Find or Sell Used Cars, Trucks, and SUVs in USA

1970 Blue Ls6! 4 Speed 454 Power Steering Power Brakes Disc Front Restored on 2040-cars

Year:1970 Mileage:23900 Color: Blue /
 Black
Location:

North Andover, Massachusetts, United States

North Andover, Massachusetts, United States
Transmission:Manual
Body Type:Coupe
Vehicle Title:Clear
Engine:454cid/450hp 4bbl LS6
Fuel Type:Gasoline
For Sale By:Dealer
VIN: 136370B174905 Year: 1970
Make: Chevrolet
Model: Chevelle
Mileage: 23,900
Sub Model: LS6
Number of Doors: 2
Exterior Color: Blue
Transmission Description: M22 Rock Crusher 4 speed
Interior Color: Black
Drivetrain: Rear Wheel Drive
Number of Cylinders: 8
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Massachusetts

Willy`s Auto Supply ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Machine Shop
Address: 190 Centre St # 1, Abington
Phone: (508) 947-2100

Wheel Dynamix North ★★★★★

Automobile Parts & Supplies, Wheels, Tires-Wholesale & Manufacturers
Address: 135 W Central St, Holliston
Phone: (508) 647-6999

Weymouth Honda ★★★★★

New Car Dealers, Used Car Dealers, Wholesale Used Car Dealers
Address: 211 Main St, Minot
Phone: (781) 337-7400

Westgate Tire & Auto Ctr ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 98 Westgate Dr, Monponsett
Phone: (508) 559-6802

Westgate Tire & Auto Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 98 Westgate Dr, North-Weymouth
Phone: (888) 603-6146

Westgate Tire & Auto Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 98 Westgate Dr, Raynham
Phone: (888) 603-6146

Auto blog

Nissan Leaf sets new November sales record, Chevy Volt drops again

Tue, Dec 2 2014

When you talk to people in the plug-in vehicle industry, one theme you hear repeatedly is that the more plug-in cars that are out there, the better things are for everyone. One reason is that more EVs build a need for more public chargers, and more chargers mean more people see that plugging in is feasible. But there's still something to be said for old-fashioned competition, and in the sales race between the two long-running plug-in vehicles in the US, the Nissan Leaf is resoundingly beating the Chevy Volt for 2014. In fact, it won't be long before the EV's cumulative sales top the PHEV's. But that's a topic for another month. For now, we have the sales results from November. Unsurprisingly, Nissan set another monthly record (that is, the best Leaf sales in any November, the 22nd time in a row we've seen a monthly record) with 2,687 sales last month. That's up 34 percent over last November and up 35 percent year-to-date. Toby Perry, Nissan's director of electric vehicle marketing, said in a statement that, "Our 'Kick Gas' ad campaign and 'No Charge to Charge' launch in Chicago and Atlanta drove an increase in November Leaf sales. Even with gas prices falling across the country, consumers appreciate that the cost of driving a Nissan Leaf is still a fraction of that of a gas-powered car." Over on the Chevy side of the ledger, there were 1,336 Volt sales last month, down 30.4 percent from the 1,920 sold in November 2013. So far this year, Volt sales are down 16.4 percent and Chevy has sold 17,315 Volts in 2014. As we said last month, the Volt slump might be due to people waiting on the new version to make an appearance at the Detroit Auto Show next month before going on sale in the second half of 2015. So far in 2014, Nissan has sold 27,098 Leafs. Look for our detailed post of US green car sales in the near future. Until then, please discuss last month's Leaf and Volt sale in the comments, below. News Source: Nissan, General Motors Green Chevrolet Nissan Electric Hybrid PHEV ev sales hybrid sales

Meet the mother-daughter team that's worked on almost every Chevy Volt

Sun, May 11 2014

It's Mother's Day, and we're soft enough we love our mothers enough to share a new video from General Motors with you. In it, we meet Monique Watson (left) and Evetta Osbourne, a mother-daughter team that works at the Detroit-Hamtramck Assembly where GM makes the Chevy Volt (along with all of GM's other plug-in hybrids: the Opel Ampera, Holden Volt and Cadillac ELR). The two work side-by-side and have installed the lithium-ion battery pack on almost all of those vehicles - nearly 80,000 of them - since GM started making the pre-production Volts in 2009. In a prepared statement, Watson said that she likes working next to her mom, day in and day out, and they the two are totally in sync when it comes to putting the 400-pound, 16.5-kWh packs into the vehicle undersides. They two can also share stories throughout the day, and Watson said, "The arrangement has absolutely improved our relationship." Osborne started working at Detroit-Hamtramck in 1999, Watson since 2006. If you're driving a Volt today, you probably have them to thank for doing a bit of the work putting your car together. See a short video of them in action below. It's Always Mother's Day for Detroit-Hamtramck Duo Mother, daughter install lithium-ion battery pack in nearly all GM electric vehicles 2014-05-08 DETROIT – For Detroit resident Evetta Osborne, every day is Mother's Day. That's because she literally works side by side with her daughter, Monique Watson, at General Motors' Detroit-Hamtramck assembly plant. They have installed the lithium-ion battery pack on nearly every Chevrolet Volt, Opel Ampera, Holden Volt, and Cadillac ELR since production began. In fact, apart from vacation days and an occasional sick day, the mother-daughter duo has installed almost every battery pack since the Volt was in pre-production in 2009. The ELR launched earlier this year. All told – including Ampera – that's more than 80,000 electric vehicles. "We're a good team and our relationship is secondary when it comes to performing our jobs – but it's great to work alongside my daughter, said Osborne, a mother of five. Because the battery packs weigh more than 400 pounds each, automatic guided vehicles – robotic carts that use sensors to follow a path through the plant – deliver them just as the vehicle body structures glide into position overhead. The carts then lift the T-shaped packs, and Osborne and Watson guide them into the chassis and secure each one with 24 fasteners.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.