1985 Monte Carlo Ss, Custom Paint, Fi Lt1, Built 4l60 Trans, Rear Airbag Susp. on 2040-cars
Acworth, Georgia, United States
Vehicle is local pickup only.
message me with any questions, the car is beautiful going down the road! |
Chevrolet Monte Carlo for Sale
1974 chevrolet monte carlo landau 5.7l(US $12,500.00)
Monte-carlo ss
1978 78 chevrolet monte carlo collector survivor, mint condition, orig 50k miles
Classic show car chevy t tops clean not ford mustang camaro new
2003 chevrolet monte carlo ss high sport coupe 2-door 3.8l
18,000 mile 1986 monte carlo ss like new
Auto Services in Georgia
Wright`s Car Care Inc ★★★★★
Top Quality Car Care ★★★★★
TNT Transmission ★★★★★
Tires & More Complete Car Care ★★★★★
Tims Auto Service ★★★★★
T-N-T Transmission Inc ★★★★★
Auto blog
Engine block heater issues force GM to recall 324,226 diesel heavy duty trucks
Tue, May 7 2019General Motors has issued a recall on 324,226 diesel heavy duty trucks that could be susceptible to short circuits, and consequently, potential fire. The recall affects several models of heavy duty Chevrolet Silverados and GMC Sierras with optional engine block heaters. GM is recalling seven different truck models spread across three years. The recall affects the 2017-2019 Chevrolet Silverado 2500HD, 2017-2019 Silverado 3500HD, 2019 Silverado 4500HD, 2019 Silverado 5500HD, and 2019 Silverado 6500HD, plus the 2017-2019 GMC Sierra 2500HD and 2017-2019 Sierra 3500HD. Specifically, it includes these models with the 6.6-liter Duramax diesel engines and the optional engine block heater. The recall technically deals not with the engine block heater itself, but the way it is connected. According to NHTSA campaign No. 19V328000, the engine block heater cord or the terminals that link the cord to the heater could short circuit. A short circuit could potentially damage engine components and result in a fire. According to The Detroit News, 19 fires have been reported but nobody has been injured. GM has yet to figure out a fix, and thus has not yet released a notification schedule for affected customers. If you believe your vehicle is part of the recall, contact GM customer service at 1-586-596-1733 and use reference number N182206310.
A conversation with GM's Mark Reuss on MPG, aluminum and Corvettes
Wed, Feb 19 2014There was plenty to talk about when General Motors hosted its annual mid-December holiday media reception a few months ago. GM had just decided to pull its global Chevrolet brand out of major European markets, where Chevys have competed directly with GM Europe Opel and Vauxhall vehicles, and the US government had sold its last remaining shares of GM stock. But most important was the company's just-reshuffled leadership. Post-bankruptcy CEO Dan Akerson had announced that he would step aside and that 52-year-old Mary Barra would replace him on January 15. Not only would she be the first woman to lead a major automaker, she would also be GM's first engineer CEO since Bob Stempel in the early 1990s. "I look at 2013 and 2014, as the retooling of General Motors" - Mark Reuss Replacing her as executive VP for global product development (and purchasing and supply chain) would be 49-year-old Mark Reuss, who had served a stellar four years as North American president, and elevated to corporate president (from executive VP and CFO) would be 42-year-old Dan Amman. All three are relatively young auto enthusiasts who are liked and respected inside and outside the company, and their collective talents and experience are highly complementary. I've interviewed Barra and found her smart, personable and knowledgeable, though she carefully walks the corporate line in speaking and answering questions. I met and chatted with Ammann for the first time at that holiday reception, and he made a good first impression. But I've known Reuss for some time as a genuinely good guy and a highly capable and inspiring leader, and I believe he is exactly the right person for the global product responsibility once famously held by the outspoken, oft-controversial Bob Lutz. So I jumped at an opportunity to join a group interview of Reuss (with mostly business reporters) at the Detroit Auto Show in January. It was an interesting session of mostly good questions, which he answered with refreshing candor and humor. "I look at 2013 and 2014, as the retooling of General Motors," Reuss said. "We've taken down almost every plant in North America, converted and turned it this last year, and to do that with award-winning vehicles and pretty flawless launches is key. We have to keep the train rolling on great product, because the rest won't happen without the best product, period." A reporter asked whether GM was pushing big trucks, SUVs and Corvettes again because gas is cheap. "No," Reuss said.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.