2014 Chevrolet Impala Ltz on 2040-cars
8685 Colerain Ave, Cincinnati, Ohio, United States
Engine:Gas/Ethanol V6 3.6L/217
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 2G1155S32E9164074
Stock Num: E00486
Make: Chevrolet
Model: Impala LTZ
Year: 2014
Exterior Color: Red Rock Metallic
Options: Drive Type: FWD
Number of Doors: 4 Doors
Customer must print listing & present as coupon to receive internet pricing. Internet coupon pricing is not valid in combination with any other offer. Please verify all price and equipment info. Dealer not responsible for clerical and/or typographical errors related to vehicle pricing or equipment. All prices are "plus Tax, Title & License fees."
Chevrolet Impala for Sale
2014 chevrolet impala ltz(US $42,265.00)
2014 chevrolet impala lt(US $32,885.00)
2014 chevrolet impala lt(US $31,835.00)
2014 chevrolet impala ltz(US $36,640.00)
2014 chevrolet impala 1lt(US $30,860.00)
2014 chevrolet impala 1lt(US $30,860.00)
Auto Services in Ohio
Zink`s Body Shop ★★★★★
XTOWN PERFORMANCE ★★★★★
Wooster Auto Service ★★★★★
Walker Toyota Scion Mitsubishi Powersports ★★★★★
V&S Auto Service ★★★★★
True Quality Collision ★★★★★
Auto blog
Which electric cars can charge at a Tesla Supercharger?
Sun, Jul 9 2023The difference between Tesla charging and non-Tesla charging. Electrify America; Tesla Tesla's advantage has long been its charging technology and Supercharger network. Now, more and more automakers are switching to Tesla's charging tech. But there are a few things non-Tesla drivers need to know about charging at a Tesla station. A lot has hit the news cycle in recent months with regard to electric car drivers and where they can and can't plug in. The key factor in all of that? Whether automakers switched to Tesla's charging standard. More car companies are shifting to Tesla's charging tech in the hopes of boosting their customers' confidence in going electric. Here's what it boils down to: If you currently drive a Tesla, you can keep charging at Tesla charging locations, which use the company's North American Charging Standard (NACS), which has long served it well. The chargers are thinner, more lightweight and easier to wrangle than other brands. If you currently drive a non-Tesla EV, you have to charge at a non-Tesla charging station like that of Electrify America or EVgo — which use the Combined Charging System (CCS) — unless you stumble upon a Tesla charger already equipped with the Magic Dock adapter. For years, CCS tech dominated EVs from everyone but Tesla. Starting next year, if you drive a non-Tesla EV (from the automakers that have announced they'll make the switch), you'll be able to charge at all Supercharger locations with an adapter. And by 2025, EVs from some automakers won't even need an adaptor. Here's how to charge up, depending on which EV you have: Ford 2021 Ford Mustang Mach-E. Tim Levin/Insider Ford was the earliest traditional automaker to team up with Tesla for its charging tech. Current Ford EV owners — those driving a Ford electric vehicle already fitted with a CCS port — will be able to use a Tesla-developed adapter to access Tesla Superchargers starting in the spring. That means that, if you own a Mustang Mach-E or Ford F-150 Lightning, you will need the adapter in order to use a Tesla station come 2024. But Ford will equip its future EVs with the NACS port starting in 2025 — eliminating the need for any adapter. Owners of new Ford EVs will be able to pull into a Supercharger station and juice up, no problem. General Motors Cadillac Lyriq. Cadillac GM will also allow its EV drivers to plug into Tesla stations.
2014 Chevrolet SS makes its live debut
Sat, 16 Feb 2013Chevrolet showed off the new 2014 SS in an airport hangar last night, its first rear-wheel-drive performance sedan in the US since the Impala SS from 1997. We'll have more to say about the SS later today, but this is the sedan that Chevrolet sees as the final piece in restoring its performance credentials. For those of you looking for a manual transmission, however, that wish will go unfulfilled - at least for now: the only two options buyers will have are the color and whether or not they want a sunroof.
We'll work on getting some more angles (in better light) today at Daytona International Speedway, but with fans seeing the car for the first time, we don't hold out much luck of getting a clear shot. So for now, enjoy the high-res gallery above.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.