Find or Sell Used Cars, Trucks, and SUVs in USA

Chevrolet Other Pickups Na on 2040-cars

US $20,000.00
Year:2009 Mileage:140000 Color: Black
Location:

Newnan, Georgia, United States

Newnan, Georgia, United States
Chevrolet Other Pickups na, US $20,000.00, image 1
Advertising:

2009 - Chevrolet Other Pickups

Auto Services in Georgia

York`s Garage ★★★★★

Auto Repair & Service, Truck Service & Repair
Address: 586 Wayside St NW, Habersham
Phone: (706) 778-4831

Unique Way Custom Automotive ★★★★★

Auto Repair & Service
Address: 3790 Highway 92, Acworth
Phone: (770) 974-4010

U-Save Auto Rental ★★★★★

Used Car Dealers, Car Rental, Truck Rental
Address: 6110 Buford Hwy NE, Avondale-Est
Phone: (770) 734-9177

Troncalli All-Serv ★★★★★

Auto Repair & Service, New Car Dealers, Automobile Leasing
Address: 1575 Church St, Lake-City
Phone: (404) 294-0040

Trinity Mobile Automotive ★★★★★

Auto Repair & Service
Address: 6534 Wild Turkey Trl, Dunwoody
Phone: (404) 750-4732

Top Quality Car Care ★★★★★

Auto Repair & Service, Automobile Electric Service, Automobile Inspection Stations & Services
Address: 276 North Glynn Street, Sunny-Side
Phone: (770) 406-6897

Auto blog

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

Watch the live reveal of the 2014 Chevy Silverado and GMC Sierra [UPDATE]

Thu, 13 Dec 2012

UPDATE: The trucks have been revealed. Click here for all of the official details.
As promised, Chevrolet and GMC are offering a live webcast of the world premiere for the all-new 2014 Silverado 1500 and Sierra 1500. After being teased with spy shots and blurry images like the one above for ages, now is the time to see the trucks in the metal, for real (well, as 'real' as it gets on a webcast, at any rate).
Shift your eyes down just below to see the reveal as it happens, starting at 9:30 AM EST. We anticipate having loads of images full technical information to share after the webcast, too, so truck aficionados should stay tuned. We'll also be bringing you live images of both trucks too, when we see them on the show floor at next month's Detroit Auto Show.

Our favorite mid-engine Corvette theories and rumors

Tue, Sep 13 2016

The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.