1973 Camaro Rs Split Bumper Tribute. Built Bbc / 700r4 on 2040-cars
White Lake, Michigan, United States
Nice car recent restore. 5-6 years ago. Stored in garage last 5 years. New front Sheet metal. NPD. Decent paint 7/10 1972 Built BBC 2 bolt . turbo fire 400 396 .030 .550/.580 Lunati cam / lifters. ARP studs and bolt kit. Melling HV. Trend 3/8 Pushrods guide plates. 1967 427 heads. Small chamber quench. Flattop SP cast pistons Molly rings. Steel truck crank and truck rods. 700r4 transmission fresh reman. Welded in Frame ties. 4 point roll bar. Line lock on front. Engine on stand ready to drop in this weekend. Rebuilt 700R4 with new converter sitting in crate. $7,900 Listed Locally will pull if sold locally CL Michigan. |
Chevrolet Camaro for Sale
Camaro street, strip, or show
1967 rs camaro prowler orange silver stripe 350/300 th-350(US $28,900.00)
Certified preowned satellite radio on-star cd player cruise control pwr locks(US $17,888.00)
1968 chevrolet camaro 67 68 69(US $8,000.00)
Zl1 convertible / black wheels / new / 1.9% financing(US $59,900.00)
1995 chevrolet camaro z28 coupe 2-door 5.7l(US $1,700.00)
Auto Services in Michigan
White`s Auto Glass ★★★★★
Wheelock`s Muffler Center ★★★★★
Wellston Lube & Repair ★★★★★
Walt Sicard Car Co ★★★★★
Vyletel Volkswagen Buick GMC ★★★★★
Village Ford ★★★★★
Auto blog
Chevy admits there's confusion over Bolt and Volt names
Fri, Feb 20 2015Offering the possibility of 200 miles of driving range and the potential for a price of about $30,000, the Chevrolet Bolt is an incredibly enticing vehicle, and it has an opportunity to be a big player in the EV world. However, the hatchback has been plagued by one problem since the moment it debuted – the name. Bolt sounds very similar to Volt, Chevy's extended-range plug-in, and they can be easy to confuse in a conversation. That's not the best quality to have when trying to get a new vehicle's name out there among customers, and General Motors North America president Alan Batey told the Detroit Free Press that the company is aware of the problem. While the EV is definitely going into production, the model might be wearing a different moniker when it hits showrooms. "We're still in the decision phase. It could go either way," Batey said to the Free Press. He indicated the automaker still has about a year before a final decision is necessary. The Bolt will be built at GM's Orion Assembly plant in Michigan and will likely go on sale around 2017. That will put the Chevy on the market at roughly the same time as the 200-mile Tesla Model 3. Batey didn't seem too concerned, though. "Unlike Tesla, we can spread the cost over a whole lineup," he said to the Free Press. The future doesn't look quite so bright for the Spark EV, though. Batey suggested that it might not last once the longer-range Bolt fills that niche in the lineup. Related Video:
Ford also working on 200-mile EV to compete with Bolt, Model 3
Fri, Mar 6 2015The Chevrolet Bolt is on a lot of people's radars. You may have even noticed friends and colleagues who harbor very little interest in the automotive world, or anything labeled as "green," who have taken notice of a 200-mile electric vehicle coming out of Detroit. Mass appeal is the idea, after all. You can include Ford in the list of interested parties, in this case with the intention of taking direct aim at the Bolt – and, by proxy, the Tesla Model 3 – with an affordable, long-range EV of its own. Ford will unveil its own long-range EV, positioned to compete with Chevrolet, later this year, according to Automobile. Details are very scarce about Ford's plans, but we do know that the Bolt (or whatever the Chevy all-electric hatchback will end up being called) is expected to offer over 200 miles of driving between charges, with a sticker price around $30,000. The other major player, of course, is Tesla's smaller, more affordable sibling to the Model S. The Model 3, also slated to go on sale in 2017, should cost less than $40,000. While Tesla has established itself in the EV world, another long-range EV out of Detroit would win some customers from the California-based startup. For now, though, we'll just have to wait, as Ford remains tight-lipped about its plans for the car. Automobile predicts a possible unveiling at the Los Angeles Auto Show in November, what with California's EV mandate being a driver of strategy for various automakers. Most can agree, though, that a larger field of options – while not ideal for backers of the Bolt or Model 3 – will only benefit the car-buying public. Related Video: Featured Gallery Chevrolet Bolt EV Concept: Detroit 2015 Related Gallery Chevrolet Bolt EV Concept News Source: AutomobileImage Credit: Copyright 2015 Sebastian Blanco / AOL Green Rumormill Chevrolet Ford Tesla Electric Future Vehicles Chevy Bolt ford ev
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.