1969 Camaro Copo Reproduction on 2040-cars
Aurora, Ontario, Canada
Body Type:Coupe
Engine:454
Vehicle Title:Clear
Fuel Type:Gasoline
For Sale By:Private Seller
Interior Color: Black
Model: Camaro
Trim: coupe
Drive Type: RWD
Mileage: 222
Sub Model: Copo Reproduction
Warranty: Vehicle does NOT have an existing warranty
Exterior Color: Garnet Red
Chevrolet Camaro for Sale
- Restored isca hall of fame camaro z/28 302 4 speed(US $79,900.00)
- Super stock legend 1968 camaro z/28 old reliable(US $459,900.00)
- 1992 chevrolet camaro rs heritage edition convertible 2-door 5.0l limited editio
- 1 of 1 1969 chevrolet camaro ss usgp pace car convert!(US $179,900.00)
- Frame up built camaro z/28 rally sport zz430 v8 4 speed(US $59,900.00)
- 2010 2ss 6.2l auto victory red
Auto blog
GM veteran Bryan Nesbitt tapped to head Buick design
Sat, Jun 6 2015General Motors styling veteran Bryan Nesbitt (pictured above) took over a new role on Monday as executive director of global Buick design and global architectures. Andrew Smith, who previously did that job and also coordinated the look for Cadillac, has remained in charge of the pen at Caddy with this shift. Nesbitt rose to prominence when he designed the Chrysler PT Cruiser, according to Automotive News. He joined GM in 2001 and has been there ever since in multiple high-level roles. In 2007, he was appointed vice president of design for North America and was later briefly general manager of Cadillac in 2009-2010. Nesbitt took over as the vice president of GM's international operations design in China in 2011. This shuffle also moves Ken Parkinson, currently styling boss for Chevrolet trucks, to China as design vice president there. In addition, John Cafaro becomes the person in charge of the look for Chevy globally, rather than previously splitting that role between cars and trucks with Parkinson. GM Global Design Leadership Changes – effective June 1, 2015. Bryan Nesbitt, Design Vice President, GM China will repatriate to North America and assume the position of Executive Director, Global Buick and Global Architectures. He will be located in Warren, MI. Bryan will be the design Champion for Buick in the US and China. Ken Parkinson, Executive Director, Global Chevrolet Trucks and Global Architecture will assume the position of Design Vice President, GM China. He will be based in Shanghai, China. Andrew Smith, Executive Director, Global Cadillac and Buick Design will assume the position of Executive Director, Global Cadillac. He will continue to be the design Champion for the Cadillac brand. In addition, he will continue to lead the Global Color & Trim team. He will be based in Warren, Michigan. John Cafaro, Executive Director, Global Chevrolet Cars will assume the position of Executive Director, Global Chevrolet. He will be the design Champion for Chevrolet. In addition, John will lead the exterior components and accessories team. He will continue to be based in Warren, MI. The roles and responsibilities of Helen Emsley, Mark Adams, Carlos Barba, Clay Dean, Michael Simcoe, and Teckla Rhoades remain the same. Related Video: The video meant to be presented here is no longer available. Sorry for the inconvenience.
GM to idle car production at five factories as Americans continue CUV love affair
Mon, Dec 19 2016In case you needed another reminder that Americans have fallen out of love with sedans, General Motors today announced plans to idle five factories in January in a bid to cut its inventory to 70 days. Detroit-Hamtramck Assembly ( Buick LaCrosse, Cadillac CT6, Chevrolet Volt and Impala) and Fairfax Assembly in Kansas ( Chevy Malibu) will stop production for three weeks. Lansing Grand River ( Cadillac ATS and CTS, and Chevy Camaro) is going down for two weeks, while Lordstown, OH ( Chevy Cruze) and Bowling Green, KY ( Chevy Corvette) will go idle for a week each, Automotive News reports. GM's shutdown reflects a broader problem with the company's supply – at 847,000 vehicles, the company's supply increased unsteadily from a low of 629,000 units in January of 2016. That's more than a 25 percent increase in the past year. Citing information from Autodata, The Detroit News reports that at the end of November, GM had a 168-day supply of LaCrosses, 177 days' worth of Camaro, 170 days of Corvette, 121 days for Cruze, 119 days for ATS, 132 days for CTS, and 110 days of CT6. Meanwhile, inventory of the company's more popular vehicles is actually below the professionally accepted 60- to 70-day supply, The News reports. The Trax, Colorado pickup, and GM's full-size SUVs are sitting below 50 days and experiencing year-over-year sales increases. GM needs a rethink of its inventory levels, which is something that's apparently coming. "We're going to be responsible in managing our inventory levels," GM spokesman Jim Cain told The News. Another unnamed spokesman told Automotive News the company's day-to-day supplies would "fluctuate before moderating at year-end." But at least one analyst thinks this won't be the last time Detroit needs to stop production to level things out. "Incentives are elevated, residuals are declining, and rates are rising," Brian Johnson, an analyst with Barclays, told The News. "And while GM in particular may benefit in the months ahead from new product launches, it's important to recognize that GM's inventory is elevated at the moment, and it wouldn't surprise us if they need to announce another production cut – which could pressure the stock." Related Video: News Source: The Detroit News, Automotive News - sub. req.Image Credit: Paul Sancya / AP Plants/Manufacturing Buick Cadillac Chevrolet GM GMC Crossover SUV Sedan bowling green cadillac xt6 fairfax
UAW to vote on strike at Kentucky Corvette plant
Tue, 08 Apr 2014The current wait time for a new Chevrolet Corvette Stingray is well, not short. With word of a strike at the Bowling Green, KY factory responsible for seventh-generation sports car, though, that wait time could end up growing substantially.
Now, a strike is still a ways off. UAW Local 2164, which represents the 800 workers responsible for screwing the Corvette together, is set to vote on authorizing a strike today, but even if the employees give the action a go, it's far from a sure thing. According to The Tennessean, both regional and national union officials would need to put their stamp of approval on strike action.
"The membership has to vote to strike, but it's just a step in the process," said Gary Casteel, the UAW's Region 8 director and one of the people that would need to authorize a strike action. Casteel told The Tennessean, "It's purely a local situation, though. They are having some issues with the local management."