1967 Chevrolet Chevelle on 2040-cars
Urbana, Iowa, United States
Feel free to email: melissia.cugini@manlymail.net .
1967 CHEVELLE SS WITH A NUMBERS MATCHING 396 c.i. BIG BLOCK V8. THE CAR IS AS CLEAN AS THEY GET. IT HAD A FULL FRAME OFF RESTORATION. THE CAR RUNS AND DRIVES EXCELLENT
Chevrolet Chevelle for Sale
1966 chevrolet chevelle super sport(US $18,000.00)
1970 chevrolet chevelle coupe(US $19,400.00)
1964 chevrolet chevelle super sport(US $18,600.00)
1970 chevrolet chevelle(US $18,200.00)
1970 chevrolet chevelle super sport(US $18,000.00)
1970 chevrolet chevelle super sport (ss)(US $28,000.00)
Auto Services in Iowa
Yaw`s Auto Salvage ★★★★★
Witham Auto Centers ★★★★★
Wheelworks ★★★★★
Virgil`s Repair Service ★★★★★
Super Low Price Auto Glass ★★★★★
Mill Creek Machining ★★★★★
Auto blog
Our favorite mid-engine Corvette theories and rumors
Tue, Sep 13 2016The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.
2015 Chevy Spark will have lighter, smaller battery
Thu, May 15 2014As General Motors gets ready to release the 2015 Chevy Spark EV, it is retooling the Brownstown Battery Assembly to build a new battery system for the chirpy little electric car. The new Spark will lose a few pounds and kWh from its lithium-ion pack, but it will keep all of it's performance specs. The current Spark EV uses a 21-kWh lithium-ion battery pack with bits made by A123 Systems (known as B456 Systems during bankruptcy). For the 2015 model, GM is going to build a 19-kWh battery system in-house that will use 192 LG Chem cells. Losing a bit of energy capacity means that the battery system for the 2015 Spark EV will be 86 pounds lighter but it will keep the EPA-rated 82-mile range and 119 MPGe. The 2015 Spark EV also keeps its $26,685 (plus destination) starting price from the 2014 model. The car will once again qualify for a federal tax credit of up to $7,500. LG Chem also supplies the cells for GM's other plug-in vehicles from its facility in Western Michigan. The Brownstown production line currently builds the battery packs for the Chevy Volt, the Opel Ampera and the Cadillac ELR. You can read our first drive of the 2014 Chevy Spark here. Brownstown Battery Assembly Expands Capabilities Will build battery system for 2015 Chevrolet Spark EV 2014-05-14 DETROIT – General Motors will bring all its electric vehicle battery building capabilities in-house with production of battery systems for the 2015 Chevrolet Spark EV at its battery assembly plant in Brownstown, Mich. "Using our in-house engineering and manufacturing expertise enabled us to deliver a battery system that is more efficient and lighter than the 2014 Spark EV without sacrificing range," said Larry Nitz, executive director of GM global transmission and electrification engineering. "Our successful working relationship with LG Chem has allowed us to deliver a new battery system for the Spark EV that helps us to better leverage our economies of scale." A newly designed battery system features an overall storage capacity of 19 kWh and uses 192 lithium ion cells. The cells are produced at LG Chem's plant in Holland, Mich. The battery system weight of 474 lbs. is 86 pounds lighter than the system in the 2014 Spark EV. The Spark EV battery is built on a dedicated production line at Brownstown, which also manufactures complete battery packs for the Chevrolet Volt, Opel Ampera and Cadillac ELR.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.