1971 Chevrolet C-10 Cheyenne Super Clone on 2040-cars
Lexington, Mississippi, United States
This truck is a 1971 Chevrolet C/10 Cheyenne Super Clone. It has had a complete off frame restoration. The engine is a 400 Big Block with a 700R transmission and has power steering, factory AC, and power brakes. It has an oak wood floor in bed with chrome strips. It has custom vinyl seats. It has Rally Wheels, custom steering wheel, BF Goodrich Radial TA tires. Everything on the truck is either new or rebuilt. It is in excellent condition.
|
Chevrolet Cheyenne for Sale
- 1972 chevrolet c20 cheyenne no nr in phoenix az
- 1976 chevrolet cheyenne step-side pickup truck(US $16,000.00)
- 1996 chevy 2500 cheyenne truck with utility body and ladder racks(US $3,200.00)
- 1974 chevrolet c10 pickup base 5.7l
- 1971 c10 4x4 truck short bed chevrolet 454 big block cheyenne restored hot rod
Auto Services in Mississippi
Wards Wrecker Service ★★★★★
Wards Wrecker Service ★★★★★
Sudden Impact Collision & Accessories ★★★★★
Performance Autos ★★★★★
Mr. Muffler & More ★★★★★
Import Tech ★★★★★
Auto blog
Next-gen Chevy Volt will get 1.5-liter, four-cylinder engine
Tue, Oct 28 2014As General Motors gets ready to unveil the new Chevy Volt at the Detroit Auto Show in January, it's starting to reveal a few more details about the updated plug-in hybrid. Today should be fruitful on that front, thanks to an event GM is hosting today that focuses on the new Volt, and we've just had the first bit of new: a bigger engine is coming. Since the beginning, the Volt has used a 1.4-liter, four-cylinder engine as a range extender when the battery runs dry. The second-generation model will instead get a slightly larger 1.5-liter, four-cylinder engine that will be built in Flint, MI. That's a step up from the various engines that have been a part of the 2016 Volt's rumored mills, everything from a 1.0-liter or 1.2-liter three-cylinder to a 2.0-liter turbo. The confirmation about the new 1.5-liter powerplant was found in Automotive News, where we also heard again that GM is going to start building the new Volt's electric drive unit in Detroit, moving production up from Mexico. We will have more information on the 2016 Chevy Volt later today.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.
Motor Trend wheels the 2015 Corvette Z06
Tue, Nov 25 2014The new Chevrolet Corvette Z06 is capable of some absolutely wild metrics. Want proof? Carlos Lago from Motor Trend is here to break it all down. 60 miles per hour? 3.2 seconds. 60 to 0? 91 feet. Lateral acceleration? A staggering 1.16g, a figure that is the highest MT has ever recorded for a vehicle that isn't a race car. It's an utterly astonishing piece of work, this Z06, and just when you think it can't possibly get any more impressive, Randy Pobst hustles an auto-equipped Z06 around Road Atlanta in just 1:30. Aside from the eight-speed auto, Pobst's Z06 had the most aggressive aerodynamic package, the so-called Stage III. Take a look at the 650-horsepower Z06 in Motor Trend's latest video.