Chevrolet Cobalt Ls 4 Dr Sedan Automatic Gasoline 2.2l L4 Mpi Dohc Summit White on 2040-cars
Rick Hendrick Chevrolet at Gwinnett Place, 3277 Satellite Blvd, Duluth, GA 30096
Chevrolet Cobalt for Sale
2006 chevrolet cobalt ls coupe 2-door 2.2l
2007 chevy cobalt it has clear title the engine is bad tow it away
2006 chevrolet cobalt ls coupe - no reserve - runs like new manual transmission
4dr sdn lt w/1lt low miles sedan automatic gasoline engine, ecotec 2.2l continuo(US $11,990.00)
2007 chevrolet cobalt lt(US $6,995.00)
2005 chevrolet cobalt lt sedan 4-door 2.2l
Auto blog
Tarantino's stolen Chevy Malibu from Pulp Fiction recovered after 19 years [w/video]
Mon, 29 Apr 2013Quentin Tarantino fans will likely remember Vincent Vega's cherry 1964 Chevrolet Malibu Convertible in Pulp Fiction. In a movie drenched in automotive references, the Malibu is very nearly a character in and of itself, and it serves as the subject of Vega's soliloquy about the kind of man who vandalizes another's automobile. It also happened to be Tarantino's personal car when the film was shot, and was apparently stolen shortly after production wrapped. Now police have located the car some 19 years later.
As it turns out, the thieves cloned the vehicle identification number from another '64 Malibu and had the car registered under the new digits. It was then sold to an unsuspecting buyer. Police happened upon the duplicate VINs while investigating another potential theft. Right now, it's unclear whether Tarantino has taken possession of the Chevrolet, if it has remained in the possession of the fraud victim, or whether it's caught somewhere in the gears of justice. Either way, you can catch Vega's memorable thoughts on the car keying in the Pulp Fiction clip below. But consider yourself warned: the video contains explicit language as Not Safe For Work as it comes.
Chevy Bolt 200-mile EV going into production near Detroit
Thu, Feb 12 2015Where there's smoke, there's fire, apparently. The rumors of the Chevy Bolt going into production have been proven correct, with an announcement this morning at the Chicago Auto Show that the 200-mile, all-electric Bolt will be built at the Orion Assembly facility near Detroit. GM didn't say exactly when the Bolt will be built, but GM North America president Alan Batey said in a statement that, "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." He's not kidding. GM is talking about a $30,000 price tag for an EV that can do twice as many electric miles as any non-Tesla mass-production EV today. Previous hints have the Bolt starting production next year for a market debut in 2017, and with all of the accuracy we've seen from these secret releases up to now, we're going to say this is probably accurate until we hear otherwise. We still have questions about the price tag, but for now we'll try to track down more information here in Chicago. Chevrolet Commits to Bolt EV Production Game-changing, long-range EV to be built at Orion Assembly facility in Michigan CHICAGO – Chevrolet this morning confirmed production of its next-generation pure electric vehicle, based on the Bolt EV concept. It will be built at General Motors' Orion Assembly facility near Detroit. GM North America President Alan Batey made the announcement ahead of the Chicago Auto Show. The Bolt EV concept was introduced last month at the North American International Auto Show in Detroit. "The message from consumers about the Bolt EV concept was clear and unequivocal: Build it," said Batey. "We are moving quickly because of its potential to completely shake up the status quo for electric vehicles." Leveraging the industry-leading battery technology found in the Chevrolet Volt and Spark EV, the Bolt EV concept was developed as a game-changing, long-range pure electric for all 50 states, designed to offer more than a GM-estimated 200 miles of range at a target price of around $30,000. The progressively styled concept vehicle features selectable driving modes for preferred driving styles, such as daily commuting, and it was designed to support DC fast charging. "We're proud that Chevrolet has decided to produce the Bolt EV here in Michigan at the Orion Assembly facility," Gov. Rick Snyder said. "Michigan unquestionably remains the global automotive leader.
Our favorite mid-engine Corvette theories and rumors
Tue, Sep 13 2016The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.
