Find or Sell Used Cars, Trucks, and SUVs in USA

2014 - Chevrolet Corvette on 2040-cars

US $20,000.00
Year:2014 Mileage:2964 Color: Black
Location:

Smithville, West Virginia, United States

Smithville, West Virginia, United States
2014 - Chevrolet Corvette, US $20,000.00, image 1

2014 Corvette Stingray with less then 3000 miles. The car is a beautiful black exterior with stunning red adrenaline leather interior. Car has always been garage kept and covered and has never seen a drop of rain . I have both fob's and all manuals.I have included pics of the window sticker which shows the standard equipment and all the options which was too much for for me to type . This is a beautiful very well equipped like brand new Corvette Stingray 2LT that is priced around the same as a lot less equipped 1lt.

Auto Services in West Virginia

Todd Auto Body Inc ★★★★★

Automobile Body Repairing & Painting, Dent Removal, Towing
Address: 13899 Molly Pitcher Hwy, Falling-Waters
Phone: (717) 977-5154

Ramey 9999 Or Less ★★★★★

New Car Dealers
Address: RR 460, Kegley
Phone: (304) 425-9999

Pro Tech Autocare ★★★★★

Auto Repair & Service
Address: 13952 Webster Rd, Calvin
Phone: (304) 742-5005

ohio motor group ★★★★★

Used Car Dealers, Financing Services, Warranty Contracts
Address: 56341 national rd, Glen-Dale
Phone: (740) 633-0039

Mercury Endurance Cycles ★★★★★

New Car Dealers
Address: 222 E Oak Ridge Dr, Falling-Waters
Phone: (240) 347-4959

Far From Factory ★★★★★

Automobile Body Repairing & Painting
Address: 2686 US Rt. 60, Ona
Phone: (304) 360-2140

Auto blog

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

GM already raising prices on 2014 Silverado and Sierra pickups

Mon, 14 Oct 2013

General Motors must be pretty pleased with sales of its two newest pickups, the GMC Sierra and Chevrolet Silverado, as it's announced price hikes for both models, as part of a planned price tweak.
Prices will be bumped by as much as $1,500, although weirdly, they'll be offset by as much as $1,500 in cash-back offers through the end of October. Fox Business reports that GM spokesman Jim Cain said of the price hike, "With the sell down of the '13 models nearly complete, this price adjustment was planned and is a normal part of business."
The move, as Fox is quick to point out, is an interesting one, as sales of the twin pickups struggled last month relative to the Ford F-Series, while both of GM's crosstown competitors have been aggressively undercutting Silverado and Sierra prices. The F-150 starts at $24,070 and the Ram 1500 comes in at $23,600, not counting any cash on the hood. A base Silverado, meanwhile, retails at $25,575.