been there ever since in multiple high-level roles. In 2007, he was appointed vice president of design for North America and was later briefly general manager of Cadillac in 2009-2010. Nesbitt took over as the vice president of GM's international operations design in China in 2011. This shuffle also moves Ken Parkinson, currently styling boss for Chevrolet trucks, to China as design vice president there. In addition, John Cafaro becomes the person in charge of the look for Chevy globally, rather than previously splitting that role between cars and trucks with Parkinson. GM Global Design Leadership Changes – effective June 1, 2015. Bryan Nesbitt, Design Vice President, GM China will repatriate to North America and assume the position of Executive Director, Global Buick and Global Architectures. He will be located in Warren, MI. Bryan will be the design Champion for Buick in the US and China. Ken Parkinson, Executive Director, Global Chevrolet Trucks and Global Architecture will assume the position of Design Vice President, GM China. He will be based in Shanghai, China. Andrew Smith, Executive Director, Global Cadillac and Buick Design will assume the position of Executive Director, Global Cadillac. He will continue to be the design Champion for the Cadillac brand. In addition, he will continue to lead the Global Color & Trim team. He will be based in Warren, Michigan. John Cafaro, Executive Director, Global Chevrolet Cars will assume the position of Executive Director, Global Chevrolet. He will be the design Champion for Chevrolet. In addition, John will lead the exterior components and accessories team. He will continue to be based in Warren, MI. The roles and responsibilities of Helen Emsley, Mark Adams, Carlos Barba, Clay Dean, Michael Simcoe, and Teckla Rhoades remain the same. Related Video: The video meant to be presented here is no longer available. Sorry for the inconvenience.
GM laying off 500 workers to slow Chevy Sonic production
Sat, Oct 24 2015Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.
GM's Oshawa plant may close after Camaro production moves
Sat, Feb 7 2015Most of the time, when vehicle production is moved from one assembly plant to another, it spells bad news for the former. While General Motors won't go so far as to say its Oshawa, Ontario factory, which is losing the Chevrolet Camaro to the Lansing Grand River plant, is in trouble, analysts seem to think the factory's days are numbered. Forecasts for the facility are far from positive. The loss of the Camaro this year, combined with GM's targeted shutdown of a single-shift assembly line responsible for the fleet-only Chevy Impala Limited and the Equinox crossover is a bad enough omen. But with AutoForecast Solutions CEO Joe McCabe telling The Detroit News that the plant's other two products, the Cadillac XTS and Buick Regal, aren't likely to stick around beyond 2017, things look decidedly grim at Oshawa. "There is a fairly strong chance that the plant could close," Jeff Schuster, senior VP of forecasting for LMC Automotive, told The Detroit News. That doesn't mean that Unifor, Canada's auto union, and the Canadian government are going to let the factory die without a fight. And with the latter chipping in $10 billion as part of GM's 2009 bailout, you might think it has a degree of leverage in the situation. A meeting between the government and the Detroit Three at the 2015 North American International Auto Show revealed that Oshawa is already a topic of conversation. "We made it very clear that we would like to see an indication on the future of Oshawa sooner, in particular because the timing is very challenging for our supply chain to be able to adjust to potentially future orders or changes, but also to know that there are going to be future opportunities at Oshawa," Ontario's Minister of Economic, Development, Employment and Infrastructure Brad Duguid told The Detroit News. "Bottom line: It's time they made a longer-term commitment here," Unifor President Jerry Dias said, echoing Duguid's statements. It's unclear if this sort of strong talk will be enough to save 3,300-plus employees, although based on the analysts' forecasts, we doubt it.