2010 Chevrolet Silverado 1500 Z71 Ltz Crew Cab 4x4 - Lifted on 2040-cars
McKinney, Texas, United States
Engine:8
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Make: Chevrolet
Cab Type (For Trucks Only): Crew Cab
Model: Silverado 1500
Warranty: Vehicle does NOT have an existing warranty
Mileage: 38,910
Sub Model: LTZ Crew Cab
Exterior Color: Black
Disability Equipped: No
Interior Color: Black
Doors: 4
Drive Train: Four Wheel Drive
Chevrolet Silverado 1500 for Sale
- 2009 chevrolet silverado lt z-71 4x4, low miles, aggressive exhaust!!(US $22,900.00)
- 2010 silverado 1500 4x4 crew cab 5.3l vortec v8 flexfuel auto factory warranty(US $28,980.00)
- Leather cloth 4x4 2wd chevy truck nav
- 2008 chevrolet silverado 1500 4wd 4x4 crew cab 143.5 lt2 one owner leather(US $25,991.00)
- Chevy silverado 4x4 lt low miles clean leather steps clean crew cab
- 2006 chevrolet silverado 1500 8' long bed(US $5,995.00)
Auto Services in Texas
Your Mechanic ★★★★★
Yale Auto ★★★★★
Wyatt`s Discount Muffler & Brake ★★★★★
Wright Auto Glass ★★★★★
Wise Alignments ★★★★★
Wilkerson`s Automotive & Front End Service ★★★★★
Auto blog
Plug In 2014: VIA makes the case for 'free' plug-in hybrid work vans, trucks
Fri, Aug 1 2014If you're a fleet manager who's been waiting anxiously for the chance to buy a plug-in hybrid van from Via Motors, your wait is almost over. If you work for the right fleet, anyway. David West, the chief marketing efficer for VIA Motors, took AutoblogGreen for a ride around the San Jose Convention Center in a Via van sporting an Electric Blue paint job as part of the Plug In 2014 Conference this week and gave us an update on how things are coming along. The big news is that the Via PHEV van production is going to start by the end of September. Via can currently build two vans an hour at its production plant in Mexico, or about 16 a day and could easily double that. "That would get us to 20,000 a year with two full lines running," West said. "We have the capacity." "There is no way gas can compete with electric." – David West, Via Motors But they can't sell that many quite yet. By the end of December, around 350 Vans will be made, mostly for a $20-million program from the Department of Energy (DOE) and the South Coast Air Quality Management District that will see the vehicles used by fleets that will report energy data to the Idaho National Lab. Via is also finishing up CARB certification for both the van and the company's plug-in hybrid pick-up truck. About 50 percent of Via's technology in the truck will not need to be tested again, since it's the same as what's in the van, but things like crash tests will need to be done twice. Despite the progress, this is not where Via hoped it would be today. The bankruptcy of battery supplier A123, "took about a year off our timeline," West said. "It's been getting a little slow getting it to market, there have been some challenges, particuarly since we had the country's worst recession right in the middle of this wrap up, but it's inevitable in my mind. There is no way gas can compete with electric." Maybe that's why FedEx has expressed an interest in buying around 5,000 units, West said. FedEx already has some pilot vehicles, just like Verizon does, and PG&E wants to replace all of their gas trucks with electric vehicles, which would be another 3,000 sales, he said. Besides the fuel savings, vehicles like these, with easy on-site power generation, could also work wonders in post-disaster situations, he said, since they could replace the need for generators.
Autoblog Podcast #380
Tue, May 13 2014Episode #380 of the Autoblog podcast is here, and this week, Dan Roth, Chris Paukert and Seyth Miersma talk about the Fiat-Chrysler five-year plan, the seeming demise of the Nissan Cube, and proposed legislation to require speed limiters with a 68-mph maximum on America's tractor trailers. We start with what's in the garage and finish up with some of your questions, and for those of you who hung with us live on our UStream channel, thanks for taking the time. Check out the new rundown below with times for topics, and you can follow along down below with our Q&A. Thanks for listening! Autoblog Podcast #380: Topics: Fiat-Chrysler five-year plan Nissan Cube on the way out? Big rig speed limiters coming? In the Autoblog Garage: 2015 Mercedes-Benz S63 AMG 2014 Chevrolet Sonic RS Sedan 2014 Honda Odyssey Touring Elite Hosts: Dan Roth, Chris Paukert, Seyth Miersma Runtime: 01:44:17 Rundown: Intro and Garage - 00:00 Fiat Chrysler Plan - 29:40 Nissan Cube - 01:07:33 Semi Speed Limiters - 01:17:33 Q&A - 01:27:35 Get the podcast: [UStream] Listen live on Mondays at 10 PM Eastern at UStream [iTunes] Subscribe to the Autoblog Podcast in iTunes [RSS] Add the Autoblog Podcast feed to your RSS aggregator [MP3] Download the MP3 directly Feedback: Email: Podcast at Autoblog dot com Review the show in iTunes Auto News Earnings/Financials Plants/Manufacturing Podcasts Rumormill Chevrolet Chrysler Dodge Fiat Jeep Nissan nissan cube speed limiters
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.