Find or Sell Used Cars, Trucks, and SUVs in USA

327 Cid V8, Comp Cams, Msd Ignition, 11-inch Centerforce Clutch, 10-inch Rear, 4 on 2040-cars

US $32,995.00
Year:1968 Mileage:37843 Color: Black /
 Black
Location:

Charlotte, North Carolina, United States

Charlotte, North Carolina, United States
Transmission:Manual
Body Type:Coupe
Engine:N/A
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Dealer
VIN: 124378N300904 Year: 1968
Number of Cylinders: 8
Make: Chevrolet
Model: Camaro
Trim: N/A
Warranty: Vehicle does NOT have an existing warranty
Drive Type: N/A
Mileage: 37,843
Exterior Color: Black
Disability Equipped: No
Interior Color: Black
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in North Carolina

Wilkinson Automotive ★★★★★

New Car Dealers, Automobile Body Repairing & Painting, Used Car Dealers
Address: 1301 Douglas Dr, Gulf
Phone: (919) 775-3421

West Jefferson Chevrolet Buick Gmc ★★★★★

New Car Dealers, Used Car Dealers
Address: 1773 Mount Jefferson Rd, West-Jefferson
Phone: (336) 846-4636

Virginia Avenue Auto & Wrecker ★★★★★

Auto Repair & Service, Towing
Address: Mount-Holly
Phone: (704) 629-4981

Troutman Tire & Auto Inc ★★★★★

Auto Repair & Service, Tire Dealers, Gas Stations
Address: 133 N Main St, Catawba
Phone: (704) 528-6216

Toyota Specialist The ★★★★★

Auto Repair & Service, New Car Dealers
Address: 8600 N Nc Hwy 150, Welcome
Phone: (336) 764-3404

Tony`s Foreign Car Center ★★★★★

Auto Repair & Service
Address: 6418 Market St, Hampstead
Phone: (910) 392-9993

Auto blog

GM laying off 500 workers to slow Chevy Sonic production

Sat, Oct 24 2015

Due to slow sales of the Chevrolet Sonic and Buick Verano, General Motors is cutting a shift at the Orion Township plant that builds the pair. The move lays off about 500 workers, but most of them are expected to get offers to transfer to other factories, Automotive News reports. The move came just a day after GM announced adding 1,200 employees to the Detroit-Hamtramck plant. GM has been trying all year at the Orion Township factory to align production of the Sonic and Verano with their demand. The automaker first attempted idling the plant several times and eventually resorted to laying off about 100 workers. It also reduced the production rate there. With the huge rise in popularity of crossovers, demand for the plant's small cars is on the downturn. According to Automotive News, there's currently a 116-day supply of Sonics and 100 days of Veranos to sell. Delivers tell a similar tale because the Chevy is off 35.2 percent from January to September, and the Buick does little better with a 27.2 percent drop from the same period last year. While the situation at Orion Township might look rough now, big things are on the horizon. Soon, the new Chevy Bolt electric vehicle will be built there when it hits the market around 2017. Plus, the plant will also get a $245-million upgrade and 300 new jobs for another, unannounced vehicle.

Weekly Recap: GM plans massive new paint shop at Chevy Corvette factory

Sat, May 23 2015

General Motors is laying out some serious green to maintain the Chevy Corvette's expansive color palette. The automaker is breaking ground on a new paint shop this summer that's part of a $439-million investment to upgrade the 34-year-old Bowling Green, KY, factory that builds the Stingray. The massive new structure will total 450,000 square feet, nearly half the size of the current 1-million square-foot facility. Construction is expected to take two years and won't impact Corvette production. The upgrades include new robots that save paint and create a better finish, longer, more efficient ovens to bake in the finish, and LED lighting. There's also a dry scrubbing booth technology with a limestone handling system that eliminates waste. GM has invested $135 million in the factory in last four years for the changeover to build the C7 and to relocate its Performance Build Center to Bowling Green. The improvements continue to modernize the Kentucky factory, which has become a tourist attraction in its own right, as more than 56,000 enthusiasts visited it last year. The upgrades are part of a $5.4-billion investment GM confirmed in April that will remake its US footprint in the next three years. The Bowling Green expansion underscores GM's continued commitment to the Corvette, which sold nearly 38,000 copies around the world last year, an eight-year high. "With this major technology investment, we can continue to exceed the expectations of sports car buyers for years to come," North American manufacturing manager Arvin Jones said in a statement. OTHER NEWS & NOTES Takata recall hits 34 million vehicles The National Highway Traffic Safety Administration expanded the Takata airbag recall to an almost unthinkable 34 million vehicles on Tuesday. The recall is part of an agreement reached by the two sides where Takata admitted some of its airbag inflators have a defect, and the deal compels the company to comply with all future regulatory actions and investigations. Takata's airbag inflators were produced with "a propellant that can degrade over time" and lead to ruptures, NHTSA said. Six deaths have been attributed to the flaw worldwide. Investigations conducted by Takata, automakers, and others have not determined the exact cause of the inflator problem, but NHTSA said moisture appears to alter the propellant's chemical structure. It then ignites too rapidly, creates too much pressure that ruptures the inflator, and blasts shards of metal at passengers.

GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.

Thu, Jul 14 2022

All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.