No Reserve Nr Black Leather Sunroof Onstar Cd Player on 2040-cars
Grand Rapids, Michigan, United States
Engine:4
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
Transmission:Automatic
Make: Chevrolet
Cab Type (For Trucks Only): Other
Model: Malibu
Warranty: Vehicle has an existing warranty
Mileage: 45,465
Sub Model: 2LT
Exterior Color: Gray
Disability Equipped: No
Interior Color: Black
Doors: 4
Drive Train: Front Wheel Drive
Chevrolet Malibu for Sale
2005 chevrolet malibu. new fender, new hood, new driver side headlight.(US $3,500.00)
2012(12)maliibu lt silver/black only 22k remote start cruise usb sat save huge!!(US $11,999.00)
2009 chevrolet malibu lt sedan 4-door 2.4l
Warranty* low miles*excellent condition* smoke free*great price!!!!
2010 chevrolet malibu 4dr sdn lt w/1lt traction control power windows
Awesome matching # 1965 chevy malibu chevelle convertible ready to show and go!
Auto Services in Michigan
Young`s Brake & Alignment ★★★★★
Winners Auto & Cycle ★★★★★
Wills Body Shop ★★★★★
West Side Auto Parts ★★★★★
Wealthy Body Shop Inc ★★★★★
Unique Auto Service ★★★★★
Auto blog
Texas sues GM, saying it tricked customers into sharing driving data sold to insurers
Wed, Aug 14 2024Texas filed a lawsuit Tuesday against GM over years of alleged abuse of customers' data and trust. New car owners were presented with a "confusing and highly misleading" process that was implied to be for their safety, but "was no more than a deceptively designed sales flow" that surrendered their data for GM to sell. The suit contends that at no point was selling driving data ever even suggested as a possibility, putting GM in violation of the state's consumer protection laws. Texas Attorney General Ken Paxton is seeking a jury trial and at least $10,000 per offense (every GM car sold in the state since 2015) and a hefty add-on of $250,000 in cases where the victim was over 65. Texas seems to be flying high after a recent $1.4 billion settlement from Meta over other privacy concerns. This may well be a way to solve any pending budgetary issues in the Lone Star State.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM struggles to sell small cars, plans to lay off 2,084 employees at two plants
Thu, Nov 10 2016Due to low demand for some of its vehicles, General Motors plans to cut 2,084 jobs at its assembly plants in Lordstown, OH and Lansing, MI. At the same time, the automaker also announced plans to invest approximately $900 million in three of its facilities – the Toledo Transmission Operations in Ohio, Bedford Casting Operations in Indiana, and Lansing Grand River in Michigan - for future products. GM will discontinue the third shift at both the Lansing Grand River plant and the Lordstown, OH plant. The Cadillac ATS, Cadillac CTS, and Chevrolet Camaro are made at the automaker's plant in Michigan, which currently has 2,700 employees. The move to eliminate the third shift affects 810 hourly workers, as well as 29 salaried employees, starting on January 16th. The plant in Lordstown, OH currently has 4,500 employees and makes the Chevrolet Cruze sedan. The plan to discontinue the third shift will affect 43 salaried workers and 1,202 hourly employees and will start on January 23rd. As Fortune points out, sales of the Cruze are down 20 percent through October, while sales of the Cadillac ATS and CTS were down 17 percent through the same period of time. In addition to cutting the third shift at both assembly plants, the automaker plans to invest a total of $900 million between three of its facilities for unnamed future products. GM's Toledo Transmission Operations will receive $667.6 million, the Lansing Grand River Assembly plant will receive $211 million, and the automaker's Bedford Casting Operations will get $37 million. Last year, GM cut roughly 500 jobs from its Orion Township factory due to slow sales of the Chevrolet Sonic and Buick Verano, with surging crossover and SUV sales as the most likely culprit. With GM posting much healthier sales figures for the Chevrolet Equinox and Cadillac XT5 compared to the ATS, CTS, and Cruze, it looks like compact SUVs are to blame for this year's layoffs as well. Related Video: News Source: Fortune, General MotorsImage Credit: REUTERS / Rebecca Cook Hirings/Firings/Layoffs Plants/Manufacturing Cadillac Chevrolet GM Coupe Sedan Lordstown Ohio