Find or Sell Used Cars, Trucks, and SUVs in USA

Ss 350 4 Speed Nova Black on 2040-cars

Year:1970 Mileage:300
Location:

Chesterfield, Missouri, United States

Chesterfield, Missouri, United States

Very nice ss350 4speed with multileaf 12 bolt rear, factory front disc, factory ss wheels, new bumpers, new hood bezels still have originals, split front bench, new headliner needs installed, new door panels and arm rest. New Front windshield, new carpet. Dual exhaust with headers. Drives good. Tight car. This cars ready to be out on the street. Lots of power

Auto Services in Missouri

Wrench Tech ★★★★★

Auto Repair & Service, Tire Dealers
Address: 510 N Broadway, Camden
Phone: (816) 690-0065

Valvoline Instant Oil Change ★★★★★

Auto Repair & Service, Auto Oil & Lube, Automotive Tune Up Service
Address: 2711 Telegraph Rd, Clayton
Phone: (314) 845-0891

Tint Crafters Central ★★★★★

Auto Repair & Service, Window Tinting, Glass Coating & Tinting
Address: 9740 Manchester Rd, Saint-Ann
Phone: (314) 961-0500

Riteway Foreign Car Repair ★★★★★

Auto Repair & Service
Address: 415 N Hesperia St, North-County
Phone: (618) 345-9055

Pevely Plaza Auto Parts Inc ★★★★★

Automobile Parts & Supplies, Automobile Machine Shop, Auto Body Parts
Address: 20 Gannon Sq, Pevely
Phone: (636) 475-6200

Performance By Joe ★★★★★

Auto Repair & Service
Address: 3443 Hampton Ave, Saint-Ann
Phone: (314) 781-3135

Auto blog

GM won't sell 2014 Chevrolet SS in Canada

Thu, 21 Feb 2013

Allow us to be the first to extend our condolences to our friends to the north. General Motors has announced the 2014 Chevrolet SS will not be available in Canada. The Globe and Mail reports the automaker has confirmed the high-performance sedan won't hit Canadian dealers, though GM hasn't offered up any reasoning as to why that is.
Buyers here in the US of A, meanwhile, can look forward to getting their hands on the 415-horspower, rear-wheel drive SS by late summer. Something tells us it won't be long after that before Canadian officials start seeing individually imported 6.2-liter V8 four-doors in their neighborhoods. Fortunately, Canadian buyers will still be able to take home the 2014 Chevrolet Corvette. The C7 bowed at the Canadian International Auto Show last week, reportedly drawing sizable crowds and interest.

Final C6 Corvette built in Bowling Green

Fri, 01 Mar 2013

With all of the attention given to the 2014 Chevrolet Corvette Stingray lately, you could be forgiven for thinking that it's already well along in production, yet tooling up for the new C7 has only just begun. In fact, production of the outgoing C6 generation in Bowling Green, Kentucky just halted on Thursday.
As the C6 has aged, production numbers have predictably ebbed along with demand, but this year, the addition of the 427 and 60th anniversary models resulted in an uptick in vehicles built - this, despite a model year shortened by around 25 percent to accomodate the new model changeover. The final C6 Corvette ever, No. 13,466 built this year, was a white 427 Convertible destined for the General Motors Heritage Center museum. The car's 7.0-liter V8 heart was assembled by Corvette chief engineer Tadge Juechter himself.
In total, Bowling Green pushed out 215,100 C6 Corvettes over nine years. If you're still a C6 fan at heart and are hoping to get a good deal on a phase-out model, step lively - Chevrolet reportedly had about 6,100 unsold units, which Autoweek suggests is good for around five and a half months of supply at the model's current sales rates. Given that demand will likely slacken even further as the C7 draws closer, that should be a big enough stockpile to keep dealers satisfied until 2014 Stingrays begin showing up on their forecourts in December.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.