2013 Chevrolet Cruze 1lt on 2040-cars
850 W National Rd, Vandalia, Ohio, United States
Engine:1.4L I4 16V MPFI DOHC Turbo
Transmission:6-Speed Automatic
VIN (Vehicle Identification Number): 1G1PC5SB8D7107787
Stock Num: 3201PG
Make: Chevrolet
Model: Cruze 1LT
Year: 2013
Exterior Color: Red
Options: Drive Type: FWD
Number of Doors: 4 Doors
Mileage: 17642
*********** If you have any questions or would like to schedule an Appointment for your test drive or our hassle free vehicle appraisal, Please feel free to contact me. Thank You Chad Valerio Internet Sales Manager 866-906-6681 Internetsales@Smedleys.com ***********
Chevrolet Cruze for Sale
- 2014 chevrolet cruze ls(US $18,345.00)
- 2014 chevrolet cruze ls(US $19,505.00)
- 2014 chevrolet cruze 1lt(US $19,640.00)
- 2014 chevrolet cruze 1lt(US $20,735.00)
- 2014 chevrolet cruze 2lt(US $25,085.00)
- 2013 chevrolet cruze ls(US $15,995.00)
Auto Services in Ohio
West Chester Autobody Inc ★★★★★
West Chester Autobody ★★★★★
USA Tire & Auto Service Center ★★★★★
Trans-Master Transmissions ★★★★★
Tom & Jerry Auto Service ★★★★★
Tint Works, LLC ★★★★★
Auto blog
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
GM will make Chevy Volt production announcement tomorrow
Mon, Apr 7 2014Thing are apparently happening to get the next-generation Chevy Volt ready for public consumption. The most obvious proof is in a preview of an announcement (possibly coming tomorrow) that the two main places where General Motors gets the Volt ready -the Detroit-Hamtramck Assembly Plant and the Brownstown Township battery assembly facility - will be getting big money upgrades and lots of new positions. The Hamtramck plant builds the Volt and its fancier cousin, the Cadillac ELR, as well as the global versions of the Volt. The Detroit News reports that GM will add 1,400 jobs and spend roughly $450 million at the two locations in order to build the redesigned Volt. What's less clear is exactly what the updates will bring us. We've heard that the new volt will be a 2016 model and come on a new chassis. Speculation in The Detroit News about tomorrow's announcement runs the gamut from a new compact PHEV with less electric range and a lower price (which makes sense) to an updated Volt with more electric range (heard it before) to a new all-electric vehicle (the moon shot). If there's any hints to be gleaned in the international Volts, there are also reports coming in that the Opel brand will get an all-electric vehicle that is cheaper than the Ampera. Read into that what you will. We pestered GM's Kevin Kelly on the new Volt (again) and he said (again) that he couldn't give out any more detail other than what's been reported. He just told AutoblogGreen that there will be an announcement tomorrow and that it will be about the Hamtramck and Brownstown facilities and involve the Volt. So, stay tuned.
GM recalls 200k Hummer H3s for fire risk
Thu, Jul 9 2015An issue with fires erupting in some Hummers has prompted General Motors and the National Highway Traffic Safety Administration to issue a recall for nearly 200,000 vehicles around the world. The bulk of them are in the United States. According to the first statement (below) obtained by Autoblog from GM, the issue stems from the HVAC system in Hummer H3 models. The connector module for the blower motor has, in certain cases, overheated, melted the surrounding plastic, and started a fire. 42 such cases have been reported, including three instances of occupants citing minor burns. GM confirms that two of those three cases lead to the vehicle being destroyed in the fire, but states that no crashes or fatalities have resulted. The issue affects 196,379 examples of the 2006-10 H3 wagon and the 2009-10 H3T pickup, with 164,993 estimated to be in the United States. In order to fix the issue, dealers are being instructed to replace the relevant parts of the connector and harness. In a second, unrelated campaign, GM is also calling in 50,731 Chevy Spark and Sonic small cars – 45,785 of them in the US – due to a software glitch. In those affected vehicles fitted with the base radio and OnStar system, the audio system may not be able to switch out of turn-by-turn direction mode, causing the display to go blank and all sound to mute – including key safety warnings. In addition, the system may not switch off, draining the battery. GM states that no crashes, injuries, or fatalities have resulted from this issue, and all that dealers will need to do in this case is reflash the software. Related Video: General Motors is recalling 164,993 2006-2010 model year HUMMER H3 and 2009-2010 model year HUMMER H3T models in the U.S. In certain vehicles, the connector module that controls the blower motor speed in the heat/vent/air conditioning (HVAC) system may overheat under extended periods of operation at high- and medium-high speeds. The heat could melt the plastic surrounding the connector module, increasing the risk of a fire. Dealers will replace the affected portion of the connector and harness. GM is aware of three reported minor burns and 42 fires but no crashes or fatalities related to this condition. Including Canada, Mexico and exports, the total recall population is 196,379. ### General Motors is recalling 45,785 2014-2015 model year Chevrolet Sparks, and 2015 model year Chevrolet Sonics in the U.S.