Find or Sell Used Cars, Trucks, and SUVs in USA

1981 Chevy/gm 4x4 Pickup Truck on 2040-cars

US $7,000.00
Year:1981 Mileage:107000
Location:

West Palm Beach, Florida, United States

West Palm Beach, Florida, United States
Advertising:

SELLING MY 1981 PICKUP . IT WAS 1981 2500 GM BUT DID NOT LIKE THE LOOK SO TURNED IT IN TO WHAT U SEE .I OWNWED IT OVER 18 YEARS NEVER SO THE ROAD WHEN I OWNED IT . TO MUCH WORK , LOST INTERISTED IN IT . MOTOR IS A 350 4 BOLT MAIN ,  NEW GAS TANK, RADIATOR,  RUBBER ,  FUEL LINES,  BRAKE LINES,  LIGHTS,WIRES,  RUG,INTERIOR HAS BEEN DONE. ALL GAUGES WORK . SO MANY NEW PARTS OVER THE YEARS CAN'T LIST THEM ALL.  YOU CAN ASK ANYTHING YOU WANT,  JUST NEEDS A NEW HOME , IT TOOK LONGER THAN I THOUGHT ,GAVE UP ON IT MOVED ON TO OTHER PROJECT. 


On Oct-14-13 at 14:16:44 PDT, seller added the following information:

SELLING MY 1981 PICKUP. IT WAS A 1981 2500 GM BUT I DID NOT LIKE THE LOOK SO I TURNED IT INTO WHAT U SEE. I OWNED IT OVER 18 YEARS NEVER SAW THE ROAD WHEN I OWNED IT.  TO MUCH WORK, LOST INTERISTED IN IT. MOTOR IS A 350 4 BOLT MAIN, NEW GAS TANK, RADIATOR, RUBBER, FUEL LINES, BRAKE LINES, LIGHTS, WIRES, RUG, INTERIOR HAS BEEN DONE.  ALL GAUGES WORK. SO MANY NEW PARTS OVER THE YEARS CAN'T LIST THEM ALL. YOU CAN ASK ANYTHING YOU WANT, IT JUST NEEDS A NEW HOME, IT TOOK LONGER THAN I THOUGHT, GAVE UP ON IT MOVED ON TO OTHER PROJECT.

Auto Services in Florida

Yow`s Automotive Machine ★★★★★

Auto Repair & Service, Automobile Machine Shop, Industrial Equipment & Supplies
Address: 6219 15th St E, Anna-Maria
Phone: (941) 758-6466

Xtreme Car Installation ★★★★★

Auto Repair & Service, Automobile Parts & Supplies, Automobile Accessories
Address: 3663 NW 79th St, Bay-Harbor-Islands
Phone: (305) 836-0118

Whitt Rentals ★★★★★

New Car Dealers, Car Rental
Address: 1807 N Nova Rd, Bunnell
Phone: (386) 252-0011

Vlads Autobahn LLC ★★★★★

Auto Repair & Service
Address: 5145 Commercial Dr, West-Melbourne
Phone: (321) 622-5665

Village Ford ★★★★★

Auto Repair & Service, New Car Dealers, Used Car Dealers
Address: 11660 SE US Highway 441, Ridge-Manor-Estates
Phone: (352) 233-2900

Ultimate Euro Repair ★★★★★

Auto Repair & Service
Address: 2011 SW 70th Ave, West-Hollywood
Phone: (954) 475-0225

Auto blog

Sunday Drive: Trucks and SUVs of all shapes and sizes

Sun, Nov 5 2017

The American automotive marketplace is dominated by trucks and SUVs, and so was the last week of coverage on Autoblog. By far, the most popular story of the week was our First Drive of the 2018 Lincoln Navigator. It may look like an old-school lumberer, but in reality Lincoln's flagship is a thoroughly modern, turbocharged-V6-powered, three-row, luxury people mover. The Jeep Wrangler is the world's most recognizable vehicle. So it's no surprise that the next version looks a whole heck of a lot like the last one, and the one before. It's all in the details, which is why we were so excited when Jeep decided to unleash a trio of images showing both two- and four-door Wranglers for us to dissect ahead of the SUV's official debut at the L.A. Auto Show later this year. Past that, spy photos of the next Chevy Silverado and Ram 1500 were predictably popular. See both of those below, and the cap it all off, check out the entire week's worth of SEMA coverage – including the bonkers Hennessey VelociRaptor 6x6 – in our mega image gallery at the bottom of this post. Enjoy! As always, tune in to Autoblog next week for a front-row seat to all the happenings worth following in the automotive industry. 2018 Lincoln Navigator First Drive | From black sheep to flagship 2018 Jeep Wrangler revealed: First photos released before L.A. Auto Show debut 2019 Chevy Silverado looks slim and clean beneath the camo 2019 Ram 1500 gets vertical touchscreen infotainment system 2017 SEMA Show Mega Photo Gallery Chevrolet Jeep Lincoln RAM Truck SUV recap sunday drive

