1970 Chevy Monte Carlo 350/350 No Rust Northwest Car on 2040-cars
Tacoma, Washington, United States
Fuel Type:Gasoline
For Sale By:Dealer
Engine:350
Transmission:Automatic
Body Type:Coupe
Make: Chevrolet
Model: Monte Carlo
Mileage: 89,405
Warranty: Unspecified
Exterior Color: Green
Trim: MONTE CARLO
Interior Color: Green
Number of Cylinders: 8
Drive Type: AUTO
Options: CD Player
Chevrolet Monte Carlo for Sale
- 1970 chevrolet monte carlo.. 400 ci v8.. auto.. 39k miles.. 2 build sheets.
- Dale earnhardt jr. budweiser replica
- 2001 chevrolet monte carlo ss coupe 2-door 3.8l
- Beautiful 1987 monte carlo ss 44k orig miles !!! mint cond...very fast !!!(US $13,500.00)
- 1985 chevrolet monte carlo ss coupe 2-door 5.0l(US $2,000.00)
- Rare 1987 chevy monte carlo ss aerocoupe with t-top
Auto Services in Washington
We Love Transmissions ★★★★★
Triple T Auto Repair ★★★★★
TOS Used Tires and Accessories ★★★★★
Top Performance Auto Inc. ★★★★★
Tc Auto Sales ★★★★★
Sun City Auto Supply ★★★★★
Auto blog
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.
More Corvette Stingray Factoids: Vanishing panel gaps and 26-mpg LT1
Thu, 28 Feb 2013During January's Detroit Auto Show, we managed a longer than expected wandering tag-team interview with C7 Corvette chief engineering exec Tadge Juechter (pictured above), and LT1 engine boss Jordan Lee (pictured below). They are, quite honestly, two of the very nicest bigshot lads to ever walk the engineering corridors of an American manufacturer. Both are enthralled by what they're doing for a day job. So are we.
We've followed the pre-sale anticipation for the Chevrolet C7 Corvette Stingray like an Oreck vacuum yanking every speck of dirt from a well-trampled carpet. Everything is reportable and contains a grain of further knowledge about this dramatically important and cheered-for car, as it continues to be pressured into representing all that is superior about the American dream. The Corvette wears one heavy cloak.
So, most of what was talked about has been expertly reported already right here on Autoblog. But, looking through our notes again, both Jeuchter and Lee added facts to the buzzing mix.
Final C6 Corvette built in Bowling Green
Fri, 01 Mar 2013With all of the attention given to the 2014 Chevrolet Corvette Stingray lately, you could be forgiven for thinking that it's already well along in production, yet tooling up for the new C7 has only just begun. In fact, production of the outgoing C6 generation in Bowling Green, Kentucky just halted on Thursday.
As the C6 has aged, production numbers have predictably ebbed along with demand, but this year, the addition of the 427 and 60th anniversary models resulted in an uptick in vehicles built - this, despite a model year shortened by around 25 percent to accomodate the new model changeover. The final C6 Corvette ever, No. 13,466 built this year, was a white 427 Convertible destined for the General Motors Heritage Center museum. The car's 7.0-liter V8 heart was assembled by Corvette chief engineer Tadge Juechter himself.
In total, Bowling Green pushed out 215,100 C6 Corvettes over nine years. If you're still a C6 fan at heart and are hoping to get a good deal on a phase-out model, step lively - Chevrolet reportedly had about 6,100 unsold units, which Autoweek suggests is good for around five and a half months of supply at the model's current sales rates. Given that demand will likely slacken even further as the C7 draws closer, that should be a big enough stockpile to keep dealers satisfied until 2014 Stingrays begin showing up on their forecourts in December.