Find or Sell Used Cars, Trucks, and SUVs in USA

2011 Chevy Malibu Ls Sedan Salvage Repairable Title Project No Reserve on 2040-cars

Year:2011 Mileage:31544 Color: Tan /
 Black
Location:

Broadalbin, New York, United States

Broadalbin, New York, United States
Transmission:Automatic
Body Type:Sedan
Vehicle Title:Salvage
Engine:2.4 Liter
Fuel Type:Gasoline
For Sale By:Dealer
VIN: 1g1za5e14bf395635 Year: 2011
Number of Cylinders: 4
Make: Chevrolet
Model: Malibu
Trim: LS
Options: CD Player
Drive Type: Front Wheel Drive
Safety Features: Anti-Lock Brakes, Driver Airbag, Passenger Airbag, Side Airbags
Mileage: 31,544
Power Options: Air Conditioning, Cruise Control, Power Locks, Power Windows
Sub Model: No Reserve
Exterior Color: Tan
Interior Color: Black
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in New York

Witchcraft Body & Paint ★★★★★

Auto Repair & Service, Automobile Body Repairing & Painting, Glass-Auto, Plate, Window, Etc
Address: 70 Corliss Ave, Victory-Mills
Phone: (518) 692-7774

Will`s Wheels ★★★★★

Automobile Parts & Supplies, Wheels, Automobile Accessories
Address: 527 Atlantic Ave # B, Uniondale
Phone: (929) 224-0634

West Herr Chevrolet Of Williamsville ★★★★★

New Car Dealers, Used Car Dealers
Address: 8040 Transit Rd, East-Amherst
Phone: (716) 632-5110

Wayne`s Radiator ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Radiators Automotive Sales & Service
Address: 6080 Court Street Rd, Syracuse
Phone: (315) 437-6172

Valley Cadillac Corp ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 3100 Winton Rd S, Rush
Phone: (585) 427-8400

Tydings Automotive Svc Station ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Accessories
Address: 1968 E Ridge Rd, Irondequoit
Phone: (585) 467-2240

Auto blog

Chevy EN-V 2.0 coming to Tianjin Eco-City in China

Fri, Jun 20 2014

Chevrolet is bringing its EN-V 2.0 to the Sino-Singapore Tianjin Eco-City in China to show off the "Electric Networked-Vehicle" and demonstrate sustainable urban mobility. The small, two-seat EV concept is an updated version of the original EN-V, a vision of getting around in a future world where space is at a premium and clean air is a priority. So what better place to showcase the evolved EN-V than at the Tianjin Eco-City? The Eco-City is being developed as a planned urban space with eco-consciousness built in. The joint venture between China and Singapore offers an alternative to country living and smog-filled cities. Tianjin Eco-City, slated to be completed by 2020, will be able to offer 350,000 inhabitants clean air and water, renewable energy, green transportation and living spaces and, if all goes as planned, jobs for 50 percent of the residents. Currently, only about three square kilometers of the planned 30 square kilometers have been built, with only about 6,000 permanent residents, but there's still time. The EN-V 2.0, as the "Networked" part of its name suggests, not only features mobile internet, but can communicate with other cars around it. Along with GPS and built-in sensors, this connection between vehicles allows the car to drive autonomously (at least in theory - again, there's still time). This is ideal in an urban environment where congestion can be a major issue. The EN-V 2.0 improves upon the original concept with climate control, storage space and all-weather capability, which also make life more bearable and daily commuting possible. We first saw renderings of the updated vehicle in 2012. The Chevrolet EN-V 2.0 will be used in the Eco-City's National Animation Industry Park and Eco-Business Park of the course of the two-week demonstration. Read on below for more in the press release from GM. GM to Demonstrate Chevrolet EN-V 2.0 in Tianjin Eco-City SHANGHAI – General Motors today announced that it will begin demonstrating the Chevrolet EN-V 2.0 (Electric Networked-Vehicle) in the Sino-Singapore Tianjin Eco-City this week, signaling the company's learning and progress in sustainable urban mobility. The demonstration will help GM further understand consumers' usage of low-speed transportation tools for their daily commute. During the two-week demonstration period, the EN-V 2.0s will be used in the National Animation Industry Park and Eco-Business Park inside the Sino-Singapore Tianjin Eco-City.

Officially Official: Chevrolet replaces Daewoo name in Korea

Thu, 20 Jan 2011



Chevrolet Camaro in Korea - Click above for high-resolution image

There once was a time when Daewoo was one of the biggest companies in South Korea. It was larger than both LG and Samsung, and second only to Hyundai. But these days the name is all but gone.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.