Find or Sell Used Cars, Trucks, and SUVs in USA

1969 Blue Camaro! 302cid 290hp 4 Speed Posi Ncb Exhaust Numbers Low Miles on 2040-cars

Year:1969 Mileage:79000 Color: Blue /
 Black
Location:

North Andover, Massachusetts, United States

North Andover, Massachusetts, United States
Transmission:Manual
Body Type:Coupe
Vehicle Title:Clear
Engine:302 cid 290 hp V8
Fuel Type:Gasoline
For Sale By:Dealer
VIN: 124379N624483 Year: 1969
Make: Chevrolet
Model: Camaro
Mileage: 79,000
Sub Model: Z 28
Transmission Description: 4 Speed Manual M21
Exterior Color: Blue
Number of Doors: 2 doors
Interior Color: Black
Drivetrain: Rear Wheel Drive
Number of Cylinders: 8
Condition: Used: A vehicle is considered used if it has been registered and issued a title. Used vehicles have had at least one previous owner. The condition of the exterior, interior and engine can vary depending on the vehicle's history. See the seller's listing for full details and description of any imperfections. ... 

Auto Services in Massachusetts

Wu Auto Repair ★★★★★

Auto Repair & Service
Address: 866 Washington St, East-Weymouth
Phone: (781) 337-6381

Whitehead Motors ★★★★★

Auto Repair & Service, Used Car Dealers, Brake Repair
Address: 40 Poplar St, Wenham
Phone: (978) 281-3202

Westgate Tire & Auto Center ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Tire Dealers
Address: 98 Westgate Dr, Elmwood
Phone: (888) 603-6146

USA Speedy Quik Lube Tire and Auto Center ★★★★★

Auto Repair & Service, Auto Oil & Lube
Address: 108 Newbury St, Wenham
Phone: (978) 535-3855

Ted`s Transmissions ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Auto Transmission
Address: 1338 Pleasant St, South-Weymouth
Phone: (781) 331-1843

Standard Auto Wrecking ★★★★★

Automobile Parts & Supplies, Used & Rebuilt Auto Parts, Automobile Salvage
Address: South-Weymouth
Phone: (508) 762-4341

Auto blog

Weekly Recap: GM plans massive new paint shop at Chevy Corvette factory

Sat, May 23 2015

General Motors is laying out some serious green to maintain the Chevy Corvette's expansive color palette. The automaker is breaking ground on a new paint shop this summer that's part of a $439-million investment to upgrade the 34-year-old Bowling Green, KY, factory that builds the Stingray. The massive new structure will total 450,000 square feet, nearly half the size of the current 1-million square-foot facility. Construction is expected to take two years and won't impact Corvette production. The upgrades include new robots that save paint and create a better finish, longer, more efficient ovens to bake in the finish, and LED lighting. There's also a dry scrubbing booth technology with a limestone handling system that eliminates waste. GM has invested $135 million in the factory in last four years for the changeover to build the C7 and to relocate its Performance Build Center to Bowling Green. The improvements continue to modernize the Kentucky factory, which has become a tourist attraction in its own right, as more than 56,000 enthusiasts visited it last year. The upgrades are part of a $5.4-billion investment GM confirmed in April that will remake its US footprint in the next three years. The Bowling Green expansion underscores GM's continued commitment to the Corvette, which sold nearly 38,000 copies around the world last year, an eight-year high. "With this major technology investment, we can continue to exceed the expectations of sports car buyers for years to come," North American manufacturing manager Arvin Jones said in a statement. OTHER NEWS & NOTES Takata recall hits 34 million vehicles The National Highway Traffic Safety Administration expanded the Takata airbag recall to an almost unthinkable 34 million vehicles on Tuesday. The recall is part of an agreement reached by the two sides where Takata admitted some of its airbag inflators have a defect, and the deal compels the company to comply with all future regulatory actions and investigations. Takata's airbag inflators were produced with "a propellant that can degrade over time" and lead to ruptures, NHTSA said. Six deaths have been attributed to the flaw worldwide. Investigations conducted by Takata, automakers, and others have not determined the exact cause of the inflator problem, but NHTSA said moisture appears to alter the propellant's chemical structure. It then ignites too rapidly, creates too much pressure that ruptures the inflator, and blasts shards of metal at passengers.

GM adds 1,200 jobs at Detroit-Hamtramck plant

Thu, Oct 22 2015

General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.

Watch this creative way to pull a truck's engine

Fri, 08 Mar 2013

Living in an apartment complex has its benefits, but for shade-tree mechanics who like/need to work on their own cars, it definitely has a number of disadvantages. Relatively simple tasks such as brake jobs and oil changes are difficult when you don't have dedicated driveway space, to say nothing of more in-depth repairs... like pulling an engine, for example.
For these types of challenges, a little ingenuity and plenty of muscle are needed to get the job done. Scroll down to watch these four men snatch the V8 out of a Chevrolet K1500 using nothing but a chain, landscape timber and good ol' fashioned brute strength. Good work, gentlemen.