Hd Silverado Diesel 6.5l Ext Cab 2wd Runs & Drives White With Tan Interior on 2040-cars
Tampa, Florida, United States
Interior needs work
Mileage exempt tires not much tread left Has a 5th Wheel hitch and heavy duty back hitch. |
Chevrolet C/K Pickup 3500 for Sale
1998 chevy silverado k3500 4x4 7.4l 454 time capsule 58,586 one-owner miles!!(US $13,995.00)
2002 chevy duramax silverado 3500 dually(US $9,000.00)
1987 chevy 3500 crew cab dually one ton no reserve
Custom chevy 3500 454 big block automatic 2wd
Chevrolet 3500 pickup truck dually black extended cab fifth wheel
1998 chevrolet 3500 silverado ext cab dually 7.4l 454 1 ton 4x4 98 k3500(US $8,495.00)
Auto Services in Florida
Z Tech ★★★★★
Vu Auto Body ★★★★★
Vertex Automotive ★★★★★
Velocity Factor ★★★★★
USA Automotive ★★★★★
Tropic Tint 3M Window Tinting ★★★★★
Auto blog
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
Nissan Leaf sets another monthly sales record, Chevy Volt remains steady
Mon, Nov 3 2014Here we go again. Another month in the books and another month of record sales by the Nissan Leaf in the US. For October, the world's best-selling pure EV sold 2,589 units, which is 29.3 percent more than October 2013. That makes it 20 times in a row that Nissan can say that last month sales were better than the same month a year before. All told, Nissan has sold 24,411 Leafs in the US this year, a new record, reflecting an overall Leaf sales rate that is up 35 percent, year-to-date. Nissan isn't stopping, either. A new TV ad, one that, "encourages consumers to kick gas" by saving money on fuel will start airing today in major markets, according to Toby Perry, director of Nissan's EV marketing. You can watch it below. As for the Chevy Volt, things remained steady last month in the face of a new model that's coming in the second half of 2015. Chevy sold 1,439 Volts last month, which is about the same as September (1,394) but down 28.8 percent from the October 2013 despite GM having its best overall US October sales this year since 2007. So far, 2014 Volt year-to-date sales are down 14.9 percent through the end of October compared to 2013. And that wraps up the flash report on monthly sales for these two long-standing plug-in vehicles in the US market. As always, we'll have our in-depth write-up of US green car sales available soon. For now, we await your comments, below. This content is hosted by a third party. To view it, please update your privacy preferences. Manage Settings.
GM adds 1,200 jobs at Detroit-Hamtramck plant
Thu, Oct 22 2015General Motors is making a big move at its Hamtramck, MI, factory, announcing it will add a second shift and hire over 1,200 workers within the next several months. It's expected that by early 2016, the factory will employ over 2,800 workers to build the Chevrolet Volt, Impala, Malibu, Cadillac ELR, and by early next year, the new CT6. According to GM Hamtramck spokesperson Courtney Zemke, 40 of the 1,200 positions are for salaried employees, while the remainder will be hourly positions. As for where these employees will go, positions are being made available across the factory, so GM isn't focusing on any particular area for its new hires. It's a similar story behind the hiring surge itself. GM said in its press release that the "second shift is necessary to meet forecasted market demand," a position Zemke reiterated. It's a matter of demand across the plant's portfolio, rather than any one particular product seriously outstripping supply. Naturally, the United Auto Workers is happy with the move. "The workforce at Detroit-Hamtramck is second to none," UAW Local 22 Shop Chairman Don LaForest said in the attached release. "We appreciate the opportunity to expand our UAW-GM family." Hiring is going on now, with the second shift slated to get underway in early 2016. GM's Detroit-Hamtramck Assembly to Add Second Shift and More Than 1,200 Jobs Plant will nearly double its workforce by early 2016 2015-10-22 DETROIT – General Motors is nearly doubling its workforce at Detroit-Hamtramck Assembly by adding a second shift and more than 1,200 hourly and salaried jobs. The addition of a second shift will increase the plant's workforce to approximately 2,800 people when hiring is completed. The second shift is necessary to meet forecasted market demand for the five cars produced at Detroit-Hamtramck. "This is the result of the award-winning vehicles Detroit-Hamtramck produces and the confidence GM has in our team to build world-class quality for our customers," said Plant Manager Gary West. Second shift hiring is underway, and the shift is scheduled to begin operations in early 2016. "The workforce at Detroit-Hamtramck is second to none," said UAW Local 22 Shop Chairman Don LaForest. "We appreciate the opportunity to expand our UAW-GM family." The 4.1 million-square-foot Detroit-Hamtramck Assembly opened in 1985. GM has invested $1 billion in the plant over the last six years, making it one of the company's most-agile manufacturing facilities in North America.