S10 Blazer Bagged & Bodied on 2040-cars
Piscataway, New Jersey, United States
Engine:4.3L V6
Vehicle Title:Clear
For Sale By:Private Seller
Sub Model: S-10 blazer
Make: Chevrolet
Number of Cylinders: 6
Model: Blazer
Trim: S10
Warranty: Vehicle does NOT have an existing warranty
Drive Type: RWD
Mileage: 190,000
Chevrolet Blazer for Sale
01 s10 chevy blazer ls 4x4 4.3l v6 28,271 actual miles tow package hitch clean(US $7,000.00)
1984 chevy 4x4 frame off restored custom deluxe show truck 4wd rare hot rat rod
1986 m 1009 k5 blazer 6.2 diesel(US $2,000.00)
1969 custom 4wd k5 blazer(US $28,000.00)
1999 chevy blazer 4x4(US $1,800.00)
Chevrolet chevy trail blazer 4d leather runs good eddie bauer sport utility suv(US $2,890.00)
Auto Services in New Jersey
Yellow Bird Auto Diagnostic ★★★★★
White Horse Auto Pke ★★★★★
Vulcan Motor Club ★★★★★
Ultimate Drive Auto Repair ★★★★★
Sparx Auto ★★★★★
Same Old Brand ★★★★★
Auto blog
Autoblog Podcast #389
Wed, Jul 16 2014Episode #389 of the Autoblog podcast is here, and this week, Dan Roth, Chris Paukert, and Mark Pereira from Autoblog Canada talk about Johan deNysschen's move to Cadillac, rumors of more BMW nomenclature changes, a second generation for the Subaru BRZ, and cars from 2004 that we miss. We start with what's in the garage and finish up with some of your questions, and for those of you who hung with us live on our UStream channel, thanks for taking the time. Check out the new rundown below with times for topics, and you can follow along down below with our Q&A. Thanks for listening! Autoblog Podcast #389: The video meant to be presented here is no longer available. Sorry for the inconvenience. Topics: Johan de Nysschen moves to Cadillac BMW model designations changing even more Subaru BRZ getting second generation Cars We Miss In the Autoblog Garage: 2014 Ducati 899 Panigale 2015 Hyundai Sonata 2015 Volkswagen GTI 2015 Chevrolet Silverato 2500 Diesel Hosts: Dan Roth, Chris Paukert, Mark Pereira Runtime: 01:59:10 Rundown: Intro and Garage - 00:00 Johan deNysschen - 36:12 BMW Nomenclature - 53:58 BRZ - 56:27 Cars We Miss - 01:05:07 Q&A - 01:30:09 Get the podcast: [UStream] Listen live on Mondays at 10 PM Eastern at UStream [iTunes] Subscribe to the Autoblog Podcast in iTunes [RSS] Add the Autoblog Podcast feed to your RSS aggregator [MP3] Download the MP3 directly Feedback: Email: Podcast at Autoblog dot com Review the show in iTunes Auto News Hirings/Firings/Layoffs Podcasts BMW Cadillac Chevrolet Hyundai Subaru Volkswagen
GM, Pilot will build EVgo fast chargers at 500 truck stops across U.S.
Thu, Jul 14 2022All of our maps showing electric vehicle charging stations across the U.S. are going to need an update. Today, General Motors, Pilot and EVgo announced plans to work together on a nationwide DC fast charging network. The plan calls for 2,000 charging stalls that can deliver up to 350 kW to be installed at up to 500 Pilot and Flying J travel centers in the U.S. The goal is to have DC fast chargers available in 50-mile intervals across the country. The new charging stations will feature GM's "Ultium Charge 360" branding and "Pilot Flying J" logos but will not be limited to drivers of GM EVs. The plugs will use CCS connectors and be available to anyone. GM EV owners can take advantage of benefits, including the ability to make exclusive reservations, get discounts on charging costs and streamline the charging process with Plug and Charge and in-vehicle apps that can provide real-time charger availability. The first installation phase will take place in 2023, and "the bulk of the installations" should be completed by 2025, EVgo CEO Kathy Zoi said during a conference call with reporters announcing the plan. "We're gonna get going immediately and commence all of that engineering and planning stuff," she said. "We've got a pretty orderly plan." Pilot CEO Shameek Konar said the company expects the new EV charging stations to coexist with the current fuel infrastructure. "An average Pilot Flying J location is about 10 acres," Konar said. "This will be in addition to all of our gas pumps. The way I think about it is, this is a new source of energy that is going to coexist with gas for quite some time. We can debate how long, but we need to serve both groups of customers." Installing DC fast chargers at hundreds of Pilot's travel centers — aka truck stops — means there should be food, drinks, restrooms, WiFi and even showers available while you wait for an EV to charge. Pilot recently announced its “New Horizons” plan that will invest $1 billion in upgrading Pilot travel centers with more premium amenities, including expanded seating and lounge areas. While the exact amount of time it will take to charge an EV using these new stations will vary on the EV and its current state of charge, most EVs can refill from a low state of charge to around 80 percent in 20-30 minutes on a fast charger. The new stations are future-proofed to deliver up to 350 kW, a charge rate that few EVs today can handle.
Recharge Wrap-up: EVs poll well in Portland, Tesla seeks office space
Tue, Aug 5 2014In a poll of drivers in Portland, more than 80 percent said they would be driving an EV in the next 10 years if they weren't already. The poll was small and not scientific, with just 218 votes cast, but it does reflect a slice of a certain population with changing attitudes toward electric mobility, and 80 percent is an impressive figure. Additionally, 43 percent of respondents planned to have an EV in the next five years, and only 18 percent said they prefer gasoline-powered vehicles. With EVs in many ways repeating the adoption process that hybrids went through a decade ago, the five- or ten-year timeframe for more widespread use seems only natural. Read more at the Portland Business Journal. San Francisco Mayor Ed Lee parks like an idiot, or rather, his security detail does. His Chevrolet Volt has been ticketed for parking six times since he took office. Granted, those street-sweeping signs are tough to keep track of, but his car has been photographed blocking at a bus stop while grabbing a burrito (who hasn't sinned in the name of a delicious burrito?), and was even caught parked in a crosswalk. The tickets were all dismissed. Read more from the SF Gate. Tesla is looking for office space in Silicon Valley. As the electric car company continues to search for a place to build its $4- to $5-billion battery Gigafactory, it also needs some real estate to expand its operations near its Palo Alto home. Tesla has expanded from 3,000 to 6,000 California-based employees since the end of 2012, and plans to add 500 more by the end of the year. It is currently looking for 200,000 to 300,000 square feet of office space close to its Fremont factory, according to sources in the real estate industry. Read more at the Silicon Valley Business Journal. Related Gallery 2014 Chevrolet Volt View 11 Photos News Source: Portland Business Journal, SF Gate, Silicon Valley Business JournalImage Credit: Paul Sakuma / AP Green Chevrolet Tesla Electric recharge wrapup portland silicon valley parking ticket