Our favorite mid-engine Corvette theories and rumors

Tue, Sep 13 2016

The mid-engine Corvette! We just saw blurry photos through the foliage, and are hearts are all aflutter because it means that this car is real. And it's the most " never before" Corvette since 1984. Which leads us to all kinds of wacky theories and speculation. Everybody knows something or heard from a guy. None of those guys (or gals) from GM are talking to Autoblog, to be clear. But that won't stop us from stirring the pot. Let's go over a few point-by-point. The pushrod engine will be replaced by an overhead-cam V8 Car and Driver has repeatedly reported that an overhead-cam engine will come after the mid-engine Corvette's debut with an old-school pushrod. We've heard the same thing firsthand, albeit from a source with no connection to the development of the Corvette or powertrain. "At some point two valves can't pass future emissions regulations," said the guy we know. While the pushrod engine is compact, the design makes it difficult - if not impossible - for sophisticated variable valve timing (and lift) systems that control combustion with more precision. Hasty conclusion: The pushrod engine has a finite life in front of it. This one's a lock, it's a just a matter of when. Bowling Green's new paint shop is really the mid-engine assembly line Credit to Reddit for this one. Like we said, everybody knows a guy. But let's look deeper. The new paint facility costs $439 million dollars and adds 450,000 square feet, almost half the size of the existing plant. Plus GM announced another $290 million in upgrades at Bowling Green Assembly. That sure sounds like a lot of money, but you can actually spend that much on a paint booth. Porsche spent 500 million Euros (about $561 million dollars) to add the Macan assembly to its Leipzig, Germany plant in 2014. Chrysler shelled out $850 million for a paint shop in Sterling Heights, Michigan. GM spent $600 million for a new paint shop at the Fairfax (Kansas City) plant. Honda, on the other hand, is working on a thrifty $210 million project in Marysville, Ohio that includes a 300,000 square foot expansion, and the low-volume Acura NSX facility only cost $70 million. Hasty conclusion: The square footage and cost could easily mean a new assembly line instead of (or in addition to) a paint line. And if the NSX plant was really that cheap, GM could have hidden a similar sum in its existing announcements.

GM pickup truck plant in Flint to add 1,000 assembly workers

Tue, Feb 5 2019

FLINT, Mich. — General Motors said Tuesday it will add 1,000 workers to build new heavy-duty pickup trucks at its plant in Flint, Michigan, and will give priority to GM workers who were laid off elsewhere. The announcement comes the day after GM said it was starting to hand pink slips to about 4,000 salaried workers in the latest round of a restructuring announced in late November that will ultimately shrink its white-collar workforce in North America by 15 percent out of 54,000. GM has come under fire from U.S. President Donald Trump and Midwestern lawmakers for its plans to stop production at five North American factories and cut up to 15,000 jobs in all. The automaker has said it is trying to find new jobs for 1,500 U.S. hourly workers at the affected plants. Flint's truck plant could be a haven for many of these employees. Sales of heavy-duty pickups in the United States have grown to more than 600,000 vehicles a year, up more than 20 percent since 2013, according to industry data. Prices for luxury models can easily top $70,000. GM on Tuesday will celebrate the launch of a new generation of heavy-duty GMC and Chevrolet pickups at the assembly plant in Flint, Michigan, that is now building all such trucks for the company. Elsewhere in the company on Monday, two people briefed on the cuts in the white-collar salaried workforce said GM is cutting hundreds of jobs at its information technology centers in Texas, Georgia, Arizona and Michigan and more than 1,000 jobs at its Warren, Michigan Tech Center. GM is filing new required mass layoff notices with state agencies and disclosed the cuts to lawmakers. The largest U.S. automaker announced in November it would cut a total of about 15,000 jobs and end production at five North American plants. The cuts include eliminating about 8,000 salaried workers, or about 15 percent. GM cut about 1,500 contract workers in December and said 2,300 salaried workers accepted buyouts, officials said. "These actions are necessary to secure the future of the company, including preserving thousands of jobs in the U.S. and globally. We are taking action now while the overall economy and job market are strong, increasing the ability of impacted employees to continue to advance in their careers, should they choose to do so," GM spokesman Pat Morrissey said, adding the bulk of the cuts should be completed in the next two weeks. Morrissey said GM would provide salaried workers with severance packages and job placement services